Text
-
-t
-e$
.+
A
- Tonnessee VaEy Aeong Pcst Omce b 2000. Seady Darsf. Tennessee 37379-2000 i
Robed A Fenech Vk,e Pf esnfmt. Legary/ah 4xWar Punt December 20, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 j
Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - OPERATIONS ON-SHIFT SIAFFING
Reference:
TVA letter to NRC dated April 21, 1993, " Reply to Notice of Violation (NOV.) and Proposed Imposition of Civil Penalties -
NRC Inspection Report Nos. 50-327, 328/92-36, 92-38, and 93 Enforcement Action 92-257 and 93-034"
.f In the referenced letter, TVA indicated that-the minimum Operations staffing level would consist of one-shift' operations supervisor (SOS)/ senior reactor operator (SRO), four assistant shift operations' supervisors (ASOSs), four unit operators (UOs)/ reactor operators (R0s),
and nine assistant unit operators (AUOs). HThis staffing level was-intended to apply-for two-unit power operation. TVA has' reviewed this-staffing policy with one unit shut down, and intends to reduce the number of on-shift ASOSs to three when'one or both units are in Modes 4, 5,-
or 6.
The remainder of the staffing plan remains unchanged as shown in the enclosure.
Four ASOSs will be staffed when both units are in Modes 1, 2, or 3.'
It_
d is our position that sufficient oversight and support is available with
'l three ASOSs when one or both' units are in a shutdown condition. As four-1 UO/R0s will be staffed in all combinations of unit status, sufficient personnel are available to prevent an individual operator from becoming
~
"ove r-b urden ed. "
Yourl prompt review on this matter is appreciated.
~
2so002 9312300127 931220L F
il I PDR.. ADOCK 0:M)OO327 - p.
I l
G PDR i
o 1
-. ~.
dk f
9 C.S. Nuclear Regulatory Commission Page'2 December 20, 1993 If you have any questions concerning this submittal, please telephone Russell R. Thompson at (615) 843-7470.
Sincerely, shh5l 4k b 37~fN Robert A. Fenech Enclosure cc (Enclosure):
Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint,-North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i
I t
-I l
.l 1
- e....
ENCLOSURE OPERATIONS ON-SHIFT STAFFING
-1 P.3 I
BOTH UNITS IN EITHER UNIT, OR BOTH, IN MODES 1,2, OR 3 MODES 4,5, OR 6 I SOS ISOS 4 ASOSs 3 ASOSs 4 UO/ROs 4 UO/ROs i