's.....f' August 9, 1990 CHAIRMAN The Honorable Tom Bevill, Chairman Subcommittee on Energy and Water Development Committee on Appropriations United States House of Representatives Washington, D.C.
20515
Dear Mr. Chairman:
I am enclosing the Nuclear Regulatory Commission's quarterly status report on licensing schedules.
The e-which covers the secono quarter of calendar year 199t, provided in response to the direction given in House ns 4"97-850.
On April 17, 1990, the HRC staff issued License No. NPF-87 authorizing full-power operation for Comanche Peak Unit 1.
Construction of Comanche Peak Unit 2 is approximately 85 percent complete.
The NRC staff has issued its Safety Evaluation Report on the Watts Bar Nuclear Performance Plan and is continuing to review the various corrective action programs and other licensing issues for Watts Bar.
I The regulatory delays described in this report are not affected by the schedule for resolving off-site emergency i
preparedness issues.
Sincerely,
- ~.
g or e J. Remick A
Chairman
Enclosure:
NRC Quarterly Status Report cc:
Rep. John T. Myers
)
t i 2D /43 h
q i
)
1 ENCLOSURE NRC QUARTERLY STATUS REPORT Oh LICENSING SCHEDULES FOR THE SECOND QUARTER OFTY 1990 Comanche Peak Steam Electric Station The NRC staff issued a full-power operating license for Unit 1 on April 17, 1990.
The plant is nearing the end of startup testing and power ascension, and commer-cial operation is scheduled to begin in August 1990.
l Unit 2 canstruction is approximately 85 percent complete.
Engineering studies l
are in progress, and major construction activities are scheduled to resume in January 1991. Cold hydrostatic testing of the Unit 2 reactor vessel systems is scheduled for the fall of 1992 to support fuel load in early 1993, 1
l Watts Bar Nuclear Power Plant On May 22, 1989, theapplicant(TVA)submitteditsplanforthelicensingof WattsBarUnit1[theWattsBarNuclearPerformancePlan(WBNPP)].
In this plan, the applicant described the actions to identify, document, investigate, and correct problems at the Watts Bar plant.
The NRC staff sent its Safety Evaluation Report (SER) on the WBNPP to TVA by a letter dated December 28, 1989.
Most of the corrective action activities, covered by 18 corrective action programs and 11 special programs, are well under way at Watts Bar.
The staff believes that successful implementation of these programs will resolve most of the problems encountered at this plant. The staff began its review of the Technical Specifications in April 1990, and the review is expected to take about 1 year.
TVA's proposed fuel load date of September 1991 is considered ambitious because of the volume of construction and engineering activities.
.=-
-y
,.y.
. :7 v
r
-m
':k!-
i-e -
.x v.
w g._
- n :. -
3.-
+-
1 ty OFFICE OF MUCLEAR REACTOR REGIL ATION
>. j.
Licensing Schedules for All Pe.wfing OL APPLICATIONS -
TABtI (1 of 2) 1/01/90" SER -
SSER Comm. Decision l# '
Est Staff Staff ASLB Appl.
Delay.
Issue Technical-Issue-ACRS
- Issue Technical Issue 2/ Start of Initial.
' Come.-.,j~"Constr
~ Plant (Months) ' DES
FE5 Irput to PD 55Elr Hearing Decision Eff.**
Dec.
Cool.
Comanche Peak 1 0 C'
C C'
-C
- - C'
'C C'
C
N/A N/A' C*
C
. ComanchePeak2}O C-C C
C C~
N/5 N/5 C'
N/A N/A 12/92*
12/92*
Watts Bar 1 0
C C
C C
C C
C
'Aone
None2 f1A
' 9/91
' 9/91!
S#
Wstts Bar 2 0
C-C C
C.
C
- C.
C Mone None N/A '
N/5
~N/5-0 N/5 N/5 N/5 N/5 N/5 N/5
- N/5 None Mone-N/A N/5 N/5:
Bellefonte 1 0
N/5-N/5 N/5 N/5 N/5 N/5 N/5 None None-N/A N/5 -
~N/5 -
~
BeIlefonte 2 Grand Gulf 2 E!
O C
C C
C C.
N/5 N/5 Mene
~ None N/A N/5
' N/5 E!
O C
C C-
. C C
M/S N/5 C
C C
N/5 N/5 P rry 2 WNP-1 5 0
C N/5 N/5 N/5
' N/5 N/5 N/5 K/5 N/5-N/5
' M/S N/5.-
W4P-1 5 0
N/5 N/5 N/5 N/5 N/5 N/5 N/5 N/5 N/5
.N/5 N/5',
IN/5
)
Indicates changes from last report in Decision or Construction Completion Date
~
Ccamission decision on effectiveness of ASLB decision C/5: Not Scheduled N/A. Not Applicable 5
a.
e O
4 4-g y.
N q,' gip
-+w,,w-3ya r L4
.,gy.--
g gr W a -
e g g-
=g.9eq-g-
.(
7-pi.'*rdby-,
g-.y.+-
y
'. +ip
%-.ewyg y e yi.
g sy-'eyy,p.
,gwp.
gi
.e-t -Wuft" t
f"$**'W us ya='-
-v'9
t
- -m-P
>my se
h :.
. t hM3
- t-k n:
TABLE iPage 2 of 2) a FOOTNOTES 1/
LicenTing schedules and decision dates do not reflect additional-potential delay from emergency preparedness review.
For plants with construction completed, the Commission decision dates indicate the date for the decision on a full-power license; however, initial licensing may proceed (restricting a
powerto5percentofratedfullpower)onthebasisofafavorableASLB decision (if2ap)11 cable) and a preliminary design verification by the applicant and tie staff.
Construction completion dates and Commission decision dates are based on the applicant's estimate of construction completion.
2/-
E The date shown is the estimated date for issuing the first safety evalua-tion report supplement-(SSER) af ter the Advisory Committee on Reactor-Safeguards (ACRS)~meetingontheapplication. A "C" indicates that this SSER has been issued. Additional'SSERs will be iisued to close out remaining open items.
El - Comanche Peak Unit No. 2 fuel-load is scheduled for early 1993.
i S/L On-June 29,L1988, TVA announced deferral of Bellefonte 1 and 2.
The schedule for completion will be considered at a later time. Work on Watts Bar will be primarily focused on Unit 1.
5/-
Construction has been halted; a construction completion date has not-been estcblished.