UNITED STATES

(/.

g NUCLEAR REGULATORY COMMISSION i

i.

7.

p WASHINGTON, D. C. 20655 l

\\,..... /

r POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO Ft.CILITY OPERATING LICENSE Amendment No.164 License No. DIR-59 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Power Authority of the State ofNewYork(thelicensee)datedDecember 15, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; i

B.

The facility will operate in conformity with the application, the provisions of tie Act, and the rules and regulations of the Comission; C.

Thereisreasonableassurance(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health J

and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this emendment will not be inimical to the comon 4

defense and security or to the health and safety of the public; and i

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements l

i have been satisfied, i

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

i l

P I

J

2-(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.164, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance to be implemented within 30 days.

FOR THE NUCl. EAR RECUtATORY COMMISSION

~F'dd O' W Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

August 10,.1990 I

{

i l

1 1

l l

l

ATTACHMENT TO LICENSE' AMENDMENT NO.164 FACILITY OPERATING LICENSE NO. OPR-59 DOCKET NO. 50-333

.c 4

- P,evise Appendix A as follows:

Pemove Pages Insert Pages 218 218 L

224 224 244C 744C

)

-t r

1

.l

'l i'l l<

1

t.

JAFNPP 3S Continued

=

-4S Continued 6.

Once within one hour and at least once per eight hours

~

thereafter, whde the - reactor is bemg operated in ;

accordance with. Spec,iGcnic(6. 3.9B.1, 3S2.3. and 3.9.8.4, the avadabdsty of off-site power shad be assured by'.

verifymg correct breaker alignment and by venfyng that -

the associated off-site electrical line is energued.

C.

Diesel Fuel C.

Diesel Fuel There will be a mamum of 64,000 gal. of diesel fuel on site for Once a month-the quantity of diesel fuel available in each each operable pair of diesel generators.

storage tank shall be manually measured and compared to the -

readog of the. local level indicators to ensure the proper.

~

c; operation thereof.

~

i 1.

From and after the time that fuel oil storage tank level 1.

Once a month a sample of the diesel fuelin each storage instrumentation is made or found to be inoperable for any tank shall be checked for quality as per the followng-reason continued reactor. operation _ is permissible indefinitely, provided that the level in the affected storage pyg pg;g.F 1Me Pour Point *F 10'F max.

tank is manually measured at least once/ day.

Water & Sedsment 0.05% max.

i Ash 0.01% max.

Distillation 90% Pomt 540 min.

Viscosity (SSU) at 100"F 40 max.

Sulfur 1% max.

j Copper Strip Corrosson No.3 max.

i Cetane #

35 min.

i i

i Amendment No.M,pff, jd164

.218 i

n

-c.

.+n s-.

.s m-...--.

.-,~-y

- - r

.y

- m -e-Yn ~ b,e <.

,~

4

~ ~.

- 7 JAFNPP g.

3.9 BASES (cont'd)

C.

Diesei Fuel D.

Battery System 1

Pows b W #en two pant MW M M Minimum on-site fuel oil requirements are based on operation of the emergency diesel generator systems at rated load for 7 to Wy tM r@M W at W m %.

%s.

loss-of-coolant accident with a concurrent loss of normal and reserve power. Each battery is provided with a charger sized Additional diesel fuel can be delivered to the' site within 48 to maintain the battery in a fully charged state while supplyeng hours.

normal operating loads.

If one of the Emergency Diesel Generator Systems is not E.

LPCI MOV Independent Power Supplees operable, the. plant shall be permitted to run for 7 days m

m ces msave poww we opeah Ws eseWW Wfr@W h W M

~

consistirig of a charger, rectifier, inverter and battery. Each i

mdependent power supply charger-rectifier is normally fed from 1.

The operable Emergency Diesel Generator System is tN emagency AC poww W sp 6 m m.

c@ of carrying sufficient engmeered safeguards and battery in a fully charged state. In the event of a LOCA each gency systan @pment to cma M independent power supply is automatically isolated from the Emergency A-C power system. The battery and inverter have gg

~

sufficient capacity to power the - MOV's essential : to the 2.

The reserve (offsite) power is highly reliable.

operation of the LPCI System. A mantenance power source is provided for each LPCI MOV bus whereby in the event its mdependent power supply is out of em, the LPCI MOV bus may be energized directly from'the Emergency A-C Power System.

i Amendment No. pd 164 224

=,

T

~

'AFNPP J

. A.

High Pressure Waster' Fire Protection System (Cont'd) we Wata Re MMMWe M4

=

3.

if 1. above cannot be fulfilled, place the reactor in Hot Itan Rw

~

Standby within six (6) hours and in Cold Shutdown within

~

the following thirty (30) hours.

h.

Fire pump dieselengme Once/ Month by verifying the fuel storage tank contains at least 172 gallons of fuel.

i.

Diesel fuel from each Once/Ouarter tank obtamedin accordance with ASTM-D270-65 is wnho the acceptable temsts for quality as per the following:

Rash Point *F 1257 min.

Pour Point - T 10"F max. -

1 Water & Sediment 0.05% max.

l Ash 0.01% max.

l Distillation 90% Point 540 min.

Viscosity (SSU) @ 100"F 40 max.

Sulfur

' 1% max.

Copper Strip Corrosson No.3 max.

Cetane #

35 min.

j.

Fire pump dieselengne Once/18 months byinspechon dunng shut downin accordance with procedures preparedin conjunction with manufacturers recommendahons and venfying the diesel, starts from ambient co6ditin6 on the auto start segnal and operates for >20 mmutes while loaded with tt.e fire pump.

Amendment No. p( 164 244c