Forwards Public Version of Revised Epips,Including Rev 16 to EPIP 1-5,Rev 14 to EPIP 3-6 & Rev 10 to EPIP 5-4
ML20058L679
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/15/1993
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20058L680 List:
References
NUDOCS 9312170137
Download: ML20058L679 (6)


Text

.

u..._.

R%ba$$0426Y Q": * *l5m

. =..y -y g:3

- 'W7 h)f

+ L ** Q j'sn ?

l ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE ROCHESTER N.Y.1464W-5001 ROBIRT C. MEC Rf DY Yn.EPHONE vhe Pmedent AREA coot 716 $46-2700 Cinna Nuclear Producten I

November 15,1993 t

U.S. Nuclear Regulatory Commission Document Control Desk Attn:

Mr. Allen Johnson i

Project Directorate 1-3 Washington, D.C. 20555

Subject:

Revisions to Emergency Plan implementing Procedures R. E. Ginna Nuclear Power Plant Docket No. 50-244 Gentlemen:

i in accordance with 10 CFR 50.4 (b) (5), enclosed are revisions to Ginna Station Emergency Plan implementing Procedures (EPIPs).

We have determined, per the requirements of 10 CFR 50.54 (q), that these procedure changes do not decrease the effectiveness of our Nuclear Emergency Response Plan.

l l

Very truly yours, l

I

/

\\

Robert C. Me.:r.dy Enclosures c:

Mr. Ebe McCabe, USNRC, Region 1 Mr. Thomas T. Martin, USNRC, Region 1 Resident inspector, Ginna Station RG&E Nuclear Safety & Licensing 9312170137 931115 PDR ADOCK 05000244 F

.PDR-g e9

e4%,use

%1

4

- t 4

s Procedures Index EPIP 1-5 Rev.16 EPIP 3-6 Rev.14 EPIP 5-4 Rev.10

s..

REPORT No. 01 ROCHESTER GAS & ELECTRIC 11/05/93 13:31 PAGE 1

REPORT NAMEt DOC-P001 PROCEDURES INDEX DOC TYPE! PREPIP EMERGENCY PLAN IMPLEMENTING PROCEDURE PARAMETERS: DOC TTPES - PREPIP PRER PRES PRF PRFR PROCEDURE PROCEDURE TITLE REV EFFECT LAST NEXT ST

\\

NUMBER DATE REVIEW REVIEW EDIP-1 0 GINNA STATION EVENT EVALUATION AND CLASSIFICAfl04 014 08/31/93 01/27/93 07/27/95 EF EPIP-1 1 Unusual EVENT 001 12/16/92 12/09/92 06/09/95 EF EPIP-1-2 ALERT 002 12/16/92 12/09/92 06/09/95 EF EPIP-1-3 SITE AREA EMERGENCY 004 02/12/93 01/20/93 07/20/95 EF EPIP 1 4 GENERAL EMRGENCY 003 02/12/93 01/20/93 07/20/95 EF EPIP-1-5 NOTIFICATIONS 015 08/31/93 01/20/93 07/20/95 EF EPIP-1-6 SITE EVACUATION 004 02/12/93 01/20/93 07/20/95 EF EPIP 1 T ACCOUNTA5tLITY OF PERSONNEL 002' 12/16/92 12/09/92 06/09/95 EF EDID-1 8 SEARCN AND RESCUE OPERATION 001 12/16/92 12/09/92 06/09/95 EF EDIP*1-9 TECHNICAL SUPPORT CENTER ACTIVATION 006 06/19/93 12/09/92 06/09/95 EF EPIP 1*10 OPERATIONAL SUPPORT CENTER (OSC) ACTIVATION 004 02/12/93 01/20/93 07/20/95 EF EPIP 1 11 SURVEY CENTER ACTIVATION 00T 06/19/93 01/20/93 07/20/95 EF EPIP-1 12 REPAIR AND CORRECTIVE ACTION GUIDELINES DURINC EMERGENCY SITUATIONS 001 02/12/95 01/20/93 07/20/95 EF EPIP-1 13 LOCAL RADIATION EMERGENCY 002 02/12/93 01/20/93 07/20/95 EF EPIP-1-14 STATIGl CALL LIST.

