Text
-.-
P r
7590-01 l
ENITED STATES NUCLEAR REGULATORY COMM!!SION GULF STATES UTILITIES COMPANY DOCKET NO 50-458 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT l
The U.S. Nuclear Regulatory Commission (the Commission) is considering issuance of an exemption to Facility Operating License No. NPF-47, issued to
)
Gulf States Lt.ilities Company (GSU), for operation of the River Bend Station, l
Unit 1 located in West Feliciana Parish, Louisiana.
j ENVIRONMENTAL ASSESSMENT Identification of Proposed Action The proposed exemption would extend the schedule for performing certain Type C local leak rate tests required by 10 CFR Part 50, Appendix J, Section III.D 3, to be completed within a two-year time interval.
l The Need for the Proposed Action The exemption is requested on a one-time only basis to support the current refueling outage schedule. Requiring a plant shutdown solely to perform surveillance tests would cause an unnecessary thermal transient on the plant and could result in unnecessary exposure to personnel.
Environmental Impacts of the Proposed Action The Commission has completed its evaluation of the proposed exemption.
The proposed exemption would allow GSU to conduct the local leak rate tests during the next refueling outage, an extension of 29 days. There will be no changes to the facility or the environment as a result of the exemption.
l t
6 i
9401030128 931222 PDR-ADDCK 05000458.
P PDRL b
,y.,
..,-,c e
r
, Alternative to the Proposed Action It has been determined that there is no impact associated with the proposed exemption; any alternatives to the exemption will have either no environmental impact or wii) have a greater environmental impact.
Alternative Use of Resources This action does not involve the use of any resources not previously considered in the Final Environmental Statement for River Bend Station, Unit I dated January 1985.
Aaencies and Persons Consulted The NRC staff reviewed GSU's request and consulted with the Louisiana State official. The State official had no comments regarding the NRC's
. proposed action.
FINDING OF NO SIGNIFICANT IMPACT Based on the foregoing environmental assessment, the Commission has concluded that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the Commission has determined not to prepare an environmental impact statement for the proposed exemption.
For further details with respect to this action, see the exemption request dated November 18, 1993, which is available for public inspection at the Commission's Public Document Room, The Gelman Building, Lower Level, 2120 L Street, N.W., Washington, D.C.
20555, and at the local public document
room, located at the Government Documents Department, Louisiana State University, Baton Rouge, Louisiana 70803.
Dated at Rockville, Maryland, this 22nd day of December 1993.
l FOR THE NUCLEAR REGULATORY COMMISSION 4 10--
Li Suzanne C. Black, Director
~
Project Directorate IV-2 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation i