DEC 211993
Docket Nos. 50-321 and 50-366
'
!
Georgia Power Company.
ATTN: Mr. J. T. Beckham, Jr.
Vice President. Plant Hatch
Nuclear Operations
t
P.O. Box 1295
Birmingham, AL 35201
Gentlemen:
,
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/93-26 AND 50-366/93-26
i
This refers to the inspection conducted by L. Wert of this office on
October 31 - November 27, 1993. The inspection included a review of
,
activities authorized for your Hatch facility. At the conclusion of the
i
inspection, the findings were discussed with those members of your staff
{
identified in the enclosed report.
'
Areas examined during the inspection are identified in_the report. Within
these areas, the inspection consisted of selective examinations of procedores
and representative records, interviews with personnel, and observation of
i
activities in progress,
i
Within the scope of the inspection, violations or deviations were not
identified. We would like to call your attention to the deficiencies
i
regarding the inability of the Plant Service Water System to automatically
isolate on some postulated turbine building service water line breaks. While
we recognize your efforts in identifying this-issue, we are concerned about
the inadequacy to communicate to the onsite organization the necessity for
'
procedural changes and training needed to address this problem.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
j
this letter and its enclosure will be placed in the NRC Public Document Room.
l
t
Should you have any questions concerning this letter, please contact us.
'
Sincerely,
ORIGINAL 90go gy
ALAN R. HIRDT
Alan R. Herdt, Chief
Reactor Projects Branch 3
9401040186 931221
ADOCK 05000321
Division of Reactor Proj,ects
G
pyg.
Enclosure:
NRC Inspection report
030015
iy
TEo/ j
_
a-.nc
t+
- -.
.a
s-
...wa
. -
.
--
.
.
-
,
,
I
i
DEC 211993
Georgia Power Company
2
,
cc w/ encl:
J. D. Woodard
Senior Vice President
Georgia Power Company
i
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
H. L. Sumner, Jr.
General Manager, Plant Hatch
Georgia Power Company
Route 1, Box 439
l
Baxley, GA 31513
S. J. Bethay
Manager Licensing - Hatch
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
Ernest L. Blake, Esq.
Shaw, Pittman, Potts and
Trowbridge
!
2300 N Street, NW
Washington, D. C.
20037
Charles H. Badger
Office of Planning and Budget
Room 610
270 Washington Street, SW
Atlanta, GA 30334
Harold Reheis, Director
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Thomas Hill, Manager
Radioactive Materials Program
Department of Natural Resources
,
4244 International Parkway
Suite 114
Atlanta, GA 30354
Chairman
'
Appling County Commissioners
County Courthouse
Baxley, GA 31513
cc w/ encl: Continued page 3
l . . -
_ - . . - _ . , ,
.
.
.
_ _.,_
. - .-
. ,
. .
. . - - -
. .
--
. _ .
. . - -
.-
_ _
__. _ . _ _ .
_ - .
,
'
.
'
'
&
..
!
.
DEC 211993
Georgia Power Company
3
cc w/ encl:
Continued
Dan H. Smith
,
!
Vice President
Power Supply Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
'
12th Floor
'
1050 Connecticut Avenue, NW
Washington, D. C.
20036
,
,
bec w/ encl:
K. N. Jabbour, NRR
A. R. Herdt, RII
.
P. H. Skinner, RII
Document Control Desk
NRC Senior Resident Inspector
U.S. Nuclear Regulatory Commission
Route 1, Box 725
Baxley, GA 31513
FILE: G:\\DRP\\HT326RPT.DAS
,RJ I RP
RII:Dk
b
D
ur
PSki n r
12/l'//93
12/fo/93
,
=-
,
. - - - .-
,m
v
~
.,,,w
,
..
-