005 02/12/93 01/20/93 0'/20/95 EF EPIP-1 15 USE OF NEALTN PWYSICS NETWORK (NPN) 002 02/12/93 01/20/93 07/20/95 EF EPIP-1-16 RADI0 ACTIVE LleUID R2 LEASE TO LAKE ONTARIO 002 02/12/93 01/20/93 07/20/95 EF EPIP 2-1 PROTECTIVE ACTION RECCIGEENDATIONS 009 08/31/93 01/27/93 _07/27/95 EF EPIP 2 2 OsTAINING METEOROLOGICAL DATA AND FORECASTS AND THEIR USE IN EMERGENCY 005 09/10/93 01/27/93 07/27/95 EF DOEE ASSEssM NT EPIP-2-3 EMERRENCY RELEASE RATE DETERMINATICII 004 02/12/93 01/13/93 07/13/95 EF EPIP 2 4 E E REENCY DOSE PROJECTIONS - MANUAL M TN00 005 02/12/93 01/13/93~07/13/95 EF EPIP-2-5 EMEteENCY DeeE PROJECTIONS - PERSONAL CofrUTER METNOD 001 02/12/93 01/13/93 0T/13/95 EF EPIP-2-6 EMERGENCY Dost PROJECTIONS - MIDAS PROGRAM 004 09/10/93 01/13/93 =07/13/95 EF EPIP-2 7 MANAGEMNT OF EERENCY SURVEY TEAMS -

001 02/12/93-01/13/93 07/13/95 EF b,

o

e REPORT No. 01 RottIESTER GAS & ELECTRIC 11/05/93 13:31 PAGE 2

CEPORT NAME: 00C-P001 PROCEDURES INDEX se DOC TYPE: PREPIP EMERGENCY PLAN IMPLEMENTING PROCEDURE PARAMETERS: DOC TTPES PREPIP PRER PRES PRF PRFR PROCEDURE PROCEDURE TITLE REV EFFECT LAST NEXT ST NUMBER DATE REVIEW REVIEW EPIP 2 8 VOLUNTARY ACCEPTANCE OF EMERGENCY RADIATION EXPOSURE 002 02/12/93 01/13/93 07/13/95 EF EPIP-2-9 ADMINISTRATION OF POTASSIUM ICDIDE (EI) 001 02/12/93 01/13/93 07/13/95 EF EPIP-2-10 INPLANT RADIATION SURVEYS 001 02/12/93 01/13/93 07/13/95 EF EPIP 2-11 ONSITE SURVEYS 002 02/12/93 01/27/93 07/27/95 EF EPIP-2-12 0FFSITE tuRVEYS 005 10/29/93 01/27/93 07/27/95 EF EPIP-2 13 IMINE AND PARTIQJLATE ACTIVITY DETERMINATION FROM AIR SAMPLES 003 02/12/93 01/27/93 07/27/95 EF EPIP-2-14 POST PLUME ENVIRouMENTAL SAMPLING 003 02/12/93 01/27/93 07/27/95 EF EPIP-2-15 POST PLLME EVALUATION OF OFFSITE DOSES DUE TO DEPOSITION 002 02/12/93 01/27/93 07/27/95 EF EPIP 2-16 CORE DAMAGE ESTIMATION 005 02/12/93 01/27/93 07/27/95 EF EDIP-2 17 NYPOTNETICAL (PRE-RELEASE) DOSE ESTIMATES 002 02/12/93 01/27/93 07/2T/95 EF EPIP-2-18 CONTROL ROOM DOSE ASSESSMENT 004 10/29/93 01/29/92 07/29/94 EF EPIP 3-1 EMERGENCY OPERATIONS FACILITY (EOF) ACTIVATION AND CPERATIONS 007 11/14/92 11/04/92 05/04/95 EF EPIP-3-2 ENGINEERING SUPPORT CENTER (ESC) 004 02/12/93 01/27/93 07/27/95 EF EPIP 3-3 IMEDIATE ENTRY 001 02/12/93 01/2T/93 07/27/95 EF EPIP-3-4 EMERGENCY DECLASSIFICATION AND REccVERY 002 06/19/93 01/27/93 07/27/95 EF EPIP-3-6 CGtPORATE NOTIFICATIONS 013 06/31/93 01/13/93 07/13/95 EF EPIP-3-7 SECURITY DURING EMERGENCIES 004 10/29/93 01/2T/93 07/27/95 EF EPIP-4 1 PUBLIC INFORMATION RESPONSE TO AN UNUSUAL EVENT 003 10/09/93 01/27/93 07/2T/95 EF EPIP-4-2 PUBLIC INFORMATION RESPONSE FOR ALERT OR NIGNER 005 10/09/93 01/27/93 07/2T/95 EF EPIP-4-3 ACCIDENTAL ACTIVATION OF GINNA EIERGENCY NOTIFICATION SYSTEM SIRENS 004 10/09/93 01/2T/93 07/2T/95 EF EPIP-4-4 RtMOR CONTROL 002 10/09/93 01/2T/93 07/27/95 EF EPIP-4 5 PUBLIC AFFAIRS NOTIFICATIONS 007 10/09/93 01/27/93 07/27/95 EF E?IP-4-6 JOINT EMERGENCY NEWS CENTER ACTIVATION 004 10/09/93 01/27/93 07/27/95 EF EPIP-4-7 PUBLIC INFORMATION ORGANIZATION STAFFING 004 10/09/93 01/27/93 07/27/95 EF EPIP-5 1 0FFSITE EMERGENCY SESPONSE FACILITIES AND EQUIPMENT PERICOIC INVENTORY 004 10/29/93 01/20/93 07/20/95 EF

