Text
1
.
1. ' -
35
,
,
6
DEC 141993
Docket .Nos. 50-334
50-412
Mr. J. D. Sieber
Senior Vice President
Nuclear Power Division
Duquesne Light Company
Post Office Box 4
Shippingport, Pennsylvania 15077
Dear Mr. Sieber:
SUIUECT:
NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS.50-334/93-26
AND 50-412/93-28)
This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of
this office from October 26 to November 27,1993. The inspection included a review of
activities authorized for the Beaver Valley Power Station in Shippingport, Pennsylvania. At
the conclusion of the inspection, the findings were discussed with Messers. D. Spoerry,
'
G. Thomas, and other members of your staff.
Areas examined during the inspection are identified in the report. The inspection consisted
of document reviews, interviews, and observation of activities important to public health and
safety. The purpose of the inspection was to determine whether activities authorized by the
license were conducted safely and in accordance with NRC requirements.
Based on the results of this inspection, certain of your activities appeared to be in violation
of NRC reqairements, as specified in the enclosed Notice of Violation (Notice). The first
violation involves multiple examples of procedure violations by operators. All but one cf
these examples were self-identified by your staff, and taken individual'.y, each is of minor
safety significance. Nevertheless, this violation is being cited because the presence of
multiple examples and previous cittd and non-cited procedural violations indicates the need
for additional corrective actions. The second violation involves the failure of an instrument
due to inadequate installation specifications. This is of concern because your design controls
should ensure that qualification test conditions are properly translated into installation
specifications.
Also, a non-cited violation was identified for not developing several alarm response
procedures. This violation is not being cited because of its minor safety significance and
your corrective actions.
,
2000GG
9312210106 931214
ADOCK 05000334:
O
,
FICI__E ECO1M Copy
V[
io
c
. ----
.-
-
.--.
.
DEC 141993
Mr. J. D. Sieber
2
,
.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. In your response, you should document the
specific actions taken and any additional actions you plan to prevent recurrence. After
reviewing your response to this Notice, including your proposed corrective actions and the
results of future inspections, the NRC will determine whether further NRC enforcement
action is necessary to ensure compliance with NRC regulatory requirements.
i.2 accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and
l
its enclosures will be placed in the NRC Public Document Room. A copy of the audio
'
tapes of the November 19,1993 open Enforcement Conference will be placed in the Public
Document Room.
The responses directed by this letter and the enclosed Notice are not subject to the clearance
procedures of the Office of Management and Budget as required by the Paperwork Reduction
Act of 1980, Pub. L. No. 96.511.
Your cooperation with us is appreciated.
Sincerely,
Ogmal dign8d By:
James C. UMille
James C. Linville, Chief
Projects Branch No. 3
Division of Reactor Projects
[
Enclosures:
1.
'
2.
NRC Inspection Report Nos. 50-334/93-26 and 50-412/93-28
3.
Attachment A, Enforcement Conference Attendec List
4.
Attachment B, Enforcement Conference Slides
,
cc w/encis:
G. S. Thomas, Vice President, Nuclear Services
D. E. Spoerry, Vice President, Nuclear Operations
L. R. Freeland, General Manager, Nuclear Operations Unit
K. D. Grada, Manager, Quality Services Unit
N. R. Tonet, Manager, Nuclear Safety Department
H. R. Caldwell, General Superintendent, Nuclear Operations
K. Abraham, PAO (2 copies)
Public Document Room (PDR)
,
Imcal Public Document Room (LPDR)
-
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
State of Ohio
OFFICIAL RECORD COPY
p
-.
-
.
,
...
!
,o
Mr. J. D. Sicher
3
bec w/encls:
Region I Docket Room (with concurrences)
W.12zarus, DRP
D. Lew, DRP
l
M. Oprendek, DRP
bec w/encls (VIA FAIAIL):
f
!
W. Butler, NRR
G. Edison, NRR
-
W. Dean, OEDO
i
i
i
!
i
!
i
!
!
.i
i
,
,
!
.
!
Rl;DRP
RI:DF P
RI:D RP
'
is
Linville
LRossbach
7ar
[7 (%)hp
12/01/93
/z
3
OFFICIAL RECORD COPY
A:BV932628.MEO
j
!
,
i
T
E
%
.
.
=
--