NOTICE OF VIOLATION Centerior Service Company Docket No.
50-440 Perry Nuclear Power Plant License No. NPF-58 During an NRC inspection conducted on July 13 through August 31, 1992, a violation of NRC requirements was identified.
In accordance with the
" General Statement of Policy and Procedures for NRC Enforcement Actions," the violation is listed below:
10 CFR 50.9, Completeness and accuracy of information, requires, in part, that information required by statute or by Commission regulations, orders, or license conditions to be maintained by the licensee shall be complete and accurate in all material respects.
Contrary to the above, the licensee determined that records required to be maintained by Commission regulations or license conditions were not complete and accurate in all material respects. Specifically, during the period of March thru July 1992, 9 records were identified as being incomplete or inaccurate. These errors were material in that they evidenced that checks had been made when they had not.
No response to this Notice of Violation is required.
Dated at. Glen Ellyn, Illinois this K"-day of October, 1993 9310250054 931015 PDR ADOCK 05000440 G