~3.(
bk.. )
OCT 2 51993
Docket No. 50-309
Mr. Charles D. Frizzle
President
Maine Yankee Atomic Power Company
83 Edison Drive
Augusta, Maine 04336
Dear Mr. Frizzle:
,
SUBJECT:
NRC INSPECTION NO. 50-309/93-22
This transmits the results of the resident inspection activities performed between August 30
and October 11, 1993 by Messrs. J. Yerokun and W. Olsen at the Maine Yankee Atomic
Power Plant, Wiscasset, Maine. The inspection involved observations of plant activities and.
equipment, interviews, and document reviews. The findings were discussed with members
of your staff during the inspection period and with Messrs. G. Leitch, R. Blackmore and
others of your staff at the exit meeting held on October 13, 1993.
There was good management involvement in plant activities. Outage activities were
conducted in a controlled and safe manner. Core reload and startup activities were
conducted safely and without incident.
We noted a failure to properly follow a radiation protection procedure which resulted in the
-
loss of a check source for two days. In accordance with 10 CFR 2, Appendix C, this
'
violation is not being cited because the safety significance was minimal and you promptly
'
identified and corrected the situation.
,
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of this letter and
its enclosures will be placed in the NRC Public Document Room.
.
Thank you for your cooperation.
Sincerely,
0:igins! Eigned By:
h!.nes C. Linville
i
James C. Linville, Chief
290003
Projects Branch No. 3
'
Division of Reactor Projects
Enclosure: NRC Region I Inspection Report 50-309/93-22
j
9311010031 931025
,
ADOCK 05000309
G
OFFICWu RECORD COPY
'\\
,
- . .
...
-.
.
..
.
.
--
- -.
-
r-
t
. . . .
.*
4
.
OCT 2 51993 '
Mr. Charles D. Frizzle-
2
cc w/ encl:
i
G. Leitch, Vice President,' Operations
P. Anderson, Project Manager (Yankee Atomic Electric Company)
R. Blackmore, Plant Manager
L. Diehl, Manager of Public and Governmental Affairs
J. Ritsher, Attorney (Ropes and Gray)
,
P. Dostie, State Nuclear Safety Inspector
P. Brann, Assistant Attorney General
U. Vanags, Maine State Planning Office
,
C. Brinkman, Combustion Engineering, Inc.
First Selectmen of Wiscasset
Maine State Planning Officer
,
'
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
.
K. Abraham, PAO (2 copies)
l
NRC Resident inspector
<
4
9
OFFICIAL RECORD COPY
-
_
_
-_
_
_
.
. ..
. _ .
. ..
.-.
._ . -
.
..
.~
.
.
.'
.
C2
Mr. Charles D. Frizzle
3
bec w/ encl:
Region 1 Docket Room (with concurrences)
W. Lazarus, DRP
D. Lew, DRP
'-
'
M. Oprendek, DRP
,
bec w/enci (VIA E-MAIL):
V. McCree, OEDO
E. Trottier, LPM, NRR
W. Butler, NRR
,
i
RI:DRP
RI:DRP
RI:D
OA
Yerokun/meo
Lazarus
L w le
p/2Jff3
jp yff)7
10/19/93
OFFICIAL RECORD COPY
A:MY9322.MEO
,,. -
_
-
,