ML20059A643

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-282/93-16 & 50-306/93-16 by Forwarding EPIP F3-2 Specifying Action Levels Indicating Emergency Conditions Exist
ML20059A643
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 10/20/1993
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20059A266 List:
References
NUDOCS 9310270022
Download: ML20059A643 (1)


Text

_

g

.o-Northern States Power Company Prairie Island Nuclear Generating Plant 1717 Wakonade Dr. East Welch. Minnesota 55089 October 20, 1993 U S Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Response to NRC Inspection Report Nos. 282/93016(DRSS and 306/93016(DRSS)

Routine Emerrency Preparedness Exercise Your letter of September 20, 1993, which transmitted Inspection Report Nos.

282/93016(DRSS) and 306/93016(DRSS), requested a copy of our revised Emergency Plan Implementing Procedure EPIP F3-2.

Attached to this letter is the revised procedure.

The change which is pertinent to the Inspection Report discussion is located on Page 5 of the procedure.

In this letter, we have made no new NRC conunitments.

Please contact Jack Leveille (612-388-1121, Ext 4662) if you have any questions related to our response to the subject inspection report.

Roger O Anderson Director Licensing and Management Issues c: Regional Administrator III, NRC Senior Resident Inspector, imC NRR Project Manager, NRC Kris Sanda, State of Minnesota

Attachment:

Emergency Plan Implementing Procedure EPIP F3-2, Revision 18 250110 gg

)