Staff Requirements Memo Re 891003 Briefing on Study of Adequacy of Regulatory Oversight of Matls Under General License
ML20059B750
Person / Time
Issue date: 08/13/1990
From: Chilk S
NRC OFFICE OF THE SECRETARY (SECY)
To: Taylor J
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
References
FRN-56FR23360, FRN-56FR67011, FRN-57FR56287, REF-10CFR9.7 56R23360, AA38-2, AA38-2-1123, AD34-1, AD34-1-055, AD34-1-55, AD82-1-035, AD82-1-35, NUDOCS 9008300067
Download: ML20059B750 (3)


Text

_,

t i

[/

UNITED STATES N

1 N UC L E AR R EG U LATO R Y COMM(S,S(0,N,,,,,,,,,,,,,,,,

g.

,3 W ASHINGT ON. D.C. 20666 k

,cf g

August 13. 1990 g/;Weo O

OFFICE OF THE Mk#

lhb SECRETARY 9

e 9999999999999990ee9999ee

]

MEMORANDUM FOR:

James M. Taylor Executive Director for O a ions

)

FROM:

Samuel J.

Chilk, Secretal i

SUE 7ECT:

SECY-90-175 - STAFF REQU M NTS - OCTOBER 3,-

1 1989, FOLLOWING A BRIEFI O

STUDY OF 1

ADEQUACY OF REGTILATORY OVERSIGHT OF MATERIALS

)

UNDER A GENERAL LICENSE 1

This is to advise you that the Commission (with all Commissioners agreeing) has concurred in the staff's recommendations.

The staff should proceed with the rulemaking to modify the general j

license in 10 CFR 31.5 and to establish a registration and response system for general licensees through the proposed rulemaxing.

The periodic verification letters provided for in the rule should be accompanied by a copy of the regulations from time to tine.

These actions should promote better tracking, improved communications, and enhanced licensee understanding of J

the requirements and compliance with them.

Staff should prepare o

and submit a proposed rule for Commission review.

(EDO)

(SECY Suspense:

9/1/90)

The staff should also proceed with a rulemaking to modify 10 CFR 32.51 to restrict the maximum air gap between the device and the product for generally licensed devices.

A proposed rule should be prepared and submitted for Commission review.

(EDO)

(SECY Suspense:

3/29/91)

As a separate but related matter, staff should proceed with intentions to establish thror1h rulemaking separate exemptions i

for certain devices.

Staff should ensure that proposed exemptions of certain devices that are currently used under general and specific licenses are analyzed and exempted in-accordance with the Below Regulatory Concern policy.

The staff should integrate its proposal to conside) exempting these devices into the BRC implementation program.

(EDO)

(SECY Suspense:

9/14/90)

SECY NOTE:

THIS SRM, THE SURIECT SECY PAPER, AND THE VOTE SHEETS OF COMMISSIONERS ROGERS, CURTISS, AND REMICK WILL BE MADE PUBLICLY AVAILABLE IN 10' WORKING DAYS FROM THE DATE OF THIS SRM.

9008300007N00913 PDR 10CFR Q

dgb

O 2

The staff should conduct reviews and analyses, as described below, and report findings to the Commission.

1.

Given the staff's belief that losses of generally licensed devices are underreported, it is likely that some kinds of accidents and misuses might also be underreported.

The staff's recommendation for periodic verification letters itself indicates a concern that some general licensees might not know what probleus they are required to report, or even that they are required to report.

The staff should present the information obtained through these periodic surveys to the Commission, with an evaluation of the need for further regulatory action.

This evaluation should consider the need to require a specific license for additional types of devices or applications, to provide additional guidance to general licensees, for changes in the verification letters, and for other changes to Part 31, such as a requirement for additional training.

2.

The April 1987 report by Oak Ridge Associated Universities entitled " Improper Transfer / Disposal Scenarios for Generally Licensed Devices"' suggests a potential for significant doses from several types of devices.

Although the staff has informally determined that this document is based on unrealistic assumptions that produce _ dose estimates that are too conservative, the staff currently has no documented d

analysis supporting its conclusions, The staff should explain why the doses estimated in the Oak Ridge report are unlikely to be experienced in practice or 4

otherwise insufficient as a basis for rulemaking.

To support its conclusions, the staff should obtain a peer i

review of the Oak Ridge report and analyze the potential doses associated with radioactive materials under a general license.

Staff should use its analysis as a major part of the basis for making future improvements in regulatory oversight of general licenses and for making decisions on whether to recommend specific licensing for other generally-licensed devices.

The staff's analysis could also provide a basis for gathering additional information on categories of general licensees where survey responses are sparse.

This analysis should be independent of the proposed rule on the registration and response system, however, so that the rulemaking will not be delayed.

l l

...,,,.--2

_m

~.

1 3

3.

The staff should assess the design dose criteria established for generally licensed devices in 10 CFR Part 32 to ensure that members of the public are adequately protected.

In the recent Commission deliberations on final revisions to 10 CFR Part 20, Commissioner Curtiss raised a concern about adoption of 10% of the occupational limit (i.e. 500 mrem /yr) as the design criterion for generally licensed devices in 10 CFR 32.51(a) (2) (ii) and 32.51(c)..'Rather than delay promulgation of the sjnal revisions to 10 CFR Part 20 and the conforming changes, this issue should be resolved as part of an'integcated program to improve regulatory.

oversight of generally licensed material and devices.

Staff should carefully consi6er what the design criteria should be, given that the people receiving the exposures are-members of the general public rather than radiation workers, and should provide recormenda' 'ons for the Commission's consideration on whether revis.an of the design criteria should be initiated.

The staff should submit a plan with milestones for the accomplishment of these reviews and analyses.

(EDO)

(SECY Suspense:

2/1/91) cc: