{{#Wiki_filter:.. -. - -.. -

  • CbN"SOI14149.

PHILADELPHIA ELECTRIC COMPANY PEACil BUTIDM AlDMIC POWER STATION R. D.1, Box 208 l Delta. Pennsylvania. 17314 reacu monon-nu romu or sxansNa pl7) 456-7014. D. B. Miller, Jr. ' j - Vice Presafent . August 15, 1990 Docket Nos. 50 277 50-278 I U.S. Nuclear Regulatory Commission .I Document Control Desk ' Washington, DC 20555 -

SUBJECT:

Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen: Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of July 1990 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4. Sincerely, / d 2 j BW W Y f%r0 4 DBM/AAF/JBC/DRM/MJB: cmc Enclosure ec: R.A. Burricelli, Public Service Electric & Gas T.M. Gerusky, Commonwealth of Pennsylvania ~ L JJ. Lyash, USNRC Senior Resident Inspector R. McLean, State of Maryland T.T. Martin, Administrator, Reg, ion I, USNRC H.C. Schwemm, Atlantic Electric J. ' Urban,' Delmarva Power i, INPO Records Center i 1 q CC0730.NRC / 9008220084 900731 i:>DR ADOCK 0500027,7 i .( [R PDC ..\\'{ l

] 4 F I ~ ^e tc NRC Monthly Operations Summary Peach Bottom Atonne Power Station July 1990 - ] l~ UNIT 2 1 Unit 2 ran at 95% to 100% nominal power from the 1st through the 17th. The slight reductions in power were related to maintenance activities on the '9' reactor feed pump, and tte 'B' and 'C" condensate pumps, and to reactor water chemistry. On July 24, HPCI was declared inoperable for a short time because of low voltage on : ) the battery-supplied bus. i \\ UNIT 3 - i Unit 3 ran at nominal 100% power from the 1st through the 27th.' On the 27th,'the unit was manually shut down' because of low condenser vacuum.". A linkage in a cooling water valve to.the recombiner condenser failed,' ' f leading to low vacuum. The unit entered a 5 day outage and ended the month shut down, with maintenance t activities in progress. ~ a l l. I + l I + ~. c 1 - E \\$ f k 4 >8 1 ' t I - l .i r ?. l-L l:- i 1 ,1 l CC0790.NRC f t a l g

}- U , 7.. w l Docket No. 50 277 - ' Attachment to-Monthly Operating Report for July 1990, UNIT 2 REFUELING INI ORM ATION 1. Name of facility: Peach Bottom Unit 2 2. . Scheduled date for next refueling shutdown: Reload 8 scheduled for January 6,1991: -i 3. Scheduled date for restart following refueling:: Restart following refueling scheduled for April 5,1991 I W'l r fueling or resumption of operation therefore requirc a technical specification change or'other d e lice 2mendment? Yes. i If answer is yes, what, in general, will these be? Safety limh MCPR for cycle 9 fuel. 5. Scheduled date(s) for submitting proposed licensing action and supporting information: January 1991 6. Important licensing considerations associated with refueling.i ;., new or different fuel design or supplier, . unreviewed design or performance analysis methods, significant changes in fuel design, new operating' d. procedures: I 7. The number of fuel assemblics (n) in the core and (b) in the spent fuel storage pool: l 1 (a) ' Core - 764 Fuel Assembhes (b) Fuel Pool - 1734 Fuel Assemblies,58 Fuel Rods _ n I CC0790.NRC 1 1

-r.. .i 3 Docket No. 50 277 ' Attachment to Monthly Operating Report for July 1990_ Page 2 l UNIT 2 REFUELING INFORMATION (Continued) The present licensed spent fuel pool storage capacity and he size of any increase in licensed storage. 8. capacity that has been requested or is planned, m number of fuel assemblies: The spent fuel pool storage capacity has beJn relicensed for 3819 fuel assemblics. 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the - present capacity: September 2003 without full core ofiload capability. September 1997 with full core ofiload capability.- 4 f l I b I 5 'f ~ 'h e 3 CG730.NRC I = t'$f x