-o

+ ~

REPORT Wo. 01 ROCNESTER GAS & ELECTRIC 11/05/93 13:31 PAGE 3

CEPORT IWWEs DOC-P001 PROCEDURES INDEX DOC TYPEt PREPIP ENERGENCY PLAN IMPLEMENTING PROCEDURE PARAMETERS: DOC TYPES - PREPIP PRER PRES PRF PRFR

\\

PROCEDURE PROCEDURE TITLE REV EFFECT LAST NEXT ST IRMBER DATE REVIEW REVIEW CNECES AND TESTS EPIP 5 2 CeSITE ENERGENCY RESPONSE FACILITIES AND EGUIPMENT PERIODIC INVENTORY 006 10/29/93 01/20/93 07/20/95 EF CNECKS AND TEST EPIP-5 3 TESTING OF THE GINNA NUCLEAR EMERGENCY PLAN PAGERS 009 10/29/93 01/20/93 07/20/95 EF EPIP-5-4 EERGENCY PLAN llFLEMENTING PROCEDURE (EPIP) TRAINING PROGUWI 009 08/31/93' 01/13/93 07/13/95 EF EPIP-5-5 CONDUCT or DRILLS AND EXERCISES 005 09/10/93 01/27/93 07/27/95 EF EPIP-5-6 ANMuAL REVIEW OF WUCLEAR EMERGENCY RESPONSE PLAN (NERP) 002 10/29/93 10/29/93 10/29/96 EF EPIP-5-7 EEkGENCY ORGANIZATION 010 06/19/93 01/20/93 07/20/95 EF EPIP-5-9 TESTING THE OFF INRNts CALL IN PROCEDURE AND GUARTERLY TELEPHONE NUMBE 002 06/19/93 11/06/91 05/06/94 EF R CNECK EPIP 5 10 EMERGENCY RESPONSE DATA SYSTEM (ERDS) 002 10/29/93 01/03/93 07/03/95 EF TCTAL FOR PREPIP' 57 f

l l

t l

l l

{

_._;_...__..u..

I os neau 0

UNITED STATES g

o g

,j NUCLEAR REGULATORY COMMISSION i

o WASHINGTON, D.C. 20555

% *...+ /

December 13, 1993 50-244 I

Ginna MEMORANDUM FOR:

Chief, Document Control Branch, IRM FROM:

Director, Division of Freedom of Information and Publications Services, ADM 7

SUBJECT:

REVIEW OF UTILITY EMERGENCY PLAN DOCUMENTATIOli The Division of Freedom of Information and Publications Services has reviewed the attached document and has determined that it may now be made publicly available.

Wb l

Donnie H. Grimsley, Dire tor Division of Freedom of Informati~

j l

and Publications Services Office of Administration

i k

I DFoa l\\(

j

i' s-e.

s

' ROCHESTER GAS AND. ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER I

k PROCEDURE NO.

EPIP 1-5 REV. NO.

16 i

t NOTIFICATIONS e

TECHNICAL REVIEW i

PORC REVIEW DATE

!! 9 b PLA!W SUPERINTENDENT l

\\ \\- \\ \\- %

EFFECTIVE DATE I

i CATEGORY 1.0 i

REVIEWED BY:

j i

THIS PROCEDURE CONTAINS 39 PAGES I

i e

i

'1

-_.~...m

.l 4

K non.V"4

]

4 EPIP 1-531 EPIP 1-5 NOTIFICATIONS 1.O PURPOSE The purpose of this procedure is to specify the means by which notifications are to be made to station personnel for all emergency levels, to expedite the notification of selected RG&E personnel to augment the emergency response organization and notify offsite agencies.

2.0 RESPONSIBILITY 2.1 The Shift Supervisor, Emergency C:ordinator or EOF / Recovery Manager is responsible for making the decision to notify offsite agencies.

2.2 Ginna Station Control Room personnel are responsible for implementing this' procedure.

2.3 The RG&E Gas Dispatcher is responsible for implementing a of this procedure.

2.4 RG&E Telephone Service is responsible for implementing

, b to this procedure.

3.0 REFERENCES

3.1 Developmental References 3.1.1 Nuclear Emergency Response Plan 3.2 Implementing References 3.2.1 EPIP 1-0, Ginna Station Event Evaluation and Classification 3.2.2 EPIP 1-14, Station Call List 3.2.3 EPIP 2-1, Protective Action Recommendations 3.2.4 0-9.3, NRC Immediate Notification 3.2.5 10 CFR 26 Fitness for Duty Programs 4.0 PRECAUTIONS 4.1 Implementation of this procedure requires the specific approval of the Shift Supervisor, Emergency Coordinator or the EOF / Recovery Manager, depending on which is in command and control of the emergency.

i

t a

EPIP 1-5:2 e

4.2 New York State and Wayne and Monroe Counties must be notified of all Emergency Classifications within 15 minutes of a declaration.

j 4.3 The licensee should notify the USNRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of the Emergency Classes.

4.4

" Event 1" and " Event 2" printouts (Attachment 3c and 3e or 3f) should not be transmitted to offsite authorities until the TSC is fully manned and has assumed command and control.

4.5 Assure

" EVENT 1" and " EVENT 2" (Attachment 3c) printout copies are legible and adequately reduced in size for l

telefaxing to offsite organizations.

4.6 Telefax operations should be monitored to assure that no undue data transmission delays are occurring.

i 5.O PREREOUISITES An Emergency has been declared in accordance with EPIP 1-0, Ginna Station Event Evaluation and Classification 6.0 ACTIONS 6.1 Shift Supervisor, Eeergency Coordinator, EOF / Recovery Manger 6.1.1 Upon initiation of an Unusual Event at the Ginna Station, direct control room personnel to implement section 6.2.1 of this procedure.

If the event is an Alert or higher, implement Section 6.2.2.

6.1.2 Ensure that notifications of all emergency declarations to New York State and Wayne and Monroe Counties are made within 15 minutes of declaring an emergency, in accordance with Attachment 3.

6.1.3 The licensee should notify the USNRC immediately after notification of the appropriate State or local agencies i

and not later than one hour after the time the licensee declares one of the Emergency Classes.

6.1.4 If additional assistance is required,-refer to EPIP 1-14, STATION CALL LIST, for phone numbers of station personnel.

i EPIP 1-5:3 6 *. 5 Control Room Personnel 6.2.1 Unusual Event N(TTE:

Notify the Plant Manager, Plant Operations Manager and the Plant Technical Assessment Manager to report to the TSC to support the Control Room with Offsite Communications.

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

a.

Report to those individuals listed on Attachment 1 UNUSUAL EVENT NOTIFICATIONS.

"We have an Unusual Event at Ginna Station Based on (Initiating Conditions)

Please report to your emergency station";

NOTE:

After completing step 6.2.1.b, the New York State Radiological Form Part I should be telecopied to New York State, Wayne and Monroe Counties, b.

Report information to New York State, Wayne and Monroe Counties within 15 minutes of classifying the emergency using Attachment 3, New York State Radiological Emergency Data Form Part I,

and USNRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of the Emergency Classes, using 0-9.3.

c.

At the request of the Emergency Coordinator notify additional persons to staff TSC as appropriate.

Positions notified may include:

Maintenance Management and support HP and Chemistry Management and support Reactor Engineer i

Technical Manager Security Manager Operations Manager Nuclear Assurance Management and support Communications support d.

The Emergency Operations Centers for New York State, Wayne and Monroe Counties may activate and request information verification using the NYS Hot Line (RECS Line).

s a

EPIP 1-5 4 e.

If the Unusual Event lasts greater than 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, an update using Attachment 3a should be provided each hour from when the event was declared.

6.2.2 Alert Classification or Higher a.

Notify Gas Dispatcher (711-8522) to begin the TECHNICAL SUPPORT CENTER CALL LIST, using Attach-ment 4a.

(This is not necessary during normal working hours) b.

Notify RG&E Telephone Service (711-0) to begin the HEALTH PHYSICS SECTION CALL LIST, using b.

(This is not necessary during normal working hours)

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

c.

Report to the personnel listed on Attachment 2, ALERT OR HIGHER NOTIFICATIONS.

"We have an at the (Emergency Classification)

Cinna Station based on (Initiating Conditions)

Please report to your emergency station";

d.

Report information to New York State, Wayne and Monroe Counties within 15 minutes of declaring the emergency,'using Attachment 3, INSTRUCTIONS FOR NEW YORK STATE RADIOLOGICAL EMERGENCY DATA FORMS AND EVENT 1 AND EVENT 2 REPORTS and every.

30 minutes thereafter.

e.

If the event lasts greater than 1/2

hour, updates using Attachment 3a should be provided each 1/2 hour from the event initiation.

f.

Report information to the USNRC immediately after notification of the appropriate State or local agencies and not later than one hour after the time the licensee declares one of the Emergency Classes, using 0-9.3.

g.

Notify Power Control that Ginna has an emergency and to implement procedure to increase reliability of power supply to Ginna.

h.

Contact personnel at special locations as known by Shift Supervisor or control Room personnel and request they report to Ginna Station for an emergency, repeating the report in step 6.2.2.c.

s a

EPIP 1-5:5 1

1.

Contact INPO at 9-404-953-0904 - or using phone number in Attachment 5, SPECIALIZED NOTIFICATION

LIST, and request that they activate their Emergency Response Plan.

j.

Review that all personnel on Attachments 4a and 4b list have been contacted and when Gas Dispatcher and Telephone Service report back which positions have not been contacted, continue trying to reach them.

Make Shift Supervisor aware of any positions not filled.

k.

If a Site Area Emergency has been declared, implement 6.2.3.

1.

If a

General Emergency has been declared-implement 6.2.3 and 6.2.4.

6.2.3 Site Area and General Emergencies a.

All steps in 6.2.2 have been completed.

b.

Contact Westinghouse at 9-315-475-3694 or i

9-203-329-6023 or using phone numbers in

.l Attachment 5,

SPECIALIZED NOTIFICATION LIST,

)

and request that they activate their Emergency Response Plan.

l c.

If requested by the Emergency Coordinator, j

request radiological assistance from Radiation i

Assistance Program (RAP) team, Brookhaven, at 9-516-282-2200.

6.2.4 General Emergency a.

Notify Radiation Management Consultants of the General Emergency Condition using phone numbers in Attachment 5, SPECIALIZED NOTIFICATION LIST.

b.

Notify Plant Doctors of General Emergency condition and any medical problems using phone J

numbers in Attachment 5 for Doctors Norman Loomis, Daniel Koretz, Neal Smith, and Ralph Brown.

i

)

s EPIP 1-526

~

7.0 ATTACHMENTS 1

UNUSUAL EVENT NOTIFICATIONS 2

ALERT OR HIGHER NOTIFICATIONS 3

INSTRUCTIONS FOR NEW YORK STATE RADIOLOGICAL DATA FORMS AND EVENT 1 and EVENT 2 PRINTOUTS 3a NEW YORK STATE RADIOLOGICAL EMERGENCY DATA FORM (PART 1) 3b NEW YORK STATE RADIOLOGICAL EMERGENCY DATA FORM (PART II) 3c PPCS EVENT 1 AND EVENT 2 DATA REPORTS 3d OBTAINING EVENT 1 and EVENT 2 PRINTOUTS FROM THE COMPUTER (PPCS) 3e EVENT 1 SUPPLEMENTAL INFORMATION 3f PLANT STATUS REPORT (PPCS NOT AVAILABLE) 4a TECHNICAL SUPPORT CENTER CALL LIST 4b HEALTH PHYSICS SECTION CALL LIST 5

SPECIALIZED NOTIFICATION LIST 6

SURVEY TEAM MEMBER CALL LIST V

e

6 4.-.

EPIP 1-527 i

Page 1 of 2 UNUSUAL EVENT NOTIFICATIONS NOTE:

The following question must be asked of each person 3

called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Plant Manacer:

4 Joe Widay Bus.

250 Home Pager 9-716-921-5507 If Plant Manaaer not available; Dick Marchionda Bus.

699 or Home Pager 9-716-921-7240 or-

_om Marlow y

Pager 9-716-921-66 Technical Assessment Manaaer:

Steve Adams Bu Pager 9-716-921-5508 (if unavailable)

Jeff Wayland Bu 1[

Pager 9-716-921-7708 (or)

John Cook B

Pager 9-716-921-7389 operations Manag3I:

Terry Schuler B

Pager 9-716-921-8278 (if not available)

Ron Ruedin Bus.

300 Home (or)

Pager 9-716-921-7280 Terry White Pager 9-716-921-9399

r

.f%gf]-

l

,c-a

.EPIP 1-599 Page 1 of 1 ALERT OR HIGHER NOTIFICATIONS JiqIE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Plant Manacer:

Joe Widay Bus.

250 Home Pager 9-716-921-5507 If Plant Manaaer not available:

Dick Marchionda Bus.

699 Home ~ ""CL i, *(,, 4 or Pager 9-716-921-7240 Tom Marlow Bus.

315 Home 4 Pager 9-716-921-8366 Notify EOF Recovery Manaaer:

Sr. V.P. Engineering Bus.

7 7

and Production Home Robert E. Smith Pager 9-716-921-8317 If unable to contact the Sr.

V.P.

Engineering and Production, call the below persons until one is reached and inform them of the emergency class and that they are the EOF Recovery Manager:

NOTE:

Contact telephones first, then use pagar # if necessary.

Robert Mecredy Bus.

71 -pq Home Pager 9-716-921-5514 Gary Meier Bus.

9-716-546-2700 I

l ext. 711-6622 l

Home 6-Pager 9-716-238-1325 Paul Wilkens Bus.

711-8076

'RW' Home Rick Watts Bu Pager 9-716-921-5513

{

USNRC Resident Insoector:

Tom Moslak Bu

~

.7-# 9 y%; ~.

.. sy;p,Qp j?{Q i

^

@dy;ap2y'r,.yl

. i 8 fli A +; fO r;; e.; & ' ~ '

,n.b, w,,

gpc,;. 7 y _ c,. ;,.

, x y

typ ;;a >

t 9-g j,.

+

',y #

~;

y.$ 4 y

w EPIP 1-5:8 4

f'ttachment'l A

Page 2 of 2

-7 USNRC Resident Insnector:

Tom Moslak Bus.

