GENucle:r En:rgy Generalliectuc Company 175 Curtner Avenue Sun Jose. CA 95125 l
l October 25,1993 Docket No.52-001
{
i I
i i
I i
i i
l l
l Chet Posiusny, Senior Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors
'I l
and License Renewal l
Office of the Nuclear Reactor Regulation
Subject:
Submittal Supporting Accelerated ABWR Schedule - LCO 3.8.1,3.8.4 and 3.8.7
Dear Chet:
Enclosed find LCOs 3.8.1,3.8.4 and 3.8.7, and their associated bases, incorporating agreements recently reached between NRC staff and GE.
In LCO 3.8.7, we have combined Conditions A and B from the P&R version dated August j
31,1993, into one condition. The inverters, which support the vital AC buses, serve the same loads (RPS/MSIV controllogic, NMS, and the PRRM) that are controlled by technical specifications. Divisions I and 11 power the scram and MSIV pilot solenoids but these are fail-safe loads (i.e., loss of either division of vital AC will not result in reactor scram nor isolation).
Please provide markup comments, if any, as soon as possible. Also, please provide copies of this transmittal to Mark Reinhart and Jim Lazevnick.
Sincerely,
" / foy Jack Fox Advanced Reactor Programs cc:
Alan Beard (GE) l Norman Fletcher (DOLL CalTang (GE290009 gdyI an2e I
9310290032 931025 P'
PDR ADOCK 05200001 A
PDR g