ML20058N191
| ML20058N191 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 09/22/1993 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Beckham J GEORGIA POWER CO. |
| Shared Package | |
| ML20058N194 | List: |
| References | |
| NUDOCS 9310080248 | |
| Download: ML20058N191 (3) | |
See also: IR 05000321/1993017
Text
y
.
.
.. ..
- - _ _ _ _ _ - _
_ _ - - - _ _ - - _ .__. ._
_ _ -
_ _ _ _ _ _ .
- -
. _ _ - - - - _ - .
_ . _ _ - - - _ _
p
'
,
,
.
.
.
SEP 2 21993
. Docket Nos. 50-321 and 50-366
Georgia Power Company
,
ATTH: Mr. J. T. Beckham, Jr.
Vice President. Plant Hatch
Nuclear Operations
P.O. Box 1295
Birmingham, AL 35201
Gentlemen:
-
SUBJECT: NRC INSPECTION REPORT NOS. 50-321/93-17 AND 50-366/93-17
j
This refers to the inspection conducted by L. Wert of this office on
August 8 - September 4, 1993. The inspection included a review of activities
authorized for your Hatch facility. At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
l
Within the scope of the inspection, violations or deviations were not
identified.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
IWfdf74 scu:0 3y
. ALAN Pu H.7. 3T
Alan R. Herdt, Chief
Reactor Projects Branch 3
Division of Reactor Projects
Enclosure:
NRC Inspection report
cc w/ enc 1:
See page 2
9310080248 930922
7
.\\
ADOCK 05000321
G
C
.rEDI
,
>
.
,
,
.
.
.
!
.
Georgia Power Company
2
g
cc w/ encl:
J. D. Woodard
Senior Vice President
,
Georgia Power Company
l
Nuclear Operations
P. O. Box 1295
Birmingham, AL 35201
H. L. Sumner
General Manager, Plant Hatch
Georgia Power Company
Route 1, Box 439
-
Baxley, GA 31513
S. J. Bethay
Manager Licensing - Hatch
l
Georgia Power Company
P. O. Box 1295
Birmingham, AL 35201
,
Ernest L. Blake, Esq.
!
Shaw, Pittman, Potts and
i
Trowbridge
i
2300 N Street, NW
Washington, D. C.
20037
Charles H. Badger
Office of Planning and Budget
-
Room 610
270 Washington Street, SW
Atlanta, GA 30334
-
Harold Reheis, Director
['
Department of Natural Resources
205 Butler Street, SE, Suite 1252
Atlanta, GA 30334
Thomas Hill, Manager
Radioactive Materials Program
Department of Natural Resources
t
4244 International Parkway
'
.c ite 114
u
Atlanta, GA 30354
Chairman
Appling County Commissioners
County Courthouse
i
Baxley, GA 31513
i
cc w/ encl: Continued page 3
-
'l
l
-
-
- -
- .
. -
-
-
-
=
9
-
.
-
.
SEP 2 21993
- Georgia Power Company
3
cc w/ encl: Continued
Dan H. Smith
Vice President
Power Supply Operations
Oglethorpe Power Corporation
2100 E. Exchange Place
Tucker, GA 30085-1349
Charles A. Patrizia, Esq.
Paul, Hastings, Janofsky & Walker
12th Floor
1050 Connecticut Avenue, NW
Washington, D. C.
20036
bcc w/ encl:
K. N. Jabbour, NRR
A. R. Herdt, RII
P. H. Skinner, RII
Document Control Desk
NRC Senior Resident Inspector
,
U.S. Nuclear Regulatory Commission
Route 1, Box 7?.5
Baxley, GA 31513
FILE:
G:\\DRP\\HT217RPT.DAS
RII:DRP
RII:D,RP
th'
'~ T].>T [
Q
D5eymour
PSk nner
09/.:21 / 9 3
09g/93