Monthly Operating Rept for Nov 1993 for Wolf Creek Generating Station
ML20058M580
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 11/30/1993
From: Maynard O, Mike Williams
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
WO-93-0212, WO-93-212, NUDOCS 9312210033
Download: ML20058M580 (7)


Text

6 m

+

e 4

LF CREEK W@) NUCLEAR OPERATING

~

Otto L Maynard Vice Premdent Plant 0;erations December 10, 1993 WO 93-0212 U.

S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Station F1-137 Washington, D.

C.

20b55

Subject:

Docket No. 50-482:

November, 1993, Monthly Operating Report Gentlemen:

Attached is the November, 1993, Monthly Operating Report for Wolf Creek Generating Station. This submittal is being made in accordance with the requirements of Technical Specification 6.9.1.8.

Very truly yours,

/'/

i

} '.,),,f j' g

Otto.L. Maynard Vice President Plant Operations OLM/jan Attachment cc:

J.

L. Milhoan (NRC), w/a G. A.

Pick (NRC), w/a W.

D.

Reckley (NRC), w/a L. A.

Yandell (NRC), w/a 1

)

i c.1.. n. [ r C

e Box 411/ 8 rkngton. KS 66839 / Phone. (316.1364-8831 An Equ o Opportunity Employer M. F/HC/ VET III

4, 4 to NO 93-0212

.t NOLF CREEK NUCLEAR OPERATIIG CORPORATION-NOLF CREEK GENERATIIG STATION NOTI 111LY OPERATIIG RITORT MOtTIH:

November YEAR:

1993 Docket Ib. : 50-482 Facility Operating License No.: NPF-42 Report Ib.105

.t 1

2 i

1

Att$chment1toWO93-0212

SUMMARY

The following report highlights the operating experience of Wolf Creek Generating Station for the month of November, 1993. This report is being provided pursuant to Technical Specification 6.9.1.8.

I.

SUMMARY

OF OPERAT11G EXPERIDCE On November 18, 1993, the unit was placed at 95% power in preparation for.a power rerate frun 3411 IW(t) to 3565 N(t). On Novanber 20, 1993, maximum rated thernal power was changed to 3565 m(t). The unit was placed at 97%

power after power rerate for the duration of the month, as a result of turbine nozzle inlet restrictions.

II.

MAJOR SAFFJIY RELATED PAINI'ENANCE ACI'IVITIES No major safety related maintenance activities were perforned during the nonth of November.

l l

wb1f Creek Generating Station Monthly Operating Report Novmber 1993 Page 1 of 5_

]

.j i

. to NO 93-0212 OPERATIl0 DATA REPOITT DOCKEf NO.

50-482 NOLF CREEK GENERATItG STATION-NOLF CREEK NUCLEAR OPERATIl0 CORPORATION-DATE 12-01-93 CmPIEfED BY M. Williams TELEPHONE 316-364-8831

)

OPERATIIG STA'IUS 1

1 1.

Reporting Period:

November, 1993 Gross Hours in Reporting Period: 720 l

2.

Currently Authorized Power Level (MWt): 3565 Max. Depend. Capacity (MWe-Net): 1134 j

l Design Electrical Rating (MWe-Net):

1170 J

3.

Power level to Which Restricted (If Any)(MWe-Net):

N/A

]

i 4..

Reasons for restriction (If Any):

N/A i

This Month Yr. to Ihte Cumulative 5.

Number of Hours Reactor was Critical 720.0 6315.8 57,618.3 6.

Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.

Hours Generator on Line 720.0 6,257.6 56,909.4 8.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.

Gross 'Ihenal Energy Generated (MWH) 2,435,540 21,177,362 186,706,497

10. Gross Electrical Energy Generated (MWH) 851,111 7,371,148 64,963,765 11.

Net Electrical Energy Generated (MWH) 817,529 7,043,073 61,989,202

12. Reactor Service Factor 100.0 78.8 79.7
13. Reactor Availability Factor 100.0 78.S 80.2
14. Unit Service Factor 100.0 78.1 78.8
15. Unit Availability Factor 100.0 78.1 78.8-
16. Unit Capacity Factor (Using MDC) 100.1 77.6' 75.8
17. Unit Capacity Factor (Using Design MWe) 97.0 75.1 73.3
18. Unit Forced Outage Rate 0.0 0.0 5.8
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/A
20. If Shut Down at End of Report Period, Estimated Date of Startup:

N/A Wolf Creek Generating Station-Monthly Operating Report November 1993'

4 Attachrent 1 tb NO 93-0212

-.f AVERAGE DAILY UNIT PONER LEVEL DOCKET NO.

