Ltr Contract NRC-03-90-027,awarding Task Order 5,to Review of Retran Computer Codes & Confirmatory Licensing Calculations Associated W/Safety Analyses
ML20058Q317
Person / Time
Issue date: 07/16/1990
From: Hagan T
NRC OFFICE OF ADMINISTRATION (ADM)
To: Komoriya H
INTERNATIONAL TECHNICAL SERVICES, INC.
Shared Package
ML20058Q299 List:
References
CON-FIN-L-1318, CON-FIN-L-1318-0, CON-NRC-03-90-027, CON-NRC-3-90-27 NUDOCS 9008220031
Download: ML20058Q317 (5)


Text

.

  • {#

A UNITED STATES

' g$ ' f /\\

NUCLEAR REGULATOPY. COMMISSION W ASHINGTON, o. C. 20555

/

JUL 161990 International Technical Services, Inc.

ATIN:

Dr. Ilideko Komoriya I

420 Lexington Avenue New-York, New York 10170

Dear Dr. Komoriya:

l

Subject:

Contract No. NRC-03-90-027, Task Order No. 5 Entitled " Review of RETRAN 2 MOD 5.0" (FIN L-1318)

You are hereby authorized to commence work under Task Order No. 5 effective July ]6,1990 with an established ceiling of. $44,125.00.

j i

In-accordance with Section G.5' Accelerated Task Order Procedures, of the subject contract, this letter definitizes Task Order No. 5.

This effort shall be performed in accordance with the enclosed Statement of Work and the Contractor's proposal dated July 10, 1990 incorporated hereie by reference.

}

The period of performance for Task Order No, 1 is July 16, 1990 through December 30, 1990.

The total cost ceiling is $44,125.00..The amount of

$40,260.00 represents the total reimbursable costs and the amount of

$3,865.00 represents the fixed fee.

i Accounting data for Task Order No. 5 is as follows:

B&R No.:

020-19-15-02-0 FIN No.:

L-1318-0 Appropriation No.:

31X0200.200 i

Obligated Amount:

$44,125.00 I

The following individuals are considered by the Government to be essential

-to the' successful performance of the work hereunder:

Hideko Komoriya Paul Abramson The Contractor agrees that such personnel. shall not be-removed from the effort under this task order without compliance with Contract Clause H.1 -

-Key Personnel.

The issuance of the task order does not amend any terms.or, conditions of the subject contract.

I 9008220031 900723 PDR CCNTR NRC-03-90-027 PI C 1

k Dr. Hideko Komoriya NRC-03-90-027 Task Order No. 5 Page-2 of 2 l

Acceptance of Task Order No. 5 should be made by executing three copies t f this document in the space provided and returning two copies to the 3

Contract Administrator.

You should retain the third copy for your rece.ds.

Should you have any questions regarding.this matter, please feel free to contact Brenda DuBose, Contract Management Assistant, on (301) 492-7462.

Sincere 1y, l

l 4 d A-t m.

Timothy F. Flagan, Contracting Of ficer r#[

Contract Administration Branch No. 1

- {

Division'of Contracts and.

Property Management Of fice of Administration -

Enclosure:

i As stated 1

ACCEPT k Order No. 5

-h< n%wr NAME

[

~ N r

TITLE

~ '

l 4, A 2 3. /990 DKTE.

i k

t t

9

k i

,s e o -

C' i

Contract NRC-03-90-027

-ITS STATEMENT OF WORK Task Order No. 005 TITLE:

Review RETRAN 2 MOD 5.0 flN:

L-1318 PROJECT MANAGER:

Wayne C. Walker (301-492-1232)

LEAD ENGINEER:

Don Katze (301-492-1815)

PERIOD 0F' PERFORMANCE July 16,1990 through December 30, 1990 PRIORITY NO.:

3 1

BACKGROUND RETRAN02 is one-dimensional, best-estimate, thermal-hydraulic, transient analysis computer code under the sponsorship of the Electric Power Research Institute. The NRCs Safety Evaluation Report for RETRAN02 M002 was issued on September 2, 1984 Subsequently RETRAN02 M003 and RETRAN02 M004 were reviewed j

by the NRC and approved for use in 1988..The RETRAN02 M005.0 version contains j

35 changes to the M004 version. Thirty-two changes were made to correct reported code errors. The other three changes were made to incorporate new models. The. purpose of the submittal is to review RETRAN02 MOD 5 for its.

acceptance for generic use in licensing applications for calculating.the j

transient response of nucle 6r pcwer plant behavior, subject to the conditicr.5 I

outlined in the previous safety evaluation reports.

i OBJECTIVE The objective of this task order is to obtain technical expertise' from ITS to u.sist the stuf f in determining the acceptability RETRAN02-M005.0 and the> significance of'the-reported code errors.on previous; analyses.

WORK REQUIREMENTS AND SCHEDULE Tasks Scheduled Completion 1.

Review the thirty-five changes that were N'otiater than six f

made to upgrade RETRAN02 M004 with respect Jwee ks. af.ter.- ini ti a tion,.

y to'the adequacy of the system models, and of work 1

ifjnecessary, prepare a request for additional j

information required to complete'the review.

j 2.

Review ~and evaluate.the responses to the No later than three reque'st for additiona'l information and.

weeks.after receipt-4 assist the staff in resolving any remaining.

-of the additional in-open items including attendance at a meeting formation.or meeting a.+

~...

(

('

. ~

with representatives of the with RETRAN02 Maintenance.

RETRAN02 Maintenance Group, if Group, whichev r is later.

required to achieve resolution.

3.

Prepare a draft technical No later than.our weeks evaluation report (TER) that af ter completion of Task 2.

=

documents the results of the technical review completed under Tasks 1 and 2 for NRC review and comment.

4.

Incorporate NRC comments and No later than two weeks prepare a final TER.

after receipt of NRC comments on the draft TER.

LEVEL OF EFFORT AND PERIOD OF PERFORMANCE The estimatrd level of effort is 3 staff-monthss.

TECHNICAL REPORTING REQUIREMENTS At the completion of Task 1, submit a technical letter repcrt tc the !RC 1

Project Manager, with a copy to the NRC Lead Engineer, that summarizes tre i

results of the work performed to date and contains the request for addittoral information.

If additional information is not require 0 to couplete the review, the letter report should summarize the work completed,. indicate th3; additional information is not required to complete the review, and state the i

proposed schedule for. delivery of the draf t TER.

At the completion of Task 3, submit a draf t TER in accoraance with the basic project statement of work (50W). The TER shall contain an executive summary, a discussion of the work perforned, conclusions reached with technical bases, and recommendations as to the acceptability ci the topical report reviewed.

At-the completion of Task 4,. submit a final TER -in accordance with the basic.

project S0W that incorporates the NRC's comments on the_ draft TER.

MEETINGS AND TRAVEL One two-person, two day' trip to the NRC headquarters in Rockville, MD_for a meetinguto resolveJopen issues. Dates will be mutually agreed upon;between the NRC Project Manager and the contractor, i

i e

i

-_3..

APPLICABLE SPECIAL PROVISIONS The work specified in this 50W is licensee fee recoverable.

The contractor shall provide fee recovery information in the monthly progress reports as specified in Section F.3.2 of the basic contract.

j lt shtll be the rest.cnsibility of the contractor to assign technical staff employees, subcontractors, or consultants who have the required educational background, experience, or combination thereof, to meet both the technical and regulatory objectives of the' work specified -in this 50W. The NRC will rely on reprtsuit6t'cos Ltce by slic contractcr concerning the qualifications of the personnel proposed for assignment to this task order including assurance that all information contained in the technical-and cost proposals, including =

resumes and conflict of interest disclosures, is accurate and truthful. -The j

use of particular personnel is subject to NRC approval.

i 1

NRC FURNISHED MATERIALS The NRC will provide all necessary documentation to facilitate successful completion of this project. This will include volumes 1,2, and 3 of RETRAN02, M005.0 and description of code modifications and other relevant material.

l i

o E

~

j-

.