265..

Home coroorate Nuclear Eneroency Planner!

Dick Baldue B

Pagar 9-716-921-5511 e

if not available -

Peter Polfleit Bus.

9-315-524-4446 x-108 Home Pagar 9-716-238-1324 or Richard Watts Bus.

9-716-724-8706 Home Pager 9-716-921-5513 or

)

Richard Morrill Bs 1

Ho or Wes Backus Bus.

9-315-524-4446 X-302 Home Pager' 9-716-921-5512 or R ank Orienter Bus.

9-7 6-771-2265 Home Pager 9-716-921-3915

o e

i l

EPIP 1-5:10 J

Page l'of 3 r

INSTRUCTIONS FOR NEW YORK STATE RADIOLOGICAL DATA FORMS AND PLANT STATUS. REPORTS INSTRUCTIONS FOR NEW YORK STATE RADIOLOGICAL DATA FORMS, PART I AND PART II (ATTACHMENTS 3a AND 3b) 1.

The New York State Radiological Emergency Data Form, Part f

I, should be filled out with the assistance of the Emergency Coordinator / EOF Recovery Manager and Health Physics personnel.

2.

For step 8 of form, enter the event description from EPIP 1-0 event classification.

3.

The determination for step 10 is made by checking monitors on possible release pathways for the specific event and l

comparing the monitor readings against the Tech Spec

?

limits given in P-9.

4.

Obtain weather information, steps 14-18 of form, using Control Room weather indication, the plant computer, the on-shift HP Tech, or the Dose Assessment Manager.

If the primary weather tower is unavailable, the HP Tech or Dose i

Assessment Manager will determine the stability class in accordance with EPIP 2-2.

i 71QIE:

Any protective action indicated on EPIP 1-5 Attachment 3a shall reflect the recommendation r

being made by Rochester Gas and Electric to offsite-f authorities.

5.

For step 12 of form, Emergency Coordinator / EOF Recovery Manager shall use EPIP 2-1, Protective Action Recom-mendations, j

6.

Step 13 is used to reflect what information was used to formulate the PARS.

If there are no PARS, then step 13 should be "D - not applicable".

7.

Report the information on the completed New York State Radiological Emergency Data Form Part I to New York State, Wayne and Monroe County within 15 minutes of classifying the emergency using the NYS Hot Line (RECS):

a.

Press button, allow 10 seconds j

b.

Request roll call.

Ask if the following are on the line:

J 1.

New York State 2.

Monroe County 3.

Wayne County i

This is Ginna Station i

i l

-o.

EPIP 1-5:11 l

Page 2 of 3 INSTRUCTIONS FOR N.Y.S. RADIOLOGICAL DATA FORMS (cont'd) 7.

c.

Report information using Attachment 3a, Part 1, New York State Radiological Emergency Data Form.

8.

If NYS HOT LINE IS OUT OF ORDER, use commercial lines:

a.

New York State 9-1-518-457-2200 or i

I 9-1-518-457-6811 e

b.

Wayne County 9-1-946-5663 or 9-1-597-6291 c.

Monroe County 9-716-473-0710 or 9-716-473-7200 9.

Report only Steps 1 through 18 on the initial contact.

10.

Report the information by reading the statement number and the statement including the designation letter (e.g. lAl).

11.

For UNUSUAL EVENTS that last one hour or more,use the New l

York State Radiological Emergency Data Form Part I, steps 1 through 18 updates each hour.

12.

For an ALERT or Higher the New York State Radiological Emergency Data Form, Part I information will be reported within 15 minutes when the event is initially classified, any time the classification is changed, and every 30 minutes during the event.

13.

Data in steps 19B through 24 of the New York State Radio-logical Emergency Data Form Part II (Attachment 3b) should be filled out by Dose Assessment and transmitted by telecopy as information becomes available.

14.

Telecopy all New York State Radiological Emergency Data Forms to the following using instructions on fax machine:

Wayne County 315-946-6110 Monroe County 716-256-6336 New York State 518-457-9942 EOF 726-262-5788 TSC 315-524-5351 15.

Blank copies of the New York State Radiological Emergency Form Part I 5 Part II are available in the Control Room and TSC.

16.

At the completion of an actual event or exercise, com-pleted copiee of the New York State Radiological Emergency Form Part I and Part II used shall be sent to Corporate Nuclear Emergency Planner for review and submittal to Central Records as appropriate.

9f 5

EPIP 1-5 12

-l Page 3 of 3 l

INSTRUCTIONS FOR EVENT 1 and EVENT 2 PRINTOUTS l

1.

Assure the Plant Process Computer System (PPCS) is opera-tional. and " EVENT 1" and " EVENT 2" reports can be obtained-by using instructions in Attachment 3d.

If PPCS not i

available then Attachment 3f must be used.

Proceed to i

step 5 for information on using Attachment 3f.-

2.