50-482 NOLF CREEK GENERATIlG STATION NOLF CREEK NUCLEAR OPERATING OORPORATION DATE 12-01-93 CWPLEI'ED BY M. Williams TELEPHONE 316-364-8831-NOtIIH November, 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY IOTER LEVEL (MWe-Net)

(MWe-Net) 1 1145 17 1145 2

1146 18 1097 3

1145 19 1082 4

1146 20 1077 5

1145 21 1075 6

1146 22 1119 7

1146 23 1152 8

1146 24 1148 9

1146 25 1144 10 1146 26 1128 11 1145 27 1141 12 1146 28 1141 13 1146 29 1140 14 1145 30 1145 15 1145 31 N/.A 16 1145 9

i i

Wolf Creek Generating Station Monthly Operating Report Novmber 1993 Page 3 of 5.

I

. to WO 93-0212 UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.

50-482 WOLF CREEK GENERATING STATION VOLF CREEK NUCLEAR OPERATING CORPORATION DATE 12-01-93 COMPLETED BY M. Williams REPORT MONTH November. 1993 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS / COMMENTS No Date S: SCHEDULED (HOURS)

(1)

OR REDUCING POWER (2)

SUMMARY

The maximum authorized thermal power was increased from 3411 MW(t) to 3565 MW(t), but the unit remained at or above 922 power through the month of November.

1) REASON: A:

EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:

1.

MANUAL B: MAINTENANCE OR TEST.

F: ADMINISTRATIVE 2.

MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3.

AUTOMATIC SCRAM D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4.

CONTINUED 5.

REDUCED LOAD 9.

OTHER Wolf Creek Generating Station Monthly Operating Report November 1993 Page 4 of 5

Att chment 1 to No 93-0'212' HOLF CREEK NUCLEAR OPERATIl0 00RPORATION NOLF CREEK GENERATI!G STATION UNIT 10.1 MONIH November, 1993

SUMMARY

OF OPERATIIG EXPERIEtCE Listed below in chronological sequence is a sumanry of operating experiences for this wanth -

which required load reduction or resulted in significant non-load related incidents.

Pcwer levels are represented as a percentage of a nnximum authorized power level of 3411 W(t) until Novanber 20,1993, at 1712 CST, at which time power levels are represented as a percentage of a maximum authorized power level of 3565 N (t).

DATE TIME EVERP lbvember 1,1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 100% power.

Wavember 18, 1993 0615 hours0.00712 days <br />0.171 hours <br />0.00102 weeks <br />2.340075e-4 months <br /> Unit reduced to 95% power in preparation for power rerate frun 3411 m(t) to 3565 N(t).

Ibvember 20,-1993 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> Average Moderator Tanperature reduced frcan 588 f

degrees Fahrenheit to 580' degrees Fahrenheit.

. Eovanber 20, 1993 0525 hours0.00608 days <br />0.146 hours <br />8.680556e-4 weeks <br />1.997625e-4 months <br /> Unit at 96% power.

Ibvember 20, 1993 1712 hours0.0198 days <br />0.476 hours <br />0.00283 weeks <br />6.51416e-4 months <br /> Unit at 91.5% power based upon marimnn authorized power level of 3565 W(t).

hbvember 22, 1993 0550 hours0.00637 days <br />0.153 hours <br />9.093915e-4 weeks <br />2.09275e-4 months <br /> Unit at 96% power.

hbvember 23, 1993 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> Unit at 98% power.

November 23, 1993 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> Average Moderator Tanperature increased to 582.5 '

degrees Fahrenheit.

November 24, 1993 1900 hours0.022 days <br />0.528 hours <br />0.00314 weeks <br />7.2295e-4 months <br /> Unit at 97% power with Average Moderator Tamperature at 581.5 degrees Fahrenheit.

Ibvember 26, 1993 0930 hours0.0108 days <br />0.258 hours <br />0.00154 weeks <br />3.53865e-4 months <br /> Unit at 92% power for Instrunentation and Control r

testing.

3 November 26,.1993 1550 hours0.0179 days <br />0.431 hours <br />0.00256 weeks <br />5.89775e-4 months <br /> Unit at 97% power.

November 30, 1993 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> Unit at 97% power.

Wolf Creek Generating Station' Monthly Operating Report Novauber 1993 Page 5 of 5

_