ML20058L954
| ML20058L954 | |
| Person / Time | |
|---|---|
| Issue date: | 07/25/1990 |
| From: | Donnelly L NRC OFFICE OF LICENSING SUPPORT SYSTEM ADMINISTRATOR (LSSA) |
| To: | Taub L BIS CAP INTERNATIONAL |
| References | |
| NUDOCS 9008090064 | |
| Download: ML20058L954 (1) | |
Text
...
t 1
e JtA. 8 5 Sll0 Ms. Lauren A. Taub BIS CAP Intarnational One Longwater Circle 02061 Norwell, Massachusetts
Dear Ms. Taub:
- 1990, In accordance with our telephone discussion of July 17, i
ce Appli-enclosed are the following documents prepared by Sc enunder contract to the cations International Corporation (SAIC) Department of Ene Preliminary Needs Analysis Preliminary Data Scope Analysis Conceptual Design Analysis Benefit-Cost Analysis FR Part Also enclosed is a copy of the Final Rulemaking for 10 Please regulation establishing the Licensing Support System.
2, hat note that the design concept for the LSS has changed somewh from what was envisioned in the SAIC documents, but much of t e der-information is still valid and should be helpful in your un standing of our project.
Sincerely, Origiull M @
Lloyd J.
Donnelly
,/
Lss Administrator
/
/05
Enclosures:
Js As Stated h
(g '
ar DISTRIBUTION (w/o encls.)
I) 'l
./ fII)I VNUDOCS F. Cameron n
LSSA CHRON L. Donnelly k
g LSSA SUBJECT PDR U
[
M OLSSA OLSSA LSSA
,,c,
MNod VIFXi'Sm'e'ron LJDonnelly g g %,,
7//C/90 742090
_7/h90 ou,,
9000090064 900725
~
2 PDR ADVCM NACLSSAR d
PDR m,
....