m. J-iI

5 j

1 Docket No. 50-278 . Attachment to : I fonthly Operating ~ ' Report for July 1990 UNIT 3 REFUELING INFORMATION - j i - 1. Name of facility: Peach Bottom Unit 3 ) 2. Scheduled date for next refueling shutdown: .-l Reload 8 scheduled for August 31,1991' } 3. Scheduled date for restart following refueling ti Restart follow:ng refueling scheduled for November 29,1991 ; f 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? l. Yes. If answer is yes, what,'in general, will these be? Safety limit MPCR for cycle 9 fuel. 1 5. Schedu' led date(s) for submitting proposed licensing action and supporting information: August 1991 ? L 6. Important licensing consider ations associated with refueling, e.g., new or different fuel design or supplier, - l unreviewed design or performance analysis methods, signincant changes in fuel design, new operating ] procedures: 1 4-7. The number of fuel assemblics (a) in the core and (b) in the spent fuel storage pool: (a) Core - 764 Fuel Assemblies - E (b) Fuel Pool - 1496 Fuel Assemblics,6 Fuel Rods - t i CC07)0.NRC i i 1 o ~ ii Y y --9m+. y ww.

-.z e i Docket No. 50-278 Attachment to ~ Monthly Operating Report for July 1990 Page 2 - .L!MIT *,LREFUELING INFORM AllDN (Continued) b' 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: d The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblics. Modification of the fuel pool is expected to be complete in the fourth quarter of.1990. 9.. . The projected date of the last refueling that can be discharged to the spent fuel pool assuming the ~ present capacity: t With the current fuel poo cepacity (prior to the completion of the fuel pool teracking modification): l September 19% without full core offload capability. End of next cycle with full core offload capability (est. January 1991). With increased fuel pool capacity (subsequent to the completion of the fuel pool reracking modification): September 2004 without full core offload capability..- ~ l September 1998 with full core offload capability. l s l i i f 1 CC07/0.h1C

1 Li 1 sc OPERATING' DATA REPORT' DOCKET NO, 50 - 277 DATE AUGUST 15, 1990-COMPLETED BY HillADELPHIA ELECTRIC COMPANY M. J. BARON _{ SUPERVISOR REPORTS GROUP t PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-7014 EXT.3321 OPERATING STATUS i

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:

'I

2. KEPORTING PERIOD:

JULY, 1990

3. LICENSED THERMAL POWER (MWT):'

3293 -t 4.~NAMEPLATERATING(GROSSMWE): 1152 S. DESIGN ELECTRICAL RATING (NET MWE): 1065 7 6.MAXIMUMDEPENDA8LECAPACITY(GROSSMWE)-.1098 7.MAXIMUMDEPENDA8LECAPA(f!f(NETMWE): 1055

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCi LAST. REPORT. GIVE REASONS:

f i 9.POWERLEVELTOWHICHRESTRICTED,IFANY(NETMWE): '[

10. REASONS FOR RESTRICTIONS, IF ANY:

'THIS MONTH YR-TO-DATE' LCUMULATIVE

11. HOURS IN REPORTING PERIOD 744' 5,087 140,903' I
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0

'3,763.4 .83,290.7

13. REACTOR RESERVE SHUT 00VN HOURS 0.0, 0.0 :

0.0 - [

14. HOURS GENERATOR ON-LINE 744.0 3,653.5 80,258.8
15. UNIT RESERVE SHilTDOWN HOURS 0.0 0.0 0.0' i

16.GROSSTHERMALENERGYGENERATED(MWH) 2,402.304-11',080,776. 236,376.969 17.GROSSELECTRICALENERGYGINERATED(MWH), .'793,900r l3,655,800-77.715,690 l 18.NETELECTRICALENERGY_ GENERATED (MWH) 763,057 '3,520,744' 174,375,593 PAGE'l 0F 2 t

)

f r '.a. 1 i 'OPERATI'NGDATAREPORT(CONTINUED).

DOCKET N0. 50 - 277:

DATE AUGUST 15, 1990 l' .THl$ MONTH- -YR-TO-DATE CUMULATIVE-

19. UNIT SERVICE FACTDK-100.0 71.8 W M 57.0
20. UNIT AVAILABILITY FACTOR

.100.0 71,8 57.0'-

21. UNIT CAPACITY FACTOR (USING MDC NET) 97.2-65.6 50.0 L

22.UNITCAPACITYFACTOR(USINGDERNET)- 96.3 - 65.0 49.6 i

23. UNIT FORCED OUTAGE RATE

'0.0' 16.7; 14.6-- j i -.24.-SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): +

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

i d ~ 26. UNITS IN TEST STATUS (PRI'OR TO COMMERCIAL OPERATION): FORECAST-' ACHIEVED ~ I INITIAL CRITICALITY '09/16/73 INITIAL ELECTRICITY 02/18/74 l COMMERCIAL OPERATION 07/05/74 l: l l l i' PAGE 2 0F 2- -E z t 1 1 i

' OPERATING DATA REPORT DOCKET NO. 50 - 278 ~DATE AUGUST 15, 1990

COMPLETED BY PHILADELPHIA ELECTRIC COMPANY;

.H. J. BARON-s -SUPERVISOR

REPORTS GROUP

' PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-7014 EXT.3321 OPERATING STATUS.

