pnMc UNITED ST ATES
/
.g NUCLEAR REGULATORY COMMISSION
[' ( QI j
REclON IV 8
611 RYAN PLAZA DRIVE, SUITE 400 o$
[
AR LINGTON, TEXAS 76011 8064 OCT I 81993 Docket:
50-458 License:
NPF-47 Gulf States Utilities ATTN: John R. McGaha, Vice President River Bend Nuclear Group P.O. Box 220 St. Francisville, Louisiana 70775 P
SUBJECT:
OCTOBER 12, 1993 PUBLIC MEETING DOCUMENTATION This refers to the public meeting conducted on October 12, 1993, at NRC's request, at the Training Center Auditorium located at your River Bend Station facility. The meeting was attended by those listed in Enclosure 1.
The subjects discussed at this meeting included recent organization changes and the near-term Performance Improvement Plan for River Bend Station. We found this meeting useful in understanding the current status of your near-term improvement efforts. At the conclusion of the meeting, NRC agreed with your proposal to hold a meeting later this year where the results of your near-term improvement initiatives and your longer range improvement plans will be discussed. The NRC staff will monitor the results of your implementation of this plan during future inspections.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," Part 2, i
Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, c) i
/
/
y A. Bill ch, ire o Division of Re tor P o ects
Enclosures:
l.
Attendance List 2.
Licensee Presentation
>g
,Y 9310250082 931018 PDR ADDCK 05000458 P
ppg r
Gulf States Utilities,
t'
- cc w/ enclosure:
Gulf States Utilities ATTN:
J. E. Booker, Technical Assistant P.O. Box 220 St. Francisville, Louisiana 70775 Gulf States Utilities ATTN: Harold W. Keiser, Senior Vice President P.O. Box 220 St. Francisville, Louisiana 70775 Gulf States Utilities ATTN: Michael B. Sellman, Plant Manager i
P.O. Box 220 St. Francisville, Louisiana 70775 Gulf States Utilities ATTN: ' James J. Fisicaro, Manager - Safety Assessment and Quality Verification P.O. Box 220 St. Francisville, Louisiana 70775 Winston & Strawn ATTN: Mark J. Wetterhahn, Esq.
1401 L Street, N.W.
Washington, D.C.
20005-3502 Gulf States Utilities
-j ATTN:
Les England, Director Nuclear Licensing P.O. Box 220 St. Francisville, Louisiana 70775 Mr. J. David McNeill, III
)
William G. Davis, Esq.
Department of Justice Attorney General's Office
)
P.O. Box 94095 Baton Rouge, Louisiana 70B04-9095 H. Anne Plettinger 3456 Villa Rose Drive l
Baton Rouge, Louisiana 70806 i
President of West Feliciana j
Police Jury P.O. Box 1921 i
i St. Francisville, Louisiana 70775
)
l
.l m
a
f J
Gulf States Utilities..;
3 Cajun Electric Power Coop. Inc.
ATTN:
Philip G. Harris 10719 Airline Highway
-P.O. Box 15540 Baton Rouge, Louisiana 70895 Hall Bohlinger, Administrator Radiation Protection Division l
P.O. Box 82135 Baton Rouge, Louisiana 70884-2135 l
i 9
P P
1 L
i r
I I
3
{.
Gulf States Utilities gg g bec.to DM6 (IE45)-
bcc distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV file Section Chief (DRP/TSS)
Senior Resident inspector, Cooper 2
_m L !
