ML20059B570

From kanterella
Jump to navigation Jump to search
Informs of Developments Re MOU & Clean Air Act Standards for Radon Releases from Uranium Mill Tailings
ML20059B570
Person / Time
Issue date: 10/18/1993
From: Bernero R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Oge M
ENVIRONMENTAL PROTECTION AGENCY
References
REF-WM-3 NUDOCS 9310290009
Download: ML20059B570 (5)


Text

_-

]

s,,"t o w#'o,t'

/

UNITED STATES NUCLEAR REGULATORY COMMISSION g

g WASHINGTON, D. C. 20555

\\,...../

OCT 181993 Ms. Margo T. ige, Director Office of Raolation and Indoor Air U.S. Environmental Protection Agency 401 M Street Washington, DC 20460

Dear Ms. Oge:

I am writing to inform you of developments related to the Memorandum of Understanding (M0U) between the U.S. Environmental Protection Agency, the U.S. Nuclear Regulatory Commission, and the States of Colorado, Texas, and Washington, concerning Clean Air Act standards for radon releases from uranium mill tailings (40 CFR Part 61, Subparts T ard W). The M00 requires that NRC and the States complete the review and approval of detailed reclamation plans and schedules for closure of non-operational tailings impoundments by September 1993.

By September 30, 1993, NRC and the States had approved all reclamation plans and amended all licenses for closure of licensed non-operational impoundments, with the exception of the Atlas mill site at Moab, Utah. This status was previously communicated in a letter from Michael Weber to Gail Bonano dated September 17, 1993.

For the Atlas site, NRC received extensive comments on the proposed reclamation plan approval, on the Environmental Assessment, and on the Finding of No Significant Impact published in the Federal Reaister on July 7.4; 1993. The actions necessary to be responsive to these comments made it impossible to meet the MOV imposed schedule.

NRC plans to complete a reassessment of the reclamation plan for the site and prepare a report with recommendations for future actions in November 1993.

Input will be obtained from Federal, State, and local representatives in this f

reassessment.

We are actively pursuing a timely final decision on the Atlas l

site location and reclamation plan and will keep you informed of our progress.

As the Atlas tailings impoundment dries sufficiently to allow access of equipment, an interim cover is being placed over the impoundment for radon emission control.

l Taking the extra time for further review of the proposed Atlas mill site reclamation plan by NRC will result in a final solution that is more responsive to public comment and will better protect the health and safety of the public.

R$ n \\

>@ l dl', []

9310296009 31018 71 PDR WASTE S

WM-3 PDR a

ddf:4%V

Ms. Margo T. Oge 2

If you have any questions, please contact me at (301) 504-3352, or have your staff contact Allan Mullins at (301) 504-2578.

Sincerely, OTI !nd$1gncdtyp G

flDbMt M. Bo nom Robert M. Bernero, Director Office of Nuclear Material Safety and Safeguards cc:

D. Lacker, Texas W. Sinclair, Utah T. R. Strong, Washington R. Quillin, Colorado A. Thompson, Perkins Cole F. Craft, Homestake J. Gilchrist, AMC C. Shaver, EDF J. Renton, Esq.- EPA flafkTSniQlj 86xe'sfif C6ncurrence? Bl'6ck :TidlD'efinbjDiitfibutibnICopQrsfirpncli.

In small Box on "0FC:" line enter: C = Cover E = Cover & Enclosure N = No Copy 0FC LLUR*

LLUR*

LLDR*

LLDR*

RIV*

NAME AMullins/eb MFliegel MWeber JAustin LJCallan DATE 9/21/93 9/24/93 9/ /93 9/24/93 9/24/93 0FC OGC*

LLWM*

LLWM*

NMSS*

NMSS,[h[

NAME RFonner PLohaus JGreeves GArlotto RBerbo DATE 9/24/93 9/29/93 9/29/93 10/04/93 10/[/93 S:\\LLWMTYPE\\EDIE\\CAA-EPA.ATM 0FFICIAL RECORD COPY In small Box on "DATE:" line enter: M = E-Mail Distribution Copy H = Hard copy PDR : YES x

NO Category:

Proprietary or CF Only ACNW: YES NO x

Delete file after distribution Yes No IG: YES N0 x

DISTRIBUTION: Ce'ntral File' LLWM r/f MBell JSurmeier NMSS r/f DGillen RHall,URF0 NMSS Dir rf JHolonich a

t-9 Ms. Margo T. Oge 2

If you have any questions, please contact.me at (301) 504-3352, or have your staff. contact Allan Hullins at (301) 504-2578.

Sincerely, Robert H. Bernero, Director Office of Nuclear Material Safety and Safeguards cc:

D. Lacker, Texas W. Sinclair, Utah T.R. Strong, Washington

  • SEE PREVIOUS CONCURRENCE OFC LLUR*

C LLUR*

C LLDR*

C RIV*

C OGC*

NAME AMullins/eb MFliegel JAustin LJCallan RFonner DATE 9/21/93 H

9/24/93 H

9/24/93 9/24/93 H

9/_27/93 LLh NMfS s, 0FC L

NMSS f

NAME PLokab JGr3e'veb GAhl[tho RBernero i

i DATE 9/LS/93 9/2\\ /93

'h 9/ /93 S:\\LLWMTYPE\\EDIE\\CAA-EPA.ATM

/o ry0FFICIAL RECORD COPY In small Box on "DATE:" line enter: M=

air Distribution Copy H = Hard Copy PDR : YES x

NO Category:

Proprietary or CF Only ACNW: YES NO

_1_

Delete file after distribution,Yes X No IG: YES N0 x

DISTRIBUTION: Central File LLWM r/f MBell JSurmeier NMSS r/f DGillen-RHall,URF0

/

t >-

,/

i+ms b

Ms. Margo T. Oge 2

If you have any questions, please contact me at (301) 504-3352, or have your staff contact Allan Mullins at (301) 504-2578.

Sincerely, Robert M. Bernero, Director Office of Nuclear Material Safety and Safeguards cc:

D. Lacker, Texas W. Sinclair, Utah T.R. Strong, Washington MaFE Sniill[Boxss [i.n ^C6ncWrence l Bl oc kitMDe{i..he! Distfitsst'idn30pilPfe feren'ce.

C = Cover E = Cover & Enclosure N h No Copy In small Box on "0FC:" line enter:

_Nh 0FC ULbkI O

LLO$f$ ('

Ld d.-

RIV C-r NAME AMuI1$s/eb MFliegel JAhin LkaIlY "Y

DATE 9/J#/93 H

9/9793

/-/

9/tj/93 9////93

/#

9/77/93 0FC LLWM LLWM NMSS NMSS NAME PLohaus JGreeves GArlotto RBernero DATE 9/ /93 9/ /93 9/ /93 9/ /93 S:\\LLWMTYPE\\EDIE\\CAA-EPA.ATM OFFICIAL RECORD COPY In small Box on "DATE:" line enter: M = E-Mail Distribution Copy H = Hard Copy PDR : YES Y NO Category:

Proprietary or CF Only ACNW: YES NO

/

Delete file after distribution Yes Z No IG: YES NO s

DISTRIBUTION: Central File LLWM r/f MBell JSurmeier NMS$ r/f DGillen RHall,URF0

C From:

Leonard J.

Callan (LJC1)

To:

AR1:WN4:PH4:WN1:WN7:EAB Date:

Tuesday, September 28, 1993 3:59 pm l

Subject:

BELOW FILE -Reply you have my concurrence i

l

" ' '