Monthly Operating Repts for Nov 1993 for Calvert Cliffs Nuclear Power Plant Units 1 & 2
ML20058N143
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/30/1993
From: Cruse C, Piazza F
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9312210266
Download: ML20058N143 (11)


Text

,

4 BALTIMORE GAS AND ELECTRIC CALVERT CLIFFS NUCLEAR POWER PLANT 4 1650 CALVERT CLIFFS PARKWAY

  • LUSBY, MARYLAND 20657-4702 CHARLES H. CRUSE PLANT GENERAL MANAGER CALVERT CLIFFS t

December 14,1993 4

U. S. Nuclear Regulatory Commission Washington,DC 20555

A'ITENTION
Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 November 1993 Operatinc Data Reports The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

Should you have any questions, please contact Mr. Bruce Mrowca at (410) 260-3989.

4 Very trulyyours, W

./i s ar' CHC/FP/bjd 4 l

Attachments cc: D. A. Brune, Esquire J. E. Silberg, Esquire ,

l R. A. Capra, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC l P. R. Wilson, NRC ,

R. I. McLean, DNR i J. H. Walter, PSC R. A.Hartfield,NRC P. Lewis,INPO K.Larson, ANI (n

b DObKb500 17 f/ / fi55.5N 2 h g

I UNIT 1 l OPERATING DATA REPORT )

                                                                                                                                                        • ]

Docket No. 50-317 l

[ December 14, 1993 Prepared by Frank Piazza Telephone:(410)260-3821 OPERATING STATUS j 1

1. UNIT NAME Calvert Cliffs Unit 1 l t 2. REPORTING PERIOD NOVEMBER 1993
3. LICENSED THERMAL POWER (MWT)- 2700
4. NAMEPLATE RATING (GROSS MWe) 918  ;
5. DESIGN ELECTRICAL RATING (NET MWe) 845  !
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 866 1
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830 )
8. CHANGE IN CAPACITY RATINGS NONE
9. POWER LEVEL TO WHICH RESTRICTED N/A
10. REASONS FOR RESTRICTIONS N/A i

Cumulative '

l This month Year-to-Date to Date

11. HOURS IN REPORTING PERIOD 720 8,016 162,757
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7,875.0 116,225.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 720.0 7,855.5 113,834.4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 j
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,915,497 21,049,875.288,328,726 l
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 637,640 6,983,628 95,811,162
18. NET ELECTRICAL ENERGY GENERATED (MWH) 611,876 6,699,101 91,168,487
19. UNIT SERVICE FACTOR 100.0 98.0 69.9
20. UNIT AVAILABILITY FACTOR 100.0 98.0 69.9
21. UNIT CAPACITY FACTOR (USING MDC NET) 102.4 100.9 67.9
22. UNIT CAPACITY FA2 TOR (USING DER NET) 100.6 98.9 66.3
23. UNIT FORCED OUIAGE RATE O.0 2.0 8.8
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

Refueling, February 4, 1994, 95 days i

25. IF SHUTDOWN AT END OF REPORT PERIOD,  ;

ESTIMATED DATE OF START-UP: l N/A

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-317 UNITNAME Calvert Cliffs-UI- -

DATE December 14.1993 COMPLETED BY Frank Piazza TELEPHONE (410) 260-3821 REPORT MONTil November 1993 METilOD OF SilUTHNG LICENSEE CAUSE & CORRECHVE DURATION DOWN EVENT SYSTEM COMPONENT ACHONTO NO. DA111 TYPEI (IlOURS) REASON 2 REACTOR 3 REPORT # CODE 4 CODE 5 PREVENT RECURRENCE 93-05 931118 F 0 A 5 N/A SJ RV Power was reduced on 11/18/93 at 2227 to approximately 77% reactor power to repair a failed relief valve # RV-1427 on 15A Feed Water Heater.

The relief valve spring broke causing the RV to lift.

. %c spring was replaced and the valve was 2

overhauled. A Root Cause Analysis is being conducted by the Metal Lab. to determine the cause of the spring failing. The Relief Valve will be replaced with a new model RV during the next Refueling Outage.