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:

2

2. REPORTING PER100:

' JULY, 1990 4

3. LICENSED THERMAL POWER (WT):.

3293' -{

4. NAMEPLATE RATING (GROSS WE):

1152 j

5. DESIGN ELECTRICAL RATING (hET WE):

.1065 ~l

6. MAXIMUM DEPENDAB'.E CAPACITY (GROSS WE): 1098'-

a 7.MAXIMUMDEPENDABLECAPACITY(NETMWE): 1035

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH.7) SINCE LAST REPORT.,GIVE REASONS:

f

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY. (NET WE):
10. REASONS FOR RESTRICTIONS, IF ANYi 4

1 THIS MONTH ' YR-TO-DATE-CUMUL'ATIVE

11. HOURS IN REPORTING PE9IOD 744 5,087 L136,799'
12. NUMBER OF HOURS REACTOR WAS CRITICAL:

628.0 4,802.5 '81,961.3> l .(

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0.

0.0 j

14. HOURS GENERATOR CN-LINE 628.4

.4;729.5 79,131.7 ~I

15. UNIT RESERVE SHUTDOWN HOURS

.0.0 -0.0: 0.6 1 3

16. GROSS THERMAL ENERGY GENERATED,(MWH) 2,062,323' 14,604.821 230,767,690

. j a 17.GROSSELECTRICALENERGYGENERATED(MWH) 679,700-4,824.300 -75,696,432 1 18.NETELECTRICALENERGYGENERATED(HWH) ~651,116 4.662,134 72,504,702 L 3 I'- r 1 PAGE 1 0F 2 l l t l

f OPERATINGDATAREPORT(CONTINUED) DOCKET NO. 50 - 278. ~ 'l

DATE AUGUST 15, 1P901 THIS MONTH

' YR-TO-DATE ' CUMULATIVE

19. UNIT SERVICE FACTOR 64.5' 93.0 57.8
20. UNIT AVAILABILITY FACTOR' 84.5 93.0 57.8'
21. UNIT CAPACITY FACTOR (USING MDC NET)'

84.6 88.5 51.2 ~ 22.UNITCAPACITYFACTOR-(USINGDERNET): 82.2 86.1 49.8-t

23. UNIT FORCED OUTAGE-RATE'
15.5

. 7.0 12.9' 24.SHUTDOWNSSCHEDULEDDVERNEXT6 MONTHS (TYPE,DATE.:ANDDURATIONOFEACH): PID-CYCLE MAINTENANCE OUTAGE STARTING OCTOBER 27 SCHEDULED FOR 21 DAYS.- I

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

AUGUST 2(ACTUAL) ] ~ 26 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST' ACHIEVED. f INITIAL CRITICALITY 08/07/74' 7 INITIAL ELECTRICITY. 09/01/74 COMNERCIAL OPERATION 12/23/74* .i [ PAGE 2 0F 2 1 f I _Y 5 '\\ h 8 e y 1 4 1)

4-, 1 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277- ' UNIT PEACH BOTTOM UNIT 2 DATE AUGUST 15, 1990 COMPANY PHILADELPHIA ELECTRIC COMPANY ~ M. J. BARON - SUPERVISOR-REPORTS GROUP ' 'k J PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 3321 MONTH JULY 1990 OAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL ~ (MWE-NET) (MWE-NET) 1 1014 17 1049 2 1013 18 1049 3 1033 19 1048 1 4 1037 20 1041 'l 5 1038 21 1029 6 989 22 1054 I 7 992 23 1039-1 8 1001 24 1034' .j 9

997, 25 1042 j

10 988 26 1040 11 1004 27 1039 'l '1 12 996 28 1032 l 13 1017 29-1048 14 1013 30 1036-j 15 1020 31 1039- =I 16 1025 l i i

