Comm:nwe:lth EdlO n Zion Generating Station 101 Shiloh Blvd.
Zion, Illinois 60099 Telephone 708 / 746-2084 December 8,1993 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l
Attn: Document Control Desk
Subject:
Zicn Station Units 1 and 2 Proposed Conversion to improved Technical Specifications
Dear Mr. Murley:
I would like to take this opportunity to inform you of Zion Station's intent to i
begin a conversion from our current Custom Technical Specifications to the version
\\
presentedin NUREG-1431, " Standard TechnicalSpecifications, Westinghouse Plants ".
l Zion Station proposes to undertake a conversion process similar in nature to the issuance of the original Technical Specifications for a Near Term Operating Licenso l
(NTOL) plant. That is, a process in which a preliminary systematic chapter review is performed, and where necessary, negotiation between the licensee and staffis conducted to resolve potential discrepancies. This process was discussed with members of your staff during the Technical Specification Improvement Project (TSIP) lead plant meeting in October of this year. The proposed process is expected to yield the most efficient use of personnel which should result in resource savings for both NRC and Zion Station and ultimately provide for a more timely l
implemention of Zion Station's improved Technical Specifictions.
9312200045 931208 PDR ADOCK 05000295 gUg/
A P
PDR liO l
4 I
Zion Station will arrange a meeting to further discuss the process, schedule, and objectives of the proposed conversion process. The meeting willbe scheduled at a time and location to best facilitate representation from NRR, Region Ill and Commonwealth Edison Company.
Should you have any questions or comments regarding this matter, please direct them to my office.
Sincerely, N
k@Teutken R. P.
Site Vice President Zion Station cc:
J.B. Martin, Regional Administrator - Rlli C.I. Grimes, Technical Specification Branch - NRR C. Y. Shiraki, Project Manager - NRR J.D. Smith, Senior Resident inspector - Zion E.A. Broccolo, Station Manager - Zion D.L. Farrar, Nuclear Regulatory Services Manager - CECO R.C. Ward, Safety Review Director-CECO L.J. Bush, Regulatory Assurance - CECO Document Control Desk - NRR Master File - Zion 1