lRIV:DRP/C % s C:DRP/C W D:DRP k
}
VBJones;df
}JEGa911ardo ABBeach y 10/ib/93 IO/6 /93 10//k/93h l
2200'~
rs6 in
4 Gulf States' Utilities OCT l 8 EEK3 bcc to DMB (IE45) bcc distrib. by RIV:
J. L. Milhoan Resident Inspector Section Chief (DRP/C)
Lisa Shea, RM/ALF, MS: MNBB 4503 MIS System DRSS-FIPS RIV File Section Chief (DRP/TSS)
Senior Resident Inspector, Cooper l
t' f
-u
/ /
RIV:DRP/Ctrh, C:DRP/Cte-(
D:DRP(ff WBJones;df kJEGagliardA ABBeach v/
10/h /93
)0/i6 /93 10//k/93)
t l
1 t -
Attendance list i
Gulf States Utilities r
W. Beck, Director, Nuclear Training W. Benedetto, Manager, Louisiana Communications-J. Booker, Assistaat to the Vice President (RBNG)
N. Carver, Director, Employee Relations J. Curless, Manager, Strategic Planning & Control K. Dreher, Administrator, Municipal Affairs E. Ewing, Assistant Plant Manager. Maintenance J. Fisicaro, Manager, Safety Assessment and Quality Verification J. Hamilton, Manager, Engineering R. Harvin, Nuclear Communications Specialist
't H. Keiser, Senior Vice President
[
i J. McGaha, Vice President (RBNG)
S. Radebaugh, Acting Manager, System Engineering M. Sellman, Plant Manager i
K. Suhrke, Manager, Site Support J. Venable, Assistant Plant Manager, Operations & Radwaste R. Westerburg, Gulf States Utilities Attorney K. Zimmermann, Senior Nuclear Communications Specialist i
Caiun Electric Power W. Curran, Site Representative Enteroy Operations Incorporated D. Hintz, President & CEO F. Titus, Vice President, Engineering i
Louisiana Radiation Protection Division T. Bickham Public Service Commission B. Eddington Public Attendees T. Dickson M. Goldsby (Channel 9)
L. Kettl J. Mikronis J. Minton V. Plauche H. Plettinger T. Toups (Channel 9)
F
. \\
Nuclear Regulatory Commission E. Adensam, Assistant Director for Region IV & V Reactors, Office of Nuclear Reactor Regulation (NRR) l E. Baker, Project Manager, NRR S. Black, Director, Project Directorate IV-2, NRR J. Gilliland, Public Affairs Officer, Region IV T. Gwynn, Acting Director, Division of. Reactor Projects, Region IV
~
C.' Hackney, State Liaison Officer,. Region IV J. Milhoan, Regional Administrator, Region IV J. Roe, Director, Division of Reactor Projects III/IV/V, NRR C. Skinner, Resident inspector, River Bend Station W. Smith, Senior Resident Inspector, River Bend Station I
w b
t 4
h l
b c usure 2 l
l RIVER BEND STATION i
l I
October 12,1993 NRC/RBS MEETING a
1 1
L AGENDA 1
1 l
I. INTRODUCTION H.W. KEISER j
i
- 11. PURPOSE OF MEETING J. R. McGAHA Ill. RIVER BEND's NEED FOR IMPROVEMENT J' R' McGAHA l
AND RECENTINmATIVES 1
IV. OVERVIEW OF NEAR TERM PERFORMANCE i
M. B. SELLMAN IMPROVEMENT PLAN LNTPIP?
j
)
V. LONG TERM IMPROVEMENT PLAN J.J. FISICARO j
VI. CONCLUDING REMARKS J.R. McGAHA l
l
4 4
4 WHY ARE WE HERE TODAY?
FOLLOW UP TO EARLIER MEETINGS WITH NRC
-JUNE 1993 l: REGION IV; MR. MILH0ANL AUGUST 19931 NRR; DR. MURLEY?
4 e
REVIEW WHAT WE HAVE FOUND e
REVIEW WHAT WE HAVE DONE REVIEW WHAT WE Wil. BE DOING IN THE FUTURE
i 4
4 e RBS PAST OPERATING PERFORMANCE l
t o RECENT OPERATING PERFORMANCE t
e MANAGEMENT COMMITTED TO:
- SAFE AND RELIABLE OPERATION OF PLANT
- EXCELLENT PERFORMANCE
.i RECENTIMPROVEMENTINITIATIVES INITIAL FOCUS i
ORGANIZATION AND MANAGEMENT CHANGES PLANT MATERIAL CONDITION CORRECTIVE ACTION / ROOT CAUSE ANALYSIS PROCESS FUNDAMENTALS COMMUNICATIONS TEAMWORK
~
5 t
t 23rman of the Ecarc Ores! cent ana CED Joseph Donnelly Einior Vice Presicent-
{
Nuclear Opera: cns Harold Keiser l
1 Vice Presiaent l
l
&,:er Send Nuciear Group l J. McGaha i
1 j
' I *"Y.
Mant Manager j : Manager, Sa'ety Assessment :-
632 7 EI; " ? ii and 0uahty verdication M.Sellman i J. Hamilton
_...-_y;.4 J. Fisicaro i
g 1
EP :xrc:nror iT::a: h c.
D. Thomas i
i I
I i
?
I 1
I NO CHANGE i
i I
i I
NEW TO RBS J
E'.
CHANGE IN JOB RESPONSIBILITY OR REPORTING RELATIONSHIP i
i 9
wi
t r
PLANT STAFF j
i r
?! ant Manager l
M. Sellman I
i i
i i
t B';:
j D::cty % :.: :.gica
- s:: ;n *.1g-il Asst Plant Mgr
'carr:
0;a;e */ra2 ment !
