ML20058N654
| ML20058N654 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 12/10/1993 |
| From: | Maynard O WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| WO-93-0190, WO-93-190, NUDOCS 9312220195 | |
| Download: ML20058N654 (7) | |
Text
._
I J
~
W$LF CREEK 1
NUCLEAR OPERATING CORPORATION Otto L. Maynard Vece President Plant Orerations WO 93-0190 j
U.
S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, D.
C.
20555
Subject:
Docket No. 50-482:
Special Report 93-003 Gentlemen:
The attached Special Report is being submitted in accordance with Technical
]
Specification 4.4.5.5.b concerning the results of Wolf Creek Generating 1
Station's fifth steam generator tube inservice inspection.
)
Very truly yours, l
~?
WW Otto L. Maynard Vice President Plant Operations OLM/jra Attachment I
cc:
J.
L. Milhoan (NRC), w/a j
G. A.
Pick (NRC), w/a W.
D.
Reckley (NRC), w/a I
L. A.
Yandell (NRC), w/a 17nn o
i
.J i
PO Box 411/ Buthngton, KS M339 / Phone. (316) 364-8831 9312220195 931210 An Ewal oppmunny EnWyu M MerVET PDR ADOCK 05000482 P
/[/
4
- Attachment to WO 93-0190 Page 1 of 6 SPECIAL REPORT 93-003 FIFTH STEAM GENERATOR TUBE INSPECTION RESULTS This report is being submitted pursuant to Technical Specification 4.4.5.5.b and 6.9.2 to report the results of the fifth steam generator tube inservice inspection.
The fifth-steam generator tube inservice inspection was completed by Westinghouse Electric Corporation on March 31,
- 1993, during the ' sixth refueling outage.
A total of 5623 tubes were inspected and a total of nine tubes were plugged in steam generator "B"
as discussed-in Special Report 93-002, which was transmitted by letter WO 93-0072 dated April 7, 1993. ' Included in this inspection effort were tubes which had been previously identified as having indications requiring re-inspection during this inservice inspection effort.
The inspection results, which includes the location and percent of-wall-thickness penetration for each indication of.an imperfection,'are listed in Section 3 of this report.
During the preparation of this report, discrepancier were discovered in Special Reports90-003 (Letter NO 91-0111, dated April 3,
1991) and 91-007 (Letter NO 92-0130, dated May 29, 1992) which do unented the results of Wolf Creek's third and fourth. steam generator t _th e _ inservice inspections.
Specifically, only the location and percent of w Gl-thickness of indications which - were greater than or equal to 20 percent of the nominal tube wall thickness were reported.
This is contrary to the requirement to include the location and percent of wall-thickness penetratio.1. for, all indications of
' imperfections.
Through discussions with Mr. Willi'm D.
Reckley, NRC Project a
Manager, it was decided that Special Reports90-003 and 91-007 would not be revised at this time.
NRC Bulletin 89-01, " Failure of Westinghouse Steam Generato r Tube Mechanical Plugs," with supplements, requires that mechanical tube plugs manufactured from Inconel 600 with certain heat numbers be removed prior to the expiration of their predicted time to fail.
As a conservative ' measure,.. all of the Inconel 600 mechanical tube plugs were removed from steam generator "B" during this inspection.
In addition, all Inconel 600 mechanical tube plugs are planned to be removed from steam generator "D"
during ; the seventh refueling outage scheduled for Fall, 1994.
Three Inconel 600 mechanical tube plugs (1 hot leg and 2 cold leg) were removed from two tubes in steam generator "B*.
All of the tubes were replugged.
All newly installed mechanical plugs were -manufactured from Inconel 690.
A total of seventeen plugs were installed in steam generator "B".
Ten plugs--
were installed based on eddy current findings, three plugs were installed.as'a.
result of plug removal, and four f actory installed 26" stub tube plugs-were mechanically plugged.
1.
Number and Extent of Tubes Inspected:
A.
Steam Generator "B"r A total of 5623 tubes were inspected full length.
l.
' Attachment to WO 93-0190' Page 2 of 6 i
Identification of Tubes Plugged:
2.
