Forwards Insp Repts 50-334/93-26 & 50-412/93-28 on 931026-1127.Violations Noted
ML20058M783
Person / Time
Site: Beaver Valley
Issue date: 12/14/1993
From: Linville J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Sieber J
DUQUESNE LIGHT CO.
Shared Package
ML20058M787 List:
References
NUDOCS 9312210106
Download: ML20058M783 (3)


See also: IR 05000334/1993026

Text

1

.

1. ' -

35

,

,

6

DEC 141993

Docket .Nos. 50-334

50-412

Mr. J. D. Sieber

Senior Vice President

Nuclear Power Division

Duquesne Light Company

Post Office Box 4

Shippingport, Pennsylvania 15077

Dear Mr. Sieber:

SUIUECT:

NOTICE OF VIOLATION (NRC INSPECTION REPORT NOS.50-334/93-26

AND 50-412/93-28)

This refers to the inspection conducted by Messrs. L. Rossbach, P. Sena, and S. Greenlee of

this office from October 26 to November 27,1993. The inspection included a review of

activities authorized for the Beaver Valley Power Station in Shippingport, Pennsylvania. At

the conclusion of the inspection, the findings were discussed with Messers. D. Spoerry,

'

G. Thomas, and other members of your staff.

Areas examined during the inspection are identified in the report. The inspection consisted

of document reviews, interviews, and observation of activities important to public health and

safety. The purpose of the inspection was to determine whether activities authorized by the

license were conducted safely and in accordance with NRC requirements.

Based on the results of this inspection, certain of your activities appeared to be in violation

of NRC reqairements, as specified in the enclosed Notice of Violation (Notice). The first

violation involves multiple examples of procedure violations by operators. All but one cf

these examples were self-identified by your staff, and taken individual'.y, each is of minor

safety significance. Nevertheless, this violation is being cited because the presence of

multiple examples and previous cittd and non-cited procedural violations indicates the need

for additional corrective actions. The second violation involves the failure of an instrument

due to inadequate installation specifications. This is of concern because your design controls

should ensure that qualification test conditions are properly translated into installation

specifications.

Also, a non-cited violation was identified for not developing several alarm response

procedures. This violation is not being cited because of its minor safety significance and

your corrective actions.

,

2000GG

9312210106 931214

PDR

ADOCK 05000334:

O

PDR

,

FICI__E ECO1M Copy

V[

io

c

. ----

.-

-

.--.

.

DEC 141993

Mr. J. D. Sieber

2

,

.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. In your response, you should document the

specific actions taken and any additional actions you plan to prevent recurrence. After

reviewing your response to this Notice, including your proposed corrective actions and the

results of future inspections, the NRC will determine whether further NRC enforcement

action is necessary to ensure compliance with NRC regulatory requirements.

i.2 accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and

l

its enclosures will be placed in the NRC Public Document Room. A copy of the audio

'

tapes of the November 19,1993 open Enforcement Conference will be placed in the Public

Document Room.

The responses directed by this letter and the enclosed Notice are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork Reduction

Act of 1980, Pub. L. No. 96.511.

Your cooperation with us is appreciated.

Sincerely,

Ogmal dign8d By:

James C. UMille

James C. Linville, Chief

Projects Branch No. 3

Division of Reactor Projects

[

Enclosures:

1.

Notice of Violation

'

2.

NRC Inspection Report Nos. 50-334/93-26 and 50-412/93-28

3.

Attachment A, Enforcement Conference Attendec List

4.

Attachment B, Enforcement Conference Slides

,

cc w/encis:

G. S. Thomas, Vice President, Nuclear Services

D. E. Spoerry, Vice President, Nuclear Operations

L. R. Freeland, General Manager, Nuclear Operations Unit

K. D. Grada, Manager, Quality Services Unit

N. R. Tonet, Manager, Nuclear Safety Department

H. R. Caldwell, General Superintendent, Nuclear Operations

K. Abraham, PAO (2 copies)

Public Document Room (PDR)

,

Imcal Public Document Room (LPDR)

-

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

State of Ohio

OFFICIAL RECORD COPY

p

-.

-

.

,

...

!

,o

Mr. J. D. Sicher

3

bec w/encls:

Region I Docket Room (with concurrences)

W.12zarus, DRP

D. Lew, DRP

l

M. Oprendek, DRP

bec w/encls (VIA FAIAIL):

f

!

W. Butler, NRR

G. Edison, NRR

-

W. Dean, OEDO

i

i

i

!

i

!

i

!

!

.i

i

,

,

!

.

!

Rl;DRP

RI:DF P

RI:D RP

'

is

Linville

LRossbach

7ar

[7 (%)hp

12/01/93

/z

3

OFFICIAL RECORD COPY

A:BV932628.MEO

j

!

,

i

T

E

%

.

.

=

--