Query the PPCS to obtain printouts of~ " EVENT 1" and

" EVENT;" approximately every 15 - 30 minutes, or as plant i

conditions warrant (See Attachment 3c (Form). and 3d-(Instructions)).

=!

i 3.

Copies of the most current " EVENT 1" and " Event 2" should be telefaxed to Wayne County, Monroe County and NYS every 30 minutes.

Telefax back-ups.should be avoided by staggering times when " EVENT" forms and Part I & II forms (Attachment 3a & b) are transmitted.

l 4.

If the PPCS is unavailable, Attachment 3f must be com-pleted with the assistance of Control Room or TSC person-i nel, and telefaxed to Wayne and Monroe Counties, NYS and l

the EOF.

i 5.

When completing Attachment 3f, if the parameter is measur-

'I able (e.g., pressurizer level) use the numerical value.

6.

When the Attachment 3f parameter is not measurable, the condition of any deviation from normal should be noted

.i (e.g., core circulation - forced or natural).

7.

The completed forms shall be returned to the Shift Super-I visor or Emergency Coordinator after transfer of the data.

j t

8.

At the completion of an actual event or exercise, com-pleted EVENT 1 and EVENT 2 Printouts shall be forwarded to l

Corporate Nuclear Emergency Planner for review and submittal to Central Records as appropriate.

9.

As time permits supplemental information continued in e should be completed by the Control Room communicator and telefaxed to the TSC and EOF every 15-30

.j minutes.

i f

i r

i

t EPIP 1-5213 Attachment 3a Page 1 of 1 Read everything on this page over the RECS phone.

j NEW YORK STATE RADIOIDGICAL EMERGENCY DATA FORM fPART I)

ROLL CALL RESPONSE: NEWYORKSTATEWARNINGPOINTl_l MONRDECOUNTTl_l WAYNE COUNTY l_l 1.

MessaBe transaltted att CATE:

TIME:

VIARECSl_l TELEPHONE l_l

)

2.

This is...

A NOT AN EXERCISE B AN EXERCISE l

3.

Nuclear FactLity providing this report (s C GINNA STATION 4.

Reported by: NAME TITLI _

TEL #

5.

Reported from: A CONTROL ROOM B TSC C EOF D OTNER 6.

Emergency Ctessification: A unusual EVENT B ALERT C $1TE AREA EMERGENCY D GENERAL EMERGENCY E UPGRADED F RECOVERY G EMERGENCY TERMINATED H TRANSPORTATION INCIDENT l

7.

A TNIS EMERGENCY CLASSIFICATION DECLARED AT: DATE Ti tE l

B THl3 IS AN INFORMAfl0NAL NOTIFICATION ONLY.

THIS EVENT DOES NOT CONSTITUTE ONE OF THE FDUR EMERGENCY CLASSIF ' CATIONS.

8.

Event description (per EPIP 1 0 event etessification). Do not abbreriste.

i i

I 9.

Plant status: A STABLE B IMPROVING C DEGRADING D NOT $NuTDOWN E CetD $NuTDOWN F UNKNOWN

)

10.

Reteese of Radioactive Materials gebove technical specification timits):

A a0 RELEASE B AN ATMOSPNERIC RELEASE C RELEASE To A BODY OF WATER D A GROUND SPILL

'i

11. The release is: A NOT APPLICABLE B CONTINU!NG C INTERMITTENT D TERMINATED
12. Protective action recommendations (EPIP 2-1)

A THERE IS 50 NEED FOR PROTECTIVE ACT!DNS OUTSIDE THE $1TE BOUNDARY B NEED FOR PROTECTIVE ACTION l$ UNDER EVALUATION C smELTERIns RECOMMENDED IN THE FOLLOWING ERPA*S: l BASIS-RADIUS: 2 5 10 MILES. DOWNWIND MILES l lW1W2W3W4W5W6W7M1M2M3M4M5M6M7M8M9l D EvAcuATIDs RECOMMENDED IN THE FOLLOWING ERPA'S lW1 W2 W3 W4 W5 W6 W7 M1 M2 M3 M l BAS!$ RADIUS: 2 5 10 MILES. DOWWWIND MILES l l

13. Basis for protective action recommendations: A PLANT CONDITIONS B FIELD MEASUREMENTS C PROJECTED OFFSITE DOSES D NOT APPLICABLE I

i

14. Wind speed MILES PER NOUR

'l 90 BOT REPORT l

Stab 1Lity Ctsse Work Sheet

.{

15. Wind direction (from)

DEGREES (elevation) ft.l l Temperature at 250 feet

  • F 16.

Stability class (STABLE, UNSTABLE, OR NEUTRAL) l Temperature at 33 feet

  • F

{

l Temperature difference

'F

17. Ambient temperature DEGREES F (at 33 feet)

[

-1.74

-0.65 l

Unstable I Neutral i Stable l

18. Weather conditions A CLEAR B CLOUDT C RAIN D SNOW l

-3 2

-1 0

1 l

Temperature Offference ROLL CALL RESPONSE: NEWYORKSTATEWARNINGPOINTl_l MONROECOUNTYl_l WAYNECOUNTYl_l l

FOR REAE USE cutt Time Completed:

Time Approved:

Time sent via RECS.