- Row Column Leg A.
Steam Generator "B":
l Replugged after plug removal
- 54 59 H
i 54 59-C 2
114 C
i i
New pluggable indications 54 59 l
56 59-j 53 61 l
47 99
-l 45 101 44 102 l
l
- 3. Location and Percent of Wall' Thickness Penetration for Each Indication of an Imperfection (Note:
Multiple listings of the same tube are the result-of more than one indication in that tube).
I Key For Indication' Lists
- H, #C
(# = number) of Support Plate Hot: Leg or Cold Leg Side l
AV#
Anti-Vibration Bar (# = number)
P Tube. Plugged, following % of Wall Thickness Loss Indication
% of Wall Thickness Loss Inch (+)
Distance Measured - f rom reference j
from point Uur Bar, Baffle Plate' Tube j
Location Support Plate, etc.)
Tube Indications In Steam Generator "B" Indication Inch. (+)
t Row Column Location / Leo
(% of Wall Thickness)
From Location t
2 1
TSC 14 12.01 27 8
AV1 19 0.00 30 10 AV5 19 0.00 1
12 1C 11 30.69 33 12 AV5 18 0.00 45 22 AV5 17 0.00 i
45 22 AV6 21-0.00 46 25 AV3 19
'O.03 f
46 25 AV4 25 0.00
?
E 46
'25 AV5 23 0.00 48 28 AV4 28-0.00' 48 28 AVS 27 0.00 i
49 28 AV5 30 0.00 f
40 30 6C 14 36.81 22 32 BPH 24 1.55 51 34 AV2 18 0.00 51 34 AV3 18 0.00 l
i
Attachment to NO 93-0190 Page 3 of 6 i
l b
Tube Indications In Steam Generator "B" (continued) -
'j
?
s Indication Inch (+)
E2w Column Location / Leo M of Wall Thickness)
From Lccation
't 1
51 34 AV4 22 0.00 51 34 AV5 23 0.00 48 35 AV3 34 0.00 1
48 35 AV4 25 0.00 53 35
-AV5 21 0.00 19 36 1H 15 18.97 50 37 AV4-22 0.00 i
48 3B AV3 15 0.00 1
48 38 AV4 14 0.00 48 38 AV5 19' O.00 g
50 39 AV2 10
-0.00 50 39 AV3 16 0.00 50 39 AV4 15 0.00 25 40 SH 12 20.87
~i 42 44 AV3 26 0.00 42 44 AV4 24 0.00 l
42 44 AV6 19 0.03 52 44 AV4 25 0.00 j
49 45 AV2 15 0 00 j
49 45 AV5 16
.0.06 49 45 AV6 18 0.00 44 46 AV4 18 0.00 44 46 AV5 12 0.00 50 47 AV2 26 0.00 f
50 47 AV3 18 0.00 30 49 AV2 17 0.00
-j 30 49 AV5 22 0.00 30-49 AV6 19 0.00 l
50 50 AV2 17 0.00 50' 50 AV3 21 0 00 50 50 AV4 30 0.00 50' 50 AV5 35 0.00 23 51 TSC 13
- 3.27 -
f 50 51 AV5 25 0.00-45 52 AV2 24
.0.00 45 52 AV4 19
.0.00 44 53 AV2 16 0.00 46 53 AV3 17 0.00'
.f 47 53 AV3 IB 0.00 49
.53 AV5 19 0.00
-1 59 53 7H 11
-0.69
.42 54 AV5 16 0.00 45 54 AV3 24 0.00
.j 45 54 AV4 19 0.00
']
51 54 AV4 18 0.00 42 55 6H 19 25.94 43 55 AV2 12 0.00 r
-w 1
e
-~
l Attachment to WO 93-0190 Page 4 of 6 Tube Indications In Steam Generator "B" (continued)
Indication Inch (+)
