ML20059A186

From kanterella
Jump to navigation Jump to search
Forwards Final SALP Repts 50-245/92-99,50-336/92-99 & 50-423/92-99 for Period 920216-930403 for Plant
ML20059A186
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 10/19/1993
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20059A188 List:
References
NUDOCS 9310260249
Download: ML20059A186 (3)


See also: IR 05000245/1992099

Text

a

'

(~~., -(.

-

N'4

.

Y

-

t

DCT 191993

Docket Nos. 50-245

50-336

50-423

Mr. John F. Opeka

Executive Vice President - Nuc1 car

Northeast Nuclear Energy Company

P.O. Box 270

Hartford, CT

06141-0270

Dear Mr. Opeka:

Subject:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)

FINAL REPORT NOS. 50-245/92-99,50-336/92-99 AND 50-423/92-99

This letter fervards the final Millstone Nuclear Power Station SALP Report (Enclosure 1)

for the period between February 16,1992, and April 3,1993, for Millstone Units 1,2 and

3. The initial SALP report was forwarded to you by our July 20,1993, letter (Enclosure 2)

and was discussed with you and other members of your company at a meeting on August 24,

1993, at your training center at the Millstone site.

We have reviewed your detailed written response dated September 10,1993 (Enclosure 3).

We will continue to closely monitor your efforts to improve corrective action effectiveness

and compliance with procedures as well as to correct the operator traming weaknesses

observed at Millstone Unit No.1. In addition, your recent performance problems at

Millstone Unit 2, which have been the subject of several discussions with the NRC and

resulted in an enforcement conference on October 1,1993, on the apparent violations related

to the repair of letdown isolation valve 2-CH-442, highlight the need for continued and

sustained performance enhancement at Millstone Station.

Based on your written comments, we determined that two clarifications and corrections to the

initial SALP report were warranted and these have been incorporated into the final report.

The first change involved a clarification on page 21, paragraph 4 in the emergency

preparedness section regarding the motives behind the recent substantial staff increases to

your emergency preparedness staff. We found that our previous discussion did not fully.

reflect your primary goal of enhancing on-site performance. The second change involved

correcting a typographical error on page 29, paragraph 3 as well as clarifying a subsequent

statement in that paragraph which could be misinterpreted. The final SALP report has been

revised to reflect these changes as indicated in Enclosure 4.

I

VO

G

I

'9310260249 931019

9FFICIAL RECORD COPY R:\\MILSTONE.SLP

PDR

ADOCK 05000245

0

^PDR

r.

.

October 19, 1993

.

Mr. John Opeka

2

No reply to this letter is required. Your cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

Thomas T. Martin

Regional Administrator

Enclosures:

1) Final SALP Report Nos. 50-245/92-99, 50-336/92-99 & 50-423/92-99

2) Letter from Thomas Martin to John Opeka, dated July 20,1993, Transmitting the

Initial SALP

3) Letter from John Opeka to Thomas Martin, dated September 10, 1993,

Transmitting NNECO's Comments on the SALP

4) SALP Board Report Revision Sheet

cc w/ encl:

W. D. Romberg, Vice President - Nuclear, Operations Services

S. E. Scace, Vice President, Millstone Station

J. P. Stetz, Vice President, Haddam Neck Plant

H. F. Haynes, Nuclear Unit Director

G. H. Bouard, Nuclear Unit Director

R. R. Dacimo, Nuclear Unit Director

R. M. Kacich, Director, Nuclear Licensing

J. Solymossy, Director, Nuclear Quality and Assessment Services

Gerald Garfield, Esquire

Nicholas Reynolds, Esquire

The Chairman

Commissioner Rogers

Commissioner Remick

Commissioner de Planque

K. Abraham, PAO (33)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

-NRC Resident Inspector

State of Connecticut SLO

OFFICIAL RECORD COPY R:\\MILSTONE.SLP

-

-

'

.

00f1 91o93

,

-

Mr. John Opeka

3

bec w/ encl:

Region I Docket Room (with concurrences)

,

bec w/enci (VIA F MAIL):

J. Stolz, NRR/PD I-4

V, McCree, OEDO

D. Jaffe, PM, NRR

J. Andersen, NRR

1

l

,

,1

j[ kP

A

1%

R

lLSS

RI:DRS

RI:DRP

RI:DRP

,

D

ein

Blough

Cooper

]Ju1

Hodges

,

C &,

MWh

10/f/93

10/f93

10/3/93

10/f/93

10/J/93

-

1

NRR:PDI-4

RI:RA

]

g q3gL'Y

'

Martin

'

Stolz.

t

10$)/9f

10// 93

OFFICIAL RECORD COPY R:\\MILSTONE.SLP

l