ML20059A627
| ML20059A627 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/23/1985 |
| From: | Mcdonald R ALABAMA POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 9008230142 | |
| Download: ML20059A627 (1) | |
Text
.
-[
x
, WallinC Addr:ss
)
.A Akham2 Power,1 iy
=
600 North 18th Sk M[
Po,t Othee Box ?641 j
Bammgham, AL t ama 3L291 j
telephone PD5 783 f 090 q
R. P. Mc Donald i
Senior Vice President j
Flmiddge Building Ala X1ma power a: :v..
r,,
Docket No.
k l
l August 23, 1985 t
Dr. J. W. Grace, Regional Administrator U. S. Nuclear Regulatory Commission f
Region.II, Suite 3100 101 Marietta Street, N. W.
i Atlanta, Georgia 30303 i
Joseph M. Parley Nuclear Plant <- Unit 1 i
Interval 1 Period 3 Outage.1 4asarvtas4Laspeetten Beges27 2 Gentlemen
(
The Joseph M. Farley Nuclear Plant Unit-1 Interval 1 Period 3 Outage 1 Inservice inspection Report is herewith submitted for yNr review. This report' describes and summarizes the inservice-inspection activities J
performed during the Unit 1 sixth refueling outage. These activities were i
completed on May 25, 1985.
I Information contained in this report is being submitted pursuant to Article IWA-6220 of Section XI of the 1974 Edition through the-Summer 1975' i
Addenda of the ASME Boiler and Pressure Vessel Code. Other pertinent report information, as required by IWA-6210, including, as applicable, examination plans and schedules, examination results and reports, i
examination methods and procedures, evaluation of results, and corrective actions and repairs, is available at Farley Nuclear Plant for r review.
t Yours truly, j
(.
t f ' '(.
//
N R. P. Mcdonald RPM / STB drs/D-361 Enclosure cc Mr. L. B. Long t
Mr. S. A. Varga t
9008230142hhhhh Mr.-E. A. Reeves
((DR ADOCK Mr. W. H. Bradford 4g PDC i
85 - u/
h6
//r i