ML20058Q335
| ML20058Q335 | |
| Person / Time | |
|---|---|
| Issue date: | 07/23/1990 |
| From: | Hagan T NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Shiflett D ATOMIC ENERGY OF CANADA, LTD. |
| Shared Package | |
| ML20058Q326 | List: |
| References | |
| CON-FIN-L-1528, CON-FIN-L-1528-0, CON-NRC-03-90-031, CON-NRC-3-90-31 NUDOCS 9008220037 | |
| Download: ML20058Q335 (5) | |
Text
.
. pm:y[o.,,
/
UNITED STATES
.f. g -
NUCLE AR REGULATORY COMMISSION
,y s, #,
wasniwotos. o. c. rosss r,.
a JUL 2 31990 AECL~ Technologies ATTN:
Mr. D. R. Shiflett 15400 Calhoun Drive Suite 100
-Rockville, Maryland 20855 De,ir Mr. Shiflett:
Subject:
Task Order No. 5 Under Contract No. NRC-03-90-031 Entitled
" Site Access Training For AECL Empi.syees" (FIN L-1528)
You are hereby authorized to commence work under the subject task order effective July 23 1990 with an established ceiling of $8,757.27.
In accordance with the task order procedures of the subject contract, this letter definitizes Task Order No. 5.
This effort shall be performed in accordance with the enclosed Statement of Work and the Contractor's proposa? dated July 13, 1990, incorporated herein by reference.
l Task Order No. 5 shall be in effect from July 23, 1990 through July 25, 1990 with a cost ceiling of $8,757.27.
The amount of $8,703.03 represents the total estimated costs and the amount of $50.24 represents the fixed fee.
Accounting data for lask Order No. 5 is as follows:
l B&R No.:
020-19-14-03-0 i
FIN No.:
L-1528-0 Appropriation No.
31X0200.200 Obligated Amount:
$8,757.27 The following individuals are considered to be essential to the successful performance of the work hereunder:
B. Diest l
J. Panesar H. Leung N. Inamdar The Contractor agrees that such personnel shall not be removed from the
. effort under the task order without compliance with Contract Clause H.1, l
Key Personnel.
I 9008220037 20073o i
PDR CONTR i
NRC-03-90-031 PDC i
i J
Mr. D. R. Shiflett NRC-03-90-031 Task Order No. 5 Page 2 of 2 The issuance.of this task order does not amend any terms or conditions of the subject contract.
iour contacts during the course of this task order are:
Technical Matters:
Wayne C. Walker Project Officer (301) 492-1232 Contractual Matters:
Brenda J. DuBose Contract Management Assistant (301) 492-7442.
Please indicate your acceptance of this task'. order by having.an. official',.
authorized to bind your organization, execute three copies'of this document in the-space provided and return two copies to the Contract Administrator.
You should retain the third copy for your records, Sincerely, ff A~
l '5
./
f
,/ -
/ Timothy..- Hagan, Contracting Officer Contract Administration Branch No.'1 Division-of Contracts and-Property Management-Office of Administration
Enclosure:
As stated ACCEPTED: Task Order No. 5 V
LLU Cf l NA F u
AGLvto tt/
AO ka. L ~
TITLE
/
/
YOff()
DATE a
my_g.
,# g 3;
y w
1
+
,Y k
^
7 Mi Y
q
[f
~
': ~
~
N a
c1 m s
as
-, v-7.Comract;HRC...03-90-0314 m
1AECL%Techrl ologies:
j
.y!
7 l
J STATEMENT OfcWORK d
E' U a d Order 06 E q
q f"
1. ic, - rTitle:
Site? Access Tra'ining for AECLLE'ployeesi j
m.
M E*
' F lil:" L-1528 :
'e j
s Wayne / Wal.Ler, NRR (301-492-1232)L,
j y *-
NEC/ PROJECT MAtlAGER:
U.
-NRC TEAffLEADERL Robert' Gramm, tiRRJ (.301 f 492-0991)4 1,
1
,NRC C0flTh C' ADMINP "i',OR:
BrendafuuBose,: ARM (301-492-7442)
'i
~
n a
L
, July.25,71990
- PD;100 0F: PERf0RMANCE:
tJuly>23,-Im e m
' B.ACKGROUND.
c..
?
