Responds to Notice of Violation & Proposed Imposition of Civil Penalty Noted in Insp Repts 50-327/92-36,50-328/92-36, 50-327/92-38,50-328/92-38,50-327/93-02 & 50-328/93-02
ML20059A360
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/20/1993
From: Fenech R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
EA-92-257, EA-93-034, EA-93-34, NUDOCS 9312300127
Download: ML20059A360 (3)


Text

-

-t

-e$

.+

A

- Tonnessee VaEy Aeong Pcst Omce b 2000. Seady Darsf. Tennessee 37379-2000 i

Robed A Fenech Vk,e Pf esnfmt. Legary/ah 4xWar Punt December 20, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 j

Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - OPERATIONS ON-SHIFT SIAFFING

Reference:

TVA letter to NRC dated April 21, 1993, " Reply to Notice of Violation (NOV.) and Proposed Imposition of Civil Penalties -

NRC Inspection Report Nos. 50-327, 328/92-36, 92-38, and 93 Enforcement Action 92-257 and 93-034"

.f In the referenced letter, TVA indicated that-the minimum Operations staffing level would consist of one-shift' operations supervisor (SOS)/ senior reactor operator (SRO), four assistant shift operations' supervisors (ASOSs), four unit operators (UOs)/ reactor operators (R0s),

and nine assistant unit operators (AUOs). HThis staffing level was-intended to apply-for two-unit power operation. TVA has' reviewed this-staffing policy with one unit shut down, and intends to reduce the number of on-shift ASOSs to three when'one or both units are in Modes 4, 5,-

or 6.

The remainder of the staffing plan remains unchanged as shown in the enclosure.

Four ASOSs will be staffed when both units are in Modes 1, 2, or 3.'

It_

d is our position that sufficient oversight and support is available with

'l three ASOSs when one or both' units are in a shutdown condition. As four-1 UO/R0s will be staffed in all combinations of unit status, sufficient personnel are available to prevent an individual operator from becoming

~

"ove r-b urden ed. "

Yourl prompt review on this matter is appreciated.

~

2so002 9312300127 931220L F

il I PDR.. ADOCK 0:M)OO327 - p.

I l

G PDR i

o 1

-. ~.

dk f

9 C.S. Nuclear Regulatory Commission Page'2 December 20, 1993 If you have any questions concerning this submittal, please telephone Russell R. Thompson at (615) 843-7470.

Sincerely, shh5l 4k b 37~fN Robert A. Fenech Enclosure cc (Enclosure):

Mr. D. E. LaBarge, Project Manager U.S. Nuclear Regulatory Commission One White Flint,-North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 i

I t

-I l

.l 1

e....

ENCLOSURE OPERATIONS ON-SHIFT STAFFING

-1 P.3 I

BOTH UNITS IN EITHER UNIT, OR BOTH, IN MODES 1,2, OR 3 MODES 4,5, OR 6 I SOS ISOS 4 ASOSs 3 ASOSs 4 UO/ROs 4 UO/ROs i

9 AUOs 9 AUOs l

P 0

.;