ML20059A606
| ML20059A606 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 10/21/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9310270003 | |
| Download: ML20059A606 (3) | |
Text
UNITED STATES ga CfC
,(
Og$
n!UCLEAR REGULATORY COMMISSION g
j REGION IV E
G11 RYAN PLAZA DRIVE, SulTE 400 o,
8 ARLINGTON, TEXAS 760118064 OCT 211993 REVISED 10/21 REVISED REVISED NOTICE OF SIGNIFICANT LICENSEE MEETING Name of License 9:
Houston Lighting & Power Company Name of Facility:
South Texas Project Electric Generating Station, Units 1 and 2 Docket No.:
50-498; 50-499 Date and Time October 29, 1993 of Meeting:
9 a.m. (CDT)
Location of Meeting:
South Texas Project Nuclear Support Center (southwest of Bay City, Texas)
Purpose of Maeting:
Discuss licensee progress and schedules for addressing current issues: discuss South Texas Project Business Plan NRC Attendees:
J. Milhoan, Regional Administrator S. Black, Project Director, PDIV-2, Office of Nuclear Reactor Regulation (NRR)
S. Collins, Director, Division of Reactor Safety A. Howell, Acting Deputy Director, Division of Reactor Projects (DRP)
W. Johnson, Chief, Project Section A, DRP D. Loveless, Senior Resident Inspector, DRP L. Kokajko, Senior Project Manager, NRR C. Hackney, Regional State Liaison Officer J. Gilliland, Public Affairs Officer T. McKernon, Reactor Inspector J. Jacobson, Senior Operations Engineer, Special Inspection Branch, NRR E. Imbro, Chief, Special Inspection Branch, NRR P. Koltay, Section Chief, Special Inspection Branch, NRR Licensee Attendees:
W. Cottle, Group Vice President, Nuclear J. Groth, Vice President, Nuclear Generation T. Cloninger, Vice President, Nuclear Engineering T. Jordan, General Manager, Nuclear Engineering J. Sheppard, General Manager, Nuclear Licensing L. Myers, Plant Manager, Unit 1 G. Parkey, Plant Manager, Unit 2 S. Head, Deputy General Manager, Nuclear Licensing 93102 _7000 _3 9710g2 p(y\\
9e P
ppg
I Houston Lighting & Power Company NOTE:
(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made known by COB on October 26 via telephone call to Mark Satorius (817/860-8141).
(2) This meeting is open to attendance by members of the general public.
(3) This meeting notice was revised to include discussion of the STP Business Pl an. This was necessary because of the cancellation of the meeting scheduled for October 20, 1993, in Arlington, Texas.
Iv Approved By:
m ATBill Beaph, UTrec' tor ' 'g Division ofGeactor Projects i
l I
i
]
Houston Lighting & Power Company OCT 21 1993 Distribution:
DMB (IE 45)
J. H. Sniezek, DEDR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21)
T. E. Murley, D/NRR (MS 1201)
W. T. Russell, ADT/NRR (MS 12G18)
J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, 0GC (MS 15B18)
OEDO RIV Coordinator (MS 17G21)
J. M. Montgomery, DRA NRC Attendees (E-mail only)
RA Secretary Carol Gordon Division Secretary (DRP, DRS)
L. S. Ousley RIV File
/
e RIV:C: RP/A PA0 L
D:DRP(N WDJohnson;df JTG1 liland CAHackney ABBeach,p 10/p/93 10/p/93 10f}0/93 10/ \\/9h 7
2600n:/
.