'NRC'headquar ers Special' Inspection _Branchshas thefresponsibili_ty to'obtain.
i design consultants to' support inspe.ctions; There areiseveralIvarieties of-1
' inspections-that ut'ilise designii~nspectors.
These include Safeti" System Outage Modification inspections 3(SSOM1), Safety' System functional Inspecti,onss
'(SSFI), Electrical Distribution:Functiona.1 Inspections =(EOF 1)',fand Engineering Technical Support.'
q y
All'of.'these inspections' require'on-site inspection activities.-Eachiinspect.oh J
t N
4 normally operates independently 1whi.le pursuing their/ area 'off concern.. Fort. hisc reason sitesaccess - training-is= necessary to 'al: low (the ' consultants tof obtaini
- j unescorted access to fperform~ on; site-inspectioniactivities.
m j
lI 0_BJ_E CT I VE The obiective of, this task order isi to have. AECL technichipersonnel.
d
~successfully1 complete th~e NRC site access training program.:iThis;wi.l_liallow.
9 them to obtain unescorted accest and support NRCDdesignLinspections.
J s
. ORD REQUIREMENTS AND SCllEDULE" 3
W The work specified in' this < statement -of ' work.(S0W): f all's Ewithin*Section C.li3-ofi he basic 1 contract's S0W.",The contractor shall providelthecqualifindJ
- j t
cspecialists?to be trainedrand the uecessaryffacilities,;matepia,ls band,toi I allow the NRC? staf f-to - conduct the-Site ' Access Training; Cou'rse 'a t othe; em con tra ctor! s ' f acili ty.
TASK
.'SCllEDULE:
"I 1.
' Attend classLroom training
. :Theitraining is 1
session'which will pr' ovide scheduled.to take place on or about uneric uhderstanding of:
'Julyi24 and 25,Ll997 I
o rr 2
t
~
j.'.j E'
A
~
m m,
3 3
$g f
y
.+
4 4
5
.1 i'w%
L(a).radiat' ion types,,quantit'les andI Tunitsi (b) biologic $1 effects offradiation:
1(c)~ radiation' protection; regulations,.
-A
-.. guides,fareas,-and warnings-(d) : control,of radiation exposure and:
ALARA-practices;
.(e) -radiation monitoring instruments.
- and personnel ~ dosimeters:
(i, industrial safety and hygiene.
Ig): security and emergencies
-2.
Attend-demonstration and classroom The-training is-training on'. personnel dec'ontamination-scheduled for'
-and use of protective clothing._ This._.
July,25,'1990_
~
wi'll-. include a. full: dress out ' andJp'racticalI test on protective' clothing and' working 1 within a radiation; area.-
3.
Prepare a sunnary report.of training.-
-No later than fifteen working days following
- completion.of:
training RECUREfiENTS
-At the : completion of. Task 1 there 'will be.:a manditoryl50 ' question test which requires an S0r or better grade ~foripassing'.
Durina Task ?, each contractor, specialist _will' be testedito ' assure proper l
i orecedures t.retfollowed during dress >up and simulated work in radiation area.
At the conipletion of ' Task 3, the; contractor-shall-provide a.!summaryireporti 1.isting all. contractor'specia.ists,;their technical discipline'and'their grade
!j l
q on"the site access trainin'g test._
i
- Business Letter Reports 1
y
'The centractor shall-provide, monthly progress; reports in'accordance withLthe.
]
' requirements 'of 'the! basic' contract.
~
MEETINGS AND TRAVEL
}
\\
One.,five-person,:three day trip t' NRC' Training Center inoBethesda, MD for o
'~
' attendance at site. access training.'
q 1
ESTIMATED LEVELLOF EFFORT-
.i 1
}
Mumber Discipline Hours Project (Unager
~F-g
-~~'~
1; Mechanical-systems 16 1
2-Electrical engineers 11 8 j
- p Suppor_t staff 10
.:..I
/ 5, r 3
The estimated level of effort for each of the specialists co'nsists of 16 heurs i
for classroom instruction, 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for practical training in using protective clothing and working in a radiation area, l
It shall be the responsibility of the contractor to assign technical staf f, employees, subcontractors who have the required caucational background, experience, or combination thereof., to meet both the technical and regulatory objectives of the work specified in this 50W, b
i i
1 i
_ _.. _... _ _... _ _.