Forwards Insp Rept 50-482/93-29 on 931024-1204 & Notice of Violation
ML20059C300
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 12/29/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Carns N
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20059C302 List:
References
NUDOCS 9401050086
Download: ML20059C300 (6)


See also: IR 05000482/1993029

Text

p#88Cu

UNITED STATES

[

?g

NUCLEAR REGULATORY COMMISSION

r

REGloN IV

l

,

8

611 RYAN PLAZA DRIVE, SulTE 400

o,

8

AR LiNGTO N, T E X AS 76011-8064

e

.

.....

DEC 2 91993

4

Docket:

50-482

License:

NPF-42

,

Wolf Creek Nuclear Operating Corporation

ATTN: Neil S. Carns, President and

Chief Executive Officer

P.O. Box 411

Burlington, Kansas 66839

SUBJECT: NRC INSPECTION REPORT 50-482/93-29 (NOTICE OF VIOLATION)

This refers to the inspection conducted by Messrs. G. A. Pick and

J. F. Ringwald of this office from October 24 to December 4, 1993. The

inspection included a review of activities authorized for your Wolf Creek

Generating Station facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress. The purpose of the inspection was to determine

,'

whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of this inspection, certain licensed activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice).

Violation A pertains to four instances of failure of

licensed operators to maintain cognizance of control panels and permits. Your

staff immediately initiated appropriate corrective actions when the events

l

occurred.

Because of your recent initiatives to reduce operator errors and

ongoing corrective actions, as discussed at a public meeting on November 9,

1993, no response tc this violation is required.

t

Violation B pertains to two examples of failure to properly restore from

clearance orders by maintenance personnel that resulted from a breakdown in

coordination and communication. This violation is of concern because improper

equipment clearances are hazardous to both plant and personnel safety.

!f

meiosooes e m 2,

PDR

ADOCK e5000482

/

8

G

PDR

.

-

,

-

. -.

--

.

.-

.

.

.m

1

!

.

Wolf Creek Nuclear Operating

-2-

!

Corporation

t

i

!

Violation C resulted from identification by NRC of inadequate corrective

l

actions implemented within the maintenance department related to clearance

!

orders. This is of concern because personnel failed to recognize that the

4

t

corrective actions applied within a single maintenance group affected the

entire department.

l

I

Although 10 CFR 2.201 provides for a written statement of explanation to this

office within 20 days of your receipt of this Notice, we note that Violation A

f

was corrected and those actions, including your root cause analysis,' were

reviewed during this inspection. Therefore, no response with respect to

",

Violation A is required. You are required to respond to this letter and

should follow the instructions specified in the enclosed Notice when preparing

your response to Violations B and C.

In your response, you should document

t

the specific actions taken and any additional actions you plan to prevent

recurrence. After reviewing your response to this Notice, including your

~

proposed corrective actions and the results of future inspections, the NRC

'

will determine whether further NRC enforcement action is necessary to ensure

compliance with NRC regulatory requirements.

During this period, the inspector identified that instrumentation and control

personnel inappropriately dispositioned repair of a component on a work

.

request that violated licensee procedures and Technical Specification 6.8.1.a.

l

This violation is not being cited because the criteria in paragraph VII.B.1,

'

Appendix C to 10 CFR Part 2 of the NRC's " Rules of Practice," were satisfied.

This violation had limited significance because of adequate redundant

indicators, and your' staff took appropriate actions in response to the

problem.

q

It is our understanding that the operations manager committed to upgrade your

slave relay test procedures prior to their next performance but no later than

March 31, 1994.

Personnel will modify the procedures to ensure that operators

!

can restore components that change position during slave relay tests to their:

- '

as-found positions.

If our understanding of these commitments differs from.

1

yours, please contact me immediately.

I

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice,"_ a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

,

The responses directed by this letter and tne enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

i

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

i

!

1

.)

. . -

-.

-

-

-.

- . - -.

.

.

-,

..

!

Wolf Creek Nuclear Operating

-3-

,

Corporation

,

!