I Vaintenance e
E. Ewing i
j B. Odell P. Freehill i
?
- e:ts : emstry Director.NuclearSecunty '
B. Burke nr.F01 H. Hutchens t
i NO CHANGE i
1 1
NEW TO RBS i
I i
i I
[
CHANGE IN JOB RESPONSIBILITY i
[
OR REPORTING RELATIONSHIP I
..._.__.m, u
a 1
1 l
1 1
1 I
i l
l
?
i p
)
i NEAR TERM i
r PERFORMANCE i
i
.1 3
IMPROVEMENT 3
PLAN I
I s
l t
t t
)
E I
I 5
I
9 NEAR TERM PERFORMANCE IMPROVEMENT PLAN (NTPIP) i e
PURPOSE e
METHODOLOGY ISSUES e
ROOT CAUSES S
~
NEAR TERM PERFORMANCE IMPROVEMENT PLAN (NTPIP) i PURPOSE e
ADDRESS NEAR TERM CHALLENGES TO ACHIEVEMENT OF STATION OBJECTIVES PRIORITIZE o
ALLOCATE APPROPRIATE RESOURCES ASSIGN ACCOUNTABILITY I
e SERVE AS ANINPUT"OTHE1994 STATION COMPREHENSIVE BUSINESS PLAN
l C
BROUGHT PEOPLE TOGETHER i
GSU MANAGEMENT & EMPLOYEES 1
E01 MANAGEMENT d
A-INDUSTRY" EXPERTS" #
LOOKED AT PAST ASSESSMENTS NRCINSPECTIONS INTERNAL SELF ASSESSMENTS
.NPO EVALUATIONS LINE MANAGEMENT ASSESSMENTS INDEPENDENT THIRD PARTY ASSESSMENTS
ISSUES e
MATERIAL CONDITION e
CORRECTIVE ACTION j
e HUMAN PERFORMANCE EFFECTIVENESS e
MANAGEMENT PROCESSES e
STRATEGIC PLANNING WORK PRACTICES e
ENGINEERING SUPPORT i
4 ROOT CAUSES MANAGEMENT SKILLS HAVE NOT KEPT PACE WITH CHANGE i
PLANNING AND MONITORING HAVE NOT BEEN EFFECTlYE PROBLEM IDENTIFICATION AND PROBLEM SOLVING METHODS HAVE NOT CONSISTENTLY IMPROVED PERFORMANCE l
PROCESSES AREINEFFICIENT AND HAVE ALLOWED BACKLOGS OF WORK i
TO OCCUR
~
l ACTION PLANS DEVELOPED BY TEAMS 1
RESPONSIBILITY AND ACCOUNTABILITY ASSIGNED TO COGNIZANT MANAGER HOW WILL WE MEASURE ?
PERFORMANCE MEASURES.
t d
-=w-
3 COMMUNICATION OF NTPIP i
i GSU EMPLOYEES i
9 OVERVIEW PROVIDED AT EMPLOYEE MEETINGS 9 REVIEWED IN DETAllWITH ALL MANAGERS AND 1
EMPLOYEE DEPARTMENTAL MEETINGS 9 COPIES OF NTPIP AVAILABLE IN EACH DEPARTMENT i NRC l
9 OVERVIEW PROVIDED AT OCTOBER 12 MEETING 9 PERIODIC UPDATES OF PROGRESS TO BE PROVIDED l
REGIONIV AND NRR 9 MORE FREQUENT UPDATES TO BE PROVIDED TO RESIDENTINSPECTOR
j FUTURE PLANS e NTPIP SERVES AS INPUT TO 1994 j
COMPREHENSIVE BUSINESS PLAN e SITE BUSINESS PLAN I
i 4
- LONG RANGE PLAN (STRATEGIC PLANNINGL
- CAPTURES PRIORITIES RESOURCES AND i
ACCOUNTABILITY
-ENSURES COMMITMENTS ARE MET
- SOLUTIONS I
-=-r-v-
u
a SITE BUSINESS PLAN e ROAD MAP FOR ACHIEVING NUCLEAR EXCELLENCE
)
gg i HIGH REGULATORY PERFORMANCES AS MEASURED BY SALP SCORES i
PLANTPERFORMANCE: lllSM"o^fy"!A"ls"4M,^'
COS" 'd0NE = i AS MEASURED BY MILLSlKWHR '
' " " " "c " c "' ""^"c '
-