ML20059B322

From kanterella
Jump to navigation Jump to search
Forwards NRC Observations of INPO Evaluation Process at Clinton.Observations Developed as Part of NRC Program to Determine Need for Maint Rule.C Holden Will Be Observing INPO Evaluating Process at Hope Creek on 900813-24
ML20059B322
Person / Time
Site: Point Beach, Hope Creek, Clinton  NextEra Energy icon.png
Issue date: 08/06/1990
From: Russell W
Office of Nuclear Reactor Regulation
To: Kindley W
INSTITUTE OF NUCLEAR POWER OPERATIONS
Shared Package
ML20059B325 List:
References
NUDOCS 9008290010
Download: ML20059B322 (2)


Text

-

1,<..,

' August 6,1990 -

. Institute of Nuclear. Power Operations ATTH: William R. Kincley, Vice President

'Covernment Relations Suite 1500 1100 Circle 75 Parkway i

Atlanta, GA 30339

-l

Dear Mr. Kincley:

This letter forwards NRC observotions of the INP0 evaluation process at Clinton Nucledr Power Plant. The observations were developed as part of= an NRC program to determine the need for a maintenance rule.

The enclosed document will be placeo in the NRC Public Document Room in accordance with the INP0/NRC memorandum of agreement dated October 20, 1988.

Addition 611y; Mr. C. Holden will be observing your evaluation process at the Hope Creek Nuclear Power. Plant on August 13 through 24, 1990.

Dr. Thomas Murley, Director, Office of Nuclear Reactor Regulation, will be the NRC J

management representative observing the INPO process and will errive on Wednesday, August 22, 1990.

Mr.

T.

Polich will be observing the INPO.

evaluation process at the Point Beach Nuclear Power Plant on September 9 j

through 21, 1990. Mr. Stewart Ebneter, Regional Administrator, Region 11,.will be the NRC management representative at this evaluation.

Mr. Ebneter will-be commencing his observations on Wednesday, September 19, 1990. Trip reports, including cur observations of the INPO evaluation process at these facilities, will also be forwarded to you as each evaluation is completed.

Sincerely, orignal siped tm William T. Russell, Associate Director for Inspection and Technical Assessment-Office of Nuclear Reactor Rec' h tion

Enclosure:

As Stated

)

cc:

T. Murley S. Ebneter C.-Holden T. Polich DISTRIBUTION:

J

" Central: nJej"#

JWRoe ATGody TFoley JDyer PDR POEB'Reiding C0 Thomas GGrant WRussell BGrimes

~

Document Name:

INP0 LETTER

  • SEE PREVIOUS CONCURRENCE SHEET IFC
PQEB:DLPQ:NRR
POEBIDLPQ:NRR :PQEBI U QIRRR :DD:DEPQiNRR
DIRIDLPQ:hRR :XDT:NRR

+

+

NAME :*TFoley/djh

  • GGrant
  • ATGody
  • C0 Thomas
  • JWRoe
WRussell DATE :07/26/90
07/31/90
08/02/90
08/01/90
08/03/90
08/ /90 OFFICIAL ~ RECORD COPY

~

'h Mut ME CENTER COMk @1])jzo

/

,00e2,0010 eooeos ADOCKOSoogP6 DR 4

Il$NENVIENDITKEELOSURE5E7

. [- q* h o y'o,..

. NUCLE AR REGULATORY COMMISSION u

UNITED STATES

,A

.8

' e;(

L.O.k WASHINGTON. D. C. 20555 ~

'h h.....

August 6, 1990 Institute of. Nuclear Power Operations AT1N:. William-R. Kindley, Vice President Government Relations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339

Dear Mr. Kindley:

This. letter forwards NRC observations of the INPO evaluation process at Clinton Nuclear Power Plant. The observations were developed as part of an NRC program to determine the-need for a maintenance rule.

The enclosed document will be placed-in the NRC Public Document Ruom in accordance with the INP0/NRC memurandum of agreement dated October 20, 1988.

Accitionally, _ Mr. C. Holden will be observing your evaluation process at the Hope Creek Nuclear Power Plant on August 13 through 24, 1990.. Dr. Thomas Murley, Director, Office of. Nuclear Reactor Regulation, will be the NRC management representative observing the INPO process and will arrive on Wednesday, August 22, 1990.

Mr.

T.

Polich will be observing the INP0 evaluation process at the Point Beach Nuclear. Power Plant on September 9 through 21, 1990. Mr. Stewart Ebneter, Regional Adniinistrator, Region 11, will be :the NRC management representative at this evaluation.

Mr. Ebneter will-be commencing-his observations on Wednesday, September 19, 1990. Trip reports, including our cbservations of the 1NPO evaluation process at these fecilities, will also be fcrwarded to you as each evaluation is completed.

Sincerely, h0 William T. Russell, Associate Director for inspection and Technical Assessment Office of Nuclear Reactor Regulation

Enclosure:

As Stated cc:

T. Murley S. Ebneter C. Holden T. Polich

.e I

ll lll l