1. F: Forced - 2' Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled A- Equipment Failure 1 - Manual B - Maintenance or Test 2 - Manual Scram. -

i C- Refueling 3 - Automatic Scram. 5 IEEE Standard 803A-1983 D - Regulatory Restriction 4-Continued

, E. Operator Training & License Examination Reduced Imad F- Administrative 9 - Other G-Operational Error

. H - Other '

- j AVERAGE DAILY UNIT POWER LEVEL oco*********************************************************************

Docket No. 50-317 Calvert. Cliffs Unit No. l' ,

December 14, 1993 )

Prepared by Frank Piazza Telephone: (410) 260-3821 NOVEMBER 1993- l Average Daily Power Level Average Daily Power Level Day (MWe-Net) _ Day (MWe-Net)


. I 1 787 17 862 2 862 18 858 3 861 19 659 4 858 20 787'  :,

l 5 834 21 858 l 6 840 22 861 7 859 23 -860 8 859 24' 860-9 858 :25 861 .)

l 10 859 2 6 '- 861 l 4

11 860 27- 862 12 859 28 :862 13 861 29 863 14 861 30 863 15 862 l l

16 862  ;

-l i

i I

- .-- - . . . . - - , . ~_,

i l I

. 1

'I i

V T Ci.I - UNIT 1 ~

December 14,1993

SUMMARY

OFOPERATING EXPERIENCE i i

November 1993 - i The unit began the month at 100% reactor power and 860 MWe.

Power was reduced slightly (97%) on 1 N493 at 2200 for Moderator Temperature Coefficient '. .

testing. The Unit was returned to 100% on 11/6N3 at 2000 after successful completion of the testing. j

( On 11/18S3 at 2227 power was again reduced to 77% reactor power to repair a failed R.elief Valve ]j (RV-1427) on 15A Feedwater Heater. The valve was overhauled and the unit was returned to 100% .

power on 11/20B3 at 1115. i i

The unit remained at 100% power and 860 MWe for the remainder of the month. - l l

l l

l l ,

l 1

l l

l t .

l

  • December 7, 1993 NFM 93-500 Page 2 of 4 REFUELING INFORMATION REQUEST f ,
1. Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No.1.
2. Scheduled date for next refueling shutdown: February 4, 1994.
3. Scheduled date for restart following refueling: May 9, 1994. l r
4. Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Operation after refueling will require either " Core Operating Limits: l Report" or will-require a change to Technical Specification 3/4.2.2, '

" Linear Heat Rate". i

5. Scheduled date(s) for submitting proposed licensing action and-supporting information.

Submitted September 1993 for Core Operating Limits Report.

6. Important licensing considerations associated with the refueling. ,

None identified at this time.

7. The number of fuel assemblies (a) in the core and-(b)' in the spent fuel storage pool.

(a) 217. (b) 1474. (Note 2)

Spent fuel pools are common to Units 1 and 2.  ;

1

8. (a) The present licensed spent fuel pool storage capacity, and. (b) the i size of any increase in licensed storage capacity that has been l requested or is planned, in number'of fuel assemblies.

(a) 4710. (NOTE 1) (b) O. l

9. The projected date of the last refueling that can be discharged to the ,

Spent Fuel Pool assuming the present licensed capacity and maintaining - I space for one full core off-load.

March 2014 1

NOTE 1: 4710 total licensed site storage capacity.

(1830 pool + 2880 Ispsi)

NOTE 2: 24 Spent Fuel Assemblies in the ISFSI.

1

                                                                                                                                                        • j UNIT 2 ,

OPERATING DATA REPORT  !

Docket No. 50-318 j December 14,11993  ;

Prepared by Frank Piazza l Telephone:(410)260-3821  ;

i OPERATING STATUS i t

1. UNIT NAME Calvert Cliffs Unit 2
2. REPORTING PERIOD NOVEMBER.1993  :
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) .911 3
5. DESIGN ELECTRICAL RATING (NET MWe) 845 }
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 866:  ;
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 830  ?
8. CHANGE IN CAPACITY RATINGS NONE f
9. POWER LEVEL TO WHICH RESTRICTED N/A i
10. REASONS FOR RESTRICTIONS N/A i i

Cumulative  !

This month Year-to-Date to Date l

____________________________________ t

11. HOURS IN REPORTING PERIOD 720 8,016 146,112 l
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 5,328.4 105,292.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6 ,
14. HOURS GENERATOR ON LINE 720.0- 5,197.8 '103,779.6~
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0;0 i
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,927,723 13,723,238 264,868,030 i
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) '647,728 4,525,145 87,483,923- 1
18. NET ELECTRICAL ENERGY GENERATED (MWH) 622,425 4,328,733-"83,597,162- I
19. UNIT SERVICE FACTOR 100.0' 64.8- .71.0 'I
20. UNIT AVAILABILITY FACTOR .