Should~you have any questions concerning this inspection, we-will be pleased

to discuss them with you.

]

.

Sincerely,.

f

'

,

a

a

d,.BillBeach, Director

Division of Reactor Projects

Enclosures:

,

'

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

-

50-482/93-29

,

cc w/ enclosures:

Wolf Creek Nuclear Operating Corp.

!

ATTN: Otto Maynard, Vice President

Plant Operations

P.O. Box 411

-

Burlington, Kansas 66339

l

.

!

Shaw, Pittman, Potts & Trowbridge

ATTN: Jay Silberg, Esq.

2300 N Street, NW

Washington, D.C.

20037

l

Public Service Commission

'

ATTN:

C. John Renken

Policy & Federal Department

i

'

P.O. Box 360

Jefferson City, Missouri 65102

,

l

U.S. Nuclear Regulatory Commission

'l

ATTN:

Regional Administrator, Region III

799 Roosevelt Road

'j

Glen Ellyn, Illinois 60137

i

Wolf Creek Nuclear Operating Corp.

j

'

ATTN: Kevin J. Moles

Manager Regulatory Services

P.O. Box 411

Burlington, Kansas 66839

.

.

.

.

..

~

,

- .

-.

--

.

.

..

i

. ..

1

1

i

-

Wolf Creek Nuc' lear Operating

-4-

Corporation

,

Kansas Corporation Commission

ATTN:

Robert Elliot, Chief Engineer

Utilities Division

,

'

1500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027

-;

Office of the Governo

.

State of Kansas

Topeka, Kansas 66612

Attorney General

,

1st Floor - The Statehouse

Topeka, Kansas 66612

-

Chairman, Coffey County Commission

Coffey County Courthouse

Burlington, Kansas 66839-1798

'l

2

.

Kansas Department of Health

and Environment

Bureau of Air & Radiation

ATTN: Gerald Allen, Public

i

Health Physicist

Division of Environment

.

-

Forbes Field Building 283

Topeka, Kansas 66620

,

3

i

e

s

!

i

[

t

i

f

.

F

-

I

i'

I

L

I

d

-.

..

- - -

. - .

- - . . . .

-

, - . . . - .

. . - .

- -.. .. - - _... - .._ ..,. ..-

.- -. - -- - -

-

.

.

J

.

DEC 2 91993

Wolf Creek Nuclear Operating

-5-

J

Corporation

,

b'cc via E-Mail D. Sullivan (DJS)

)

bcc to DMB (IE01)

'

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

.

Section Chief (DRP/A)

DRSS-FIPS

,

Section Chief (RIII, DRP/3C)

RIV File

SRI, Callaway, RIII

MIS System

Lisa Shea, RM/ALF, MS: MNBB 4503

Project Engineer (DRP/A)

Section Chief (DRP/TSS)

J. F. Ringwald

D. N. Graves, SRI /CP

G. A. Pick

A. B. Beach (D:DRP)

1

i

!

!

.

P

!

RIV: SRI:D8P/A

RI:DRP/B )

PE:QRP/B

,7

C:DRP/B

D: Qdh

GAPick:sah

JFRingwalcgf

TRe [ [w

LAYandell L9 1

ABIedh

12/13/93 N

tt/f/93 N

/,Q/3//d3

(L/19/93

II/Zi/93

!

%

1v

i

!

- .

-

. - - - -

4

f

.

4

DEC 2 91993

Wolf Creek Nuclear Operating

-5-

Corporation

b'c via E-Mail D. Sullivan (DJS)

!

c

bec to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector

Section Chief (DRP/A)

DRSS-FIPS

7

Section Chief (RIII, DRP/3C)

RIV File

!

SRI, Callaway,.RIII

MIS System

Lisa Shea, RM/ALF, MS: MNBB 4503

Project Engineer (DRP/A)

Section Chief (DRP/TSS)

J. F. Ringwald

D. N. Graves, SRI /CP

G. A. Pick

A. B. Beach (0:DRP)

,

f

r

!

!

RIV:",RI:DRP/A

RI:DRP/B I