~ ') - 4 + AVERAGE DAILY UNIT POWER LEVEL-i DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3-( ;- DATE AUGUST 15,'1990 h COMPANY PHILADELPHIA ELECTRIC COMPANY M.'J. BARON SUPERVIS0R REPORTS GROUP' .. j l-PEACH BOTTOM ATOMIC POWER STATION i l. TELEPHONE (717).456-7014 EXT.3321 t ~f MONTH- -. JULY 1990. r DAY' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL' l (MWE-NET). -(MWE-NET) l 1 1039 17 1047 2 1039 18 1048 3 1039 19 1055 4 1035 20 1040 5 1036 21 1019 6 1032 22 '1053 7 -1043 23 1030-l l-8 1035 24' 1033 l 9 1039 25

1037, 10 26 1039 i'

11 '1035 27 156-12 1036 28 0 .i 13 1044 29 0~ 14 1044 30 0 I-T l 15 1035 31 0 o 16 1048 i; e i t

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH BOTTOM UNIT 2 - DA1E AUGUST 15,'1990. REPORT MONTH JULY, 1990 COMPLETED BY PHILADELPHIA ELECTRIC. COMPANY M. J. BARON SUPERVISOR ' REPORTS GROUP PEACH BOTTON ATOMIC POWER STATION- ' TELEPHONE (717)456-7014 EXT.3321 . METHOD OF. -LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTYING DOWN EVENT CODE CODE ACTION TO NO. DATE '(1) (HOURS) (2) REACTOR (3) REPORT f (4) (5). PREVENT. RECURRENCE 1 11 900705 -F 0.0 H 4. N/A HP ZZZZZZ-POWER REDUCTION DUE TO HIGH COPPER CONTENT.IN T::E CONbENSATE. REACTOR L .1 VAS NOT SHUT DOWN. i .I' (1) (2) (3) (4) F - FORCED REASON METHOD EXHIBIT 6 -' INSTRUCTIONS S - SCHEDULED 'A-EQUIPMENTFAILURE(EXPLAIN) 1 - MANUAL FOR-PREPARATION OF DATA. B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR' LICENSEE - C - REFUELING 3 - AUTOMATIC SCRAM; ' EVENT REPORT (LER) - D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) ' FILE (NUREG-0161) E - OPERATOR TRAIN!NG + LICENSE EXAMINATION F.- ADMINISTRATIVE' (5)- G - OPERATIONAL ERROR:(EXPLAIN) H - OTHER(EXPLAIN) EXHIBIT I - SAME Soll CE-1 1 1 -j ] l l \\

e ,3,; c-f '4 ~- y., UNIT SHUTDOWNS PDWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTT Y Uh.T 3- .DATE AUGUST.15. 1990 L REPDRT MONTH JULY,-1990 COMPLETED BY PHILADELPHIA ELECTRIC CDNPANY.- Mi J. BARDN.

SUPERVISDR REPORTS GROUP PEACH BOTTDM ATDMIC POWER STATION _

TELEPHONE (717)456-7014 EXT.3321 METH00 0F LICENSEE-SYSTEM CDMPONENT CAUSE AND CORRECTIVE' d TYPE DURATIDN REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE, (1)

(HOURS) (2) REACTDR (3) REPORT # .(4) (5) PREVENT RECURRENCE - -g t 10 900727 F 116.7 A 2 3-9 0-08 ' SE .VALVEX' RECDMBINER CDOLING WATER CDNTROL VALVE: fi FAILUREc REACTOR MANUALLY SHUT DOWN. 'l 1 115.7 'I . :p (1) (2) -(3)- (4): F - FORCED REASON METHOD' EXHidIT G - INSTRUCTIONS' S - SCHEDULED A-EQUIPMENTFAILURE(EXPLAIN) 1 - MANUAL- .FDR PREPARATION OF OATA .[ B - MAINTENANCE OR TEST 2 - MANUAL' SCRAM. ENTRY SHEETS FDR LICENSEE ~ C - REFUEL!h6 3 - AUTDMATIC SCRAM. EVENT REPORT (LER). D - TEGULATDRY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161) E - PERATDR TRAINING + LICENSE EXAMINATION .i F - A'MINISTRATIVE - (5) -i G - 06 IRATIONAL ERROR (EXPLAIN) 1 H-01.lER(EXPLAIN) EXHIBIT I - SAME SOURCE '\\ I if' .}}