ML20058N662

From kanterella
Jump to navigation Jump to search
Provides Results of Discussion Between NRC Project Manager & Member of Staff on 931007 Re TS Change Request 210 & 65 Developed to Incorporate New Standard TS Wording Provided in NUREG-1431
ML20058N662
Person / Time
Site: Beaver Valley
Issue date: 10/08/1993
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1431 NUDOCS 9310200155
Download: ML20058N662 (1)


Text

I'

~

,t 1

0,,

Al '

.jp :

(.f

.i T hg sver Valley Power Station

~

hy GNppingport, PA 15077-0004 v

p j.

7l c+

L

- JOHN D5 SICBER -

(412) 393-5255 1 s.nior vic. pr..,o.nt ena October 8, 1993 ran (412) c43-soes -

t N

- CNef Nuclear Officer -

f n.[-

. Nucker Power Divtsion '

N^

U..25.' Nuclear.. Regulatory Commission l

s (Attn:. Document Control Desk LUashington,,DC: -20555 t

[

q" i

Subject:

1 Beaver Valley Power. Station, Unit No. 1.and No.- 2

<BV-1 Docket-No. 50-334, License No. DPR-66 P

- BV-2 ^ Docket No. 50--412, License No. NPF-73 i

G.

Change Request ~Nos. 210 and 65-l g

Fuel Assembly. Reconstitution i

h,

_ This letter 'is lprovided to document the results of a discussion

{

between 'the-NRC : Project.' Manager and' a member ~ of our staff on October 0 7,

1993,'- 'concerning.. Technical Specification Change Request

[No. j210: :and~-65, provided 'by our letter dated June 11, 1993.

The

! Technical l Specification Change ' Request was developed to. incorporate sp, lthe snew? -Standard

. Technical Specification'--wording-provided.in-

~

4 NUREG-1431; -however,_. based-on the:above-discussion, the current NRC pos'ition' :on Ltheiewording. for-thisL Technical' Specification has 5 changed..

The change) involves replacing the proposed words " zirconium

alloy"3 with - "zircaloy. clad"iin the'second. sentence of Section 5.3.1.

1Both Beaver:, Valley, units are : currently; using the-zirconium alloy E

izircaloy-4' -as~

the clad material ~.

This is supported by the current ifuel? descr.iption -c.ontained in 'each Unit's Technical Specification

. 5. 3.1..:

This.. terminology :.is consistent.with the intent of the originez submittal, therefore,-incorporating this modification is acceptable.

R 7If _you have'any-questions regarding the attached response, please

[

mcontactiG.-S. Sovick at (412)"393-5211.

4

.RM Sincerely, t

k ;n'

1 g

^

JF D.

Sieber O'

~l "c'

cc:ldMr.)IS.WLRossbach,: Sr. Resident Inspector -

Mr.-TD T.JMartin,-NRC Region'I Administrator'

' ?MrbfG.LE. Edison, Sr. Project Manager

'Mr.)W.cP.!Dornsife,' Director ~BRP/ DER' e

IMr;JR. J. Barkanic, BRP/ DER:

g {/. -

ELECTRK

='

UTluTYof i

4 f

AD cn9310200155; m y]g THE YEAS j

93100si i 0 g';

kW.

L

_