Text
s
P.O. Box 300 A+
Od seabrook. Ns o3874 Telephone (603)474-9521 Facsimile (603)474 2987 Energy Service Corporation
.Ted C. Feigenbaum Senior Vice President and Chief NuclearOfficer NYN. 93159 November 18,1993 United States Nuclear Regulatory Commission Washington, D.C. 20555 Attention:
Mr. Albert W. De Agazio
References:
(a)
Facility Operating License No. NPF-86, Docket No. 50-443 (b)
Letter dated July 7,1993 from Albert W. De Agazio (USNRC) to Ted C.
6 Feigenbaum (North Atlantic) regarding the replacement of the Wellesley reception center i
(c)
Letter dated August 13,1993 from Ted C. Feigenbaum to Alben W. De Agazio-regarding the status of the replacement of the Wellesley Reception Center
Subject:
Monthly Report on Status of the Replacement of the Wellesley Reception Center
Dear Mr. De Agazio:
In your letter of July 7,1993 [ Reference (b)] you requested that the North Atlantic Energy Service Corporation (North Atlantic) provide you with an initial repon and monthly updates on the status of efforts to replace the Massachusetts Highway Department's Wellesley facility as a reception center in the event of a radiological emergency at Seabrook Station. North Atlantic provided its initial report on August 13,1993 [ Reference (c)]. This letter is the third monthly update of the status of the replacement efforts.
Plan and procedure revisions have been identified and wordprocessing is in progress. Revised.
plans and procedures will be available for training by December 3,1993. Equipment and supplies have l
been ordered. Materials will be on hand by November 30,1993, and in place at the facility by December 3,1993.
The Massachusetts Emergency Management Agency (MEMA) has authorized the printing of 1994 j
public information material reflecting the new reception center location and directions. Printing will be completed in November,1993, with distribution to follow in December,1993.
A meeting was held on November 10,1993 with MEMA staff, North Atlantic representatives, and ~
local public safety officials from the communitics of L3 oxford, Topsfield, and Middleton, MA to further discuss staffing of the replacement facility. Two of the communities indicated their willingness to provide -
staff and have committed to have personnel identified and training started by January,1994. The j
remaining community is further evaluating its position on providing staffing, with a final decision expected by November 30,1993. Until local staff is trained and is ready to assume this role, the Beverly Civil l
l g member of the Northeast Utilities system 1
l 9312210362 931118 pDR ADOCK0500g3
{&
l United States Nuclear Regulatory Commission November 18,1993 Attention:
Mr. Albert W. De Aga7io Page two Defense Agency has agreed to staff the facility. The Beverly Civil Defense Agency Director indicated this group's willingness to staff the reception center in a letter to the MEMA Director dated November 12,1993. This is the same group that is currently staffing the Wellesley reception center until replacement facilities are operational. Training for Beverly personnel will take place in December,1993 with training dates to be established by November 24,1993.
North Atlantic continues to view the completion of activities by December 31,1993 as achievable.
Should you have any questions regarding the infonnation contained in this letter, or require additional information, please contact Mr. Anthony M. Callendrello at (603) 474-9521, extension 2751.
Very truly yours, Ted C. Feigenbau TCF:AMC/act cc:
Mr. Thomas T. Martin Mr. David Rodham Regional Administrator Director, MEMA U.S. Nuclear Regulatory Commission 400 Worcester Road Region I PO Box 1496 475 Allendale Road Framingham, MA 01701-0317 King of Prussia, PA 19406 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. Noel Dudley NRC Senior Resident Inspector P.O. Box 1149 Seabrook, Nil 03874 Mr. R. Keimig U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Mr. Robert A. Erickson Chief, Emergency Preparedness Branch U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 i
December 17, 1993 NOTE T0:
Document Control Desk
[
FROM:
Albert W. De Agazio
SUBJECT:
DOCUMENT FOR DOCKETING Please place the attached document into Docket 50-443, Seabrook Station, Unit 1.
1 i
I i
0.0.0003 goou in w