By:

By:

Time telefaxed

[

Completed form sent to CNEP 49/5

.O

)

EPIP 1 5:10 WEV T0tt TTATE RADIOLOGICAL EMACERCT DATA FORN (PART II) b Telefea this data form to l_lNEW 10RK STATE l_lMONRDECOUNTT l_lWATNECOUNTT Page 1 of 1

19. Message transaltted att CATE:

TIME:

FRON:

Based on Information available at TIME:

20.

General reteese Information:

A RELEASE STARTED AT: DATE TIME B PROJECTED DURATION OF RELEASE:

C TIME OF TERMINATION OF RELEASE:

D REACTOR SMUTDOWN:

DATE TIME E WIND $ PEED:

MPH F WIND DIRECTION: (free)

DECREES G PASQUILL STABILITT CLA13

21. Atmospheric reteese information:

A EFFECTIVE RELEASE NEIGHT:

FEET B IoDIkE/ NOBLE CAS RATIO:

C cress RELEASE RATE:

Cl/SEC D IDDINE RtLEASE RATE:

Cl/SEC E NostE cAs RELEASE RATE:

Cl/$EC F PARTICULATE ACTIVITY:

Cl/SEC

22. Waterborne retesse or surface spilt information:

A VOLUME OF RELEASE CALLONS B CONCENTRATION (gross):

uti/ml C RADIONUCLIDES IN RELEASE (in uti/el):

D TOTAL ACT!v!TT RELEASED Ci

23. Dose / dose rate estculations DATA 18 BASED ON: A INPLANT MEASUREMENTS B FIELD MEASUREMENTS C assumed SOURCE TERM TABLE BELOW APPLIES TO: A ATMOSPMERIC RELEASES B WATERS 0RNE RELEASES WHOLE BCDT CHILD'S TNTROID WHOLE 80DT CHILD's TNTROID DISTANCE Ku/0 FEM / HOUR PEW /H0Je PEM PEW

$1TE Dolh0ARY 2 NILES 5 MILES 10 mtLES l

...... p1Lts 24 Field sensurement of dcse rates or surface ccritamination (aeposition)

MILE / SECTOR OR LOCATION Ut T!8E OF DOSE RATE (MR/HR) Gt N1LES/DEGPEE$

$AMPL1NG POfNT afASUPEMENT CONT & INATfON fCi/K2 1

l 1

)

REMARKS i

f 0R RCE t:sE DELT: Time Completed:

Time Approved:

]

By:

By:

Time telefamed:

Completed form sent to CNEP 49/5 i

l

C1'I P 1-5 : 15 c PROGR4rtNAME :LRUTSI.E PPCS EVE!iT 1 AND EVENT 2 PRINTOUTS R.E. GDf1A NUCLEAR POWER PLANT Page 1 of 3 TREND GR9ur ASSIGmENT SL*1 MARY GRotP P M E GROUP DESCRIPTION EVENT!

FROCEDtriE: EPIP 1-5 PLANT STATUS PolkT ID DESCRIPTION CUrJINT VALUE O!MLITY CODE ENGR UNITS I

ATWS ANTICIPATED TRANSIENT W/D SCRArt NO ATWS GOOD 2

RIT FIACTOR TRIP BPIMER STATUS NOT TRIP GOOD 3

N31 SOURCE RA'EE DETECTOR N-31 3.51523-f!

ItHB CFS 4

N32 SOURCE RANGE LETECTOR N-32 3.23526-01 ItMB CPS 5

N35

[NTERFIEDIATE RANT DETECTOR N-35 7.24664-04 INHB Af1P

[

6 N36 INTERMEDIATE RANT DETECTOR N-36 6.3416f-f4 IPNB AP 7

NP AVERAGE NUCLEAR POWER 97.71 GOOD I

B PRCS FEACTOR COOLANT SYSTEM #4 PRESS 2:P9 GOOD PSIG 9

LPZR FREESURIZER AVERAGE LEVEL 50.1 GOOD I

19 FRCLA REACTOR COOLANT LOOP A AVG FLOW 93.3 GOOD I

FRCLB EEACTOR COOLANT LOOP B AVG FLOW 97.1 GOOD I

12 RIT!6 RCFA BEAKER CAUSE RI TRIP NOT TRIP GOOD 13 RIT17 RCPB BREMER CAUSE RI 1FIP NOT TRIP GOOD 14 TSUBTC ItCORE TC SUBC00 LED f%RGIN 32.3 G00*

DEGF 15 LSGA STM GEN A NARR0W RA"SE AVG LEVEL 50.8 GOOD I