ML20058Q011
| ML20058Q011 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/14/1993 |
| From: | Long R GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20058Q013 | List: |
| References | |
| C-93-2242, C000-93-2242, C312-93-2064, NUDOCS 9310260040 | |
| Download: ML20058Q011 (2) | |
Text
.-
ENuclear "t=: f=" "
Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386 Writer's Direct Dial Number:
(717) 948-$400 October 14, 1993 C312-93-2064 C000-93-2242 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Three Afile Island Nuclear Station, Unit 2 (TMI-2 Operating License No. DPR-73 Docket No. 50-320 TMI-2 Fire Pmtection Pmgnm Evaluation
Dear Sir:
Attached is a proposed revision to the TMI-2 Fire Protection Program Evaluation (FPPE) reflecting modifications that are consistent with the forthcoming condition of TMI-2, i.e., Post-Defueling Monitored Storage (PDMS). This revision will be in effect upon entry into PDMS.
i The conclusion of Part I Section 3.2.2 of the FPPE is that an offsite release gmater than the limits specified in 10 CFR Part 100 would not result from any postulated fire scenario. This document further concludes (Part I Section 3.2.3) that this change is not an Unreviewed Safety Question as defined by 10 CFR 50.59 and, thus, it will not require NRC approval prior to its implementation when TMI-2 transitions into PDMS.
Sincerely, af f x y a cfo R. L. Iong Director, Service ision/TMI-2 g50];3 EDS/dib Attachment i
cc: See Page 2 f
f,dv '
9310260040 931014 PDR ADOCK 05000320 4
\\g
_1 F-PDR.
EL GPU Nuclear Corpcration is a subs!dia y of General Public Utiiaes Corporation
Document Control Desk October 14, 1993 C312-93-2064 C000-93-2242 Page 2 cc:
M. G. Evans - Senior Resident Inspector, TMI T. T. Martin - Regional Administrator, Region I M. T. Masnik - Project Manager, PDNP Directorate L. H. Thonus - Project Manager, TMI t
t e
i b
-,