Forwards Insp Repts 50-266/93-17 & 50-301/93-17 on 931115-18.Noncited Violation Noted
ML20059B787
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/17/1993
From: Pederson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20059B791 List:
References
NUDOCS 9401040246
Download: ML20059B787 (3)


See also: IR 05000266/1993017

Text

{{#Wiki_filter:-. . - . . . DEC 171933 Docket No. 50-266 -Docket No. 50-301 , Wisconsin Electric Power Company ATTN: Mr. Robert Link Vice President Nuclear Power

231 West Michigan Street - P379 Milwaukee, WI 53201

Dear Mr. Link: SUBJECT: PHYSICAL SECURITY INSPECTION AT POINT BEACH o This refers to the inspection conducted by Mr. T. J. Madeda of this office on November 15-18, 1993. The inspection included a rcview of authorized - activities for your Point Beach Nuclear facility. At the conclusion of this inspection, the findings were discussed with those members of your staff ' identified in the enclosed report.

Areas examined during.the inspection are identified in the report. Within these areas, the inspection consisted of selective examinations of procedures - and representative records, and interviews with personnel. Based on the results of this inspection, certain of your escort activities appeared to be in violation of NRC requirements, as specified in the enclosed Notice of Violation (Notice). Although of limited security significance, the violation is of concern cecause previous corrective action for a related i violation had not been fully effective. Generally, however, security performance was effective and we noted the marked improvement in equipment . availability due to your efforts. .; In addition, during this inspection, certain other of your activities related to protected area barriers appeared to be in violation of NRC requirements. However, as described in the enclosed report, you identified this violation

and to encourage and support licensee initiatives for self-identification and j correction of violations, the violation is not- being cited because the criteria specified in Section VII.B of the " General Statement of Policy and Procedure for NRC Enforcement Actions" (Enforcement Policy, 10 CFR Part 2, Appendix C) were satisfied. You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your 9401040246 931217 PDR ADDCK 05000266- G PDR Enclosura contsinoOPRA i eaa en ggiiemmemmiiMGN "" j qi L

. S

' ! DEC l'l 1993 l Wisconsin Electric Power Company 2

response, you should document the specific actions taken and any additional ,

actions you plan to prevent recurrence. After reviewing your response to this Notice, including your proposed corrective e.ctions and the results of future -inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulator,v requirements. Areas examined during this inspection concern a subject matter which is exempt from disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21(c)(2). This information must be handled and protected in- accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure to this letter, our report of the inspection, and your response to the violation identified in the enclosure to this letter will not be placed in the NRC Public Document Room. Therefore, your statement of corrective action regarding the violation identified in the enclosure should be submitted as a separate enclosure to your transmittal letter in the manner prescribed. We will gladly discuss any questions you have concerning this inspection. Sincerely,

"0Sginal signed by Cynthia D. Pcdctson" Cynthia D. Pederson, Chief Reactor Support Programs Branch ' Enclosures: 1. Notice of Violation 2. Inspection Reports No. 50-266/93017(DRSS); No. 50-301/93017(DRSS) (SAFEGUARDS INFORMATION) See Attached Distribution - RIII RIII Rill / RII , sh son C "t=i" j Made jp Creed " r'" m uY3 W 12/A/93 TON 64tt Pl d deuAEDSIWU$$, 2p3 yI'[[[of[roned G { M100 D ce j w u t t .W i'4'N " ' ' ' " ' ' L >

. ,. - . f . i '. Wisconsin Electric Power Company 3- DEC 171993

Distribution l 1 cc w/ enclosures: G. J. Maxfield, P1 ant Manager NRR/DRIS/RSGB9D NMSS/HIGDON/4E4 , OE Director

cc w/ enclosures, w/o SAFEGUARDS INFORMATION: OC/LFDCB Resident Inspector, RIII , - Virgil Kanable, Chief , Boiler Section Cheryl L. Parrino, Chairman, ' Wisconsin Public Service , Commission

State Liaison Officer -, bcc w/ enclosures, w/o SAFEGUARDS INFORMATION: PUBLIC - i i ! . t i i ! , i

r EacIccuro Containa O!JEUARDS INFORMATION Upzi Soparation This Puge In Decontrolled ,. sW" i u e }}