ML20059B573
| ML20059B573 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 09/29/1993 |
| From: | Michael Scott NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Glover C TET, INC. |
| References | |
| CON-NRC-03-90-028, CON-NRC-3-90-28 NUDOCS 9310290010 | |
| Download: ML20059B573 (3) | |
Text
_ _ - _ - _ - _ _ _ _ _ - - - - - - - - - - _ _ _ - - _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ - - _ - _ _ _ - _ _ - _ - _ _ _
PDR i
,r %
g S
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. l4&E> ores SEP 2 g 1993 TET, 7,nc.
ATTN: fis. Connie Glover Office Manager P. O. Drawr 91537 ftbile, Alabama 36691
~
Dear Ms. Glowr:
Subject:
Task Ordc:r 27, Mad.1 "testri.ctive Examination su;: pert at Maine Yankee Atomic Power Cerp.," thdor Centract Ns. t@C-03-90-028 This letter ccnfiras verbal authorization provided to TET, Inc. on N;r.tst 27, 1993 to add Tack 4 and extend the period of performance under the umject task order.
This effort shall bo, perfomed in accordance with the enc 10 God tbdification 1 to the Statement of Work. The increase to the task order ceiling is based en actual ecst incurred for this task order. In accordance with Section G.5, " Tar.k Order Precedures," of the subject contract, this letter definitized Task Clrde,r 27, ttd. 1.
The period of performanco for this task order is revised to August 6, 1993 threugh Septerrbor 10,.1993. The cost ceiling of this codification is si,175.08.
Therefore, the total ceiling in being ravised from 523,142,50 by s1,175.08 to l
24,942.88.
The sacunt of $23,227.66 rupresents the costs and the amcunt of
$1,090.00 represents the fixed fee.
(ccountird data for Task Order 27, Mcd.1 is as follo.m:
BER fb.
3201914040 JOB tb.:
L14743 4
APPNt%.
31XO200.320 RFPA tb.t 20 93185A 00LIGATICN:
$1,175.08 I
(Total cbligation under this task order is $24,317.6G)
Th'e-issuance of this codification dcas not amend any other teres er conditions of the stbject contract.
1 i
9310290010 930929 I
i PDR CONTR i
.t NRC-03-90-Ogg pyg
- Na, ]j..
/
_opepoe93 10:56
'ly205 666 1439 T E T.Inc.
Page 1 of 2 Task Orckr 27, ftd. 1 Acceptance of this task order mcdification should be made by executing three copics of this docunent in the rpace provided and returning t w copics to tne Centract Administrator.
You should retain tha third ccpy for your records.
Should you haws ony questicos regarding this < natter, please contact Sharlene itOubbin, Contract Administrator, on O3D 492-7764.
Gince*ely, Mary Lynn Scott, Contracting Officer' Contract fdninistration Branch No.1 Division of Contracts and Prcperty N nagement Of rice of Administration Encice.ure As stated (Lu_r'4 w:
Task Ord 27, Pod. 1 OV3 OV_DA e
D1 a s CY\\GADMA mts LU -
6 Q\\36\\Q%
t d
9 I
l j
.* ~ 'o9.;s0 93 20:so m os oco 1438 r r T.inc.
eco4 g
1 ModificationNo.ItoTaskOrderNb.27 9
Under JCN L-1474, Contract No. NRC 03-90-028
Title:
Indbpendent Nondestructive Evaluations at Maine Yankee Atomic Power WORK REOUIRENERTS AND SCHEtXIIE 1
AQD.: Tas,k 4.-Travel to the site to participate in the inspection (task 2).
PERIOD OF PERFORK6NCE EXTEND: The period of perfor::ance from August 20, 1993 to Septerrber 10, 1993.
MEETINGS AND TRAVEL g!D.: One one-person, five-<!ay trip to Haine Yankce.
t I
9 i
f a
1 e
9 G
9 4
4 4
6
i
.l!
i
~
r e
s r
3 a
3 EG A
P w,
4,
'3
.w w
m D3 E9 T/
U0 C3 m
E/
e 3 X9 n
9 E0 9
w 1
,0 10 T
P AS U A S E
E EE K DR N RA A A
Y WS AD E REN SALI TWTA NAIM E T MW -
EE RN 7
U 2
C O
R R
E P
B M
U N
R E
D R
O K
S A
T R
E B
M U1 N0 D
O M
R E7 S2 aO N0 nCCC LU U-N8 2
T0 C-3 A0 9 R9
/
T-2 N3 1
O0
/ C 0
1 lltl lI
,I' l4l!!!!;
,