Forwards Insp Rept 50-346/93-23 on 931115-19.No Violations Noted
ML20059A307
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/22/1993
From: Gardner R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Storz L
CENTERIOR ENERGY
Shared Package
ML20059A310 List:
References
NUDOCS 9312300101
Download: ML20059A307 (2)


See also: IR 05000346/1993023

Text

'

.

  • ..,

j# %<4 UNITED STATES

.g g- NUCLEAR REGULATORY COMMISSION

'i E REGION W

-5 E 801 WARRENVILLE ROAD

\ . ,/ ' USLEJLUNOIS 60532-451

...o

DEC 21993

Docket No. 50-346

Centerior Energy

ATTN: Mr. L. F. Storz

Vice President-Nuclear

Davis-Besse

c/o Toledo Edison Company

300 Madison Avenue

Toledo, OH 43652-0001

Dear Mr. Storz:

This refers to the special safety inspection conducted by Mr. John H. Neisler

,

and others of this office on November 15-19, 1993. The inspection reviewed ,

the implementation of the Station Blackout (SB0) Rule, 10 CFR 50.63, at the

Davis-Besse Nuclear Power Station. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

r

The team considered the SB0 rule to be adequately implemented. The material

condition of the plant and the SB0 equipment was good. In addition, th'e

quality of the SB0 calculations and the abnormal and emergency operating

procedures for SB0 mitigation and recovery were good. .The team identified

some minor weaknesses in management control and design such as drawing

deficiencies, contractor control and questionable ground detection on the SB0

diesel generator DC system. Drawing deficiencies were also identified-during

a previous NRC inspection (reference NRC Inspection Report No. 50-346/93019).

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.. >

No violations of NRC requirements were identified-during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations,'a copy of

.

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room. ,

We' will . gladly discuss any questions you have concerning this inspection.

Sincerely,

980016

~

fmil d hb

R. N. Gardner, Chief

Plant Systems Section

Enclosure: Inspection Report ' '

No. 50-346/93023(DRS)

7

See Attached Distribution i

I'

9312300101 931222

DR ADDCK 0500 6 j

1

.,

ft

p

e ,

if

Centerior Energy 2

i ,1993 -

_

.

. LEC

Distribution

cc w/ enclosure:

J. K.. Wood, Plant Manager

W. T. O'Connor,' Manager,

Regulatory Affairs

D. C. Shelton', Senior Vice

President, Nuclear

OC/LFDCB

LPM, NRR

Resident Inspector, RIII

James R. Williams, State of Ohio

Robert E. Owen, Ohio  :

. Department of Health l

A. Grandjean, State of Ohio, '

Public Utilities Commission .j

-

R. Hasse, RIII

L

L

.

1

-.'

1

l

-l

I

!

l

l

r' l

i

_ _

U

_