100.0 64.8 -71.0 l

21. UNIT CAPACITY FACTOR (USING MDC NET) 104.2. 65.2 69.3 1
22. UNIT CAPACITY FACTOR (USING DER NET) 102.3 63.9' 67.7
23. UNIT FORCED OUTAGE RATE 0.0 1.1 5.7
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):-

N/A

25. IF UNIT IS-SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

N/A i i

l l

i

UNIT SIlUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-318 UNITNAME Calvert Cliffs-U2

  • DATE Decemter 14.1993 COMPLETED BY Frank Piazza ,

TELEPIlONE (4101260-3821 REPORTMONTil November 1993 METIIOD OF SilUTHNO IJCENSEE CAUSE & CORRECTIVE DURATION DOWN EVENT SYSTEM COMPONENT ACHONTO NO. DATE TYPEI (IIOURS) REASON 2 REACIOR3 REPORT # CODE 4 CODE 5 PREVENT RECURRENCE

'Ihere were no significant power reductions this month.

1 F: Forced 2 Reason: 3 Method: 4 IEEE Standard 805-1984 S: Scheduled - A- Equipment Failure 1 - Manual B- Maintenance or Test 2 - Manual Scram.

C- Refueling 3- AutomaticScram. 5 IEEE Standard 803A-1983 D- Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Reduced Load F- Administrative 9 - Other

. G - Operational Error

~ H - Other m--- __ _ ____ _ ___ _ _ _ . . . _ . _ - .-_. _ _._ _ - . . _ - - -- _ _ . . _ . _ . - _

i i l

l i

l

. j l.

. i AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318

! Calvert Cliffs Unit No. 2 l' l December 14, 1993 l Prepared by Frank Piazza  :

i Telephone: (410) 260-3821  ;

i

( NO/ EMBER 1993 l

[ **************** -i l

I

! Average Daily Power Level . Average Daily Power Level.  !

Day (MWe-Net) Day (MWe-Net)  !

1 869 17 869 l <

2 870 18 869 f

3 869 19- 868

4 870 20 738 5 869 21 841 6 869 22 868 I 7 870 23 870 f i

8 869 24 872 ]

l 9 869 25 872 I i

10 870 26 872  ?

11 870 27 871

]

1 12 869 28 871 i 1

1 13 870 29 872 i 14 870 _30 -871 15 870 i 16 869 i

4 l  :

1 1

)

, l l \

i

[

^

-l o' ,. -j

~;

i .

! DOCKET NO. 50-318 - .

]

l CALVERTCLIFFS - UNIT 2 )

December 14,1993 j I

SUMMARY

OFOPERATING EXPERIENCE j November 1993 -)

1 The unit began the month at 100% (865 MWe) reactor power. -l

')

On 11/20S3 at 0307 the power was reduced to 685 MWe (approx. 80% reactor power) for condenser i water box cleaning, amertap repairs, replace several solenoid valves and implement a modification to l 26A feedwater relief valve. The power was restored on 11/21S3 at 1215 to.100% reactor power j l . .

l The unit ended the month at 100% reactor power and 870 MWe. '!

l

.:i i

1 i

I l

l; 1

l a

]

l 1

i .. l December 7, 1993 i NFM 93-500 Page 3 of 4

(

REFUELING INFORMATION REQUEST f

1

1. Name of facility: Calvert Cliffs Nuclear Power Plant Unit No. 2 ;
2. Scheduled date for next refueling shutdown: Narch 3, 1995.
3. Scheduled date. for resta.rt following refueling: Nay 17, 1995.

l

4. Will refueling or. resumption of operation thereafter require a Technical l Specification change or other license amendment?  ;

Unknown. 0 1!

5. Scheduled date(s) for submitting proposed licensing action.and  :

supporting information. .

Unknown.  ;

6. Important licensing considerations associated with the refueling.

None identified at this time.

, 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel l l storage pool.  !

l l

(a) 217. (b) 1474. (Note 2).

r Spent fuel pools are common to Units 1. and 2.

! 8. (a) The present licensed i ent fuel pool storage capacit'y, and J(b) the 1 l

size of any increase in l A nsed storage. capacity that has been  ;

l requested or is planned, in number of fuel assemblies. i (a) 4710 (NOTE 1) (b) O. '

l L. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining-

~

space for one full core off-load.

March 2016.

l NOTE 1:' 4710 total licensed site storage capacity.-

(1830 pool + 2880 ]srSI)

NOTE 2: 24 Spent Fuel Assemblies in the ISFSI.