Rcw Column Location / Lea Pr of Wall Thickness)
From Location 54 55 AV2 30 0.00 54 55 AV3 19 0.00 54 55 AV5 35 0.00 54 56 AV2 25 0.00 48 57 AV4 15 0.00 48 57 AV6 10 0.00 59 57 6H 19 15.16 50 58 AV2 34 0.00 53 58 AV3 21 0.00 53 58 AV4 22 0.00 53 58 AV5 27 0.00 56 58 AV4 30 0.00 56 58 AV5 27 0.00 50 59 AV2 21 0.00 54 59 AV1 37 0.00 54 59 AV2 21 0.00 54 59 AV3 36 0.00 54 59 AV4 35 0.00 54 59 AV5 41P 0.00 54 59 AV6 29 0.00 56 59 AV2 23 0.00 56 59 AV3 24 0.00 56 59 AV4 41P 0.00 56 59 AV5 26 0.00 56 59 AV6 29 0.00 40 60 AV3 14 0.00 46 60 AV5 19 0.00 48 60 AV4 16 0.00 48 60 AV5 20 0.00 46 El AV3 13 0.00 46 61 AV4 14 0.00 46 61 AV6 16 0.00 48 61 AV5 16 0.00 50 61 AV3 17 0.00 53 61 AV1 24 0.00 53 61 AV3 49P 0.00 53 61 AV4 50P 0.00 53 61 AV5 28 0 00 40 62 AV5 18 0.00 42 62 AV5 24 0.00 46 62 AV3 21 0.00 46 62 AV6 22 0.00 45 63 AV6 18 0.00 20 64 6H 16 35.00 50 65 AV2 13 0.00 16 67 AV6 10 15.07 14 68 5H 20 10.88
~
-Attachment to WO 93-0190 Page'5 of 6 l
'i a
i Tube Indications In Steam Generator "B"
r (continued) z Indication Inch (+)
Egg Column Location / Leo
(% of Wall Thickness)
From Location 50 69 AV3 17 0.00 40 72 AV5 18 0.00
.l 46 73 AV5 28 0.00 50 73 AV2 17 0'.00
-l 50 73 AV4 17 0.00 50 73 AV5 28 0.00 50 73 AV6 13 0.00 j
45 74 AV5 12 0.00 1
77 1C 22 36.10 l
10 78 2C 20 18.53 44 79 AV5 18 0.00 ll 44 79 AV6 21 0.00 40 81 AV2 26 0.00 40 81 AV3 24 0.00
[
47' 81 AV4 18 0.00 i
51 85 AV4 20 0.00
-j 44 87 AV5 17 0.00 g
16 93 6H 11 22.86 36 96' 6H 18 29.97 36 96 6H 16 8.74 47 96 AV4 25 0.00
=
S 47' 96 AV5 17 0.00 47 96 AV6 15 0.00 40 97 7C 17
-0.54
[
47 97 AV5
- 27 0.00 46 98 AV5 24 0.00-47 99 AV4 19 0.00 f
47 98 AV5 35 0.00 j
47 98 AV6 17 0.12 48 98 AV5 25 0.00 48 98 AV6 26 0.00 j
47 99 AV4 40P 0.00
-i 47' 99 AV5 18 0.00 l
47 99 AV6 36 0.00 44 100 AV6 29 0.00 l
42 101 AV5 17 0.00 43 101 AV6 18 0.00 44 101
-AV4 18 0.00~
5 44 101 AV5 21 0.00 45 101
~AV4 27 0.00-l 45 101 AV5' 48P 0.00 45 101 AV6 23 0.00 44 102 AV4 34 0.00 44 102 AV6 45P 0.00 l
42 103 AV5 12 0.00 43 103 AV5 11 0.00 i
41 104 AV6 24
' O.00 3B 105 AV3 18 0.00 i
f
+
,w
Attachment to;WO 93-0190 Page 6 of 6 i
P f
Tube Indications In Steam Generator "B" t
(continued)
Indication Inch (+)
Row Column Location / Leo
(% of Wall Thi'*kness).
From Location i
38 105 AV6 15 0.00 39 105 AV6 15 0.00 28 113 AV5 13 0.00 6
115 BPC 21 1,57 7
122 2H 19 13.83 l
i i
i s
1
.l j
k i
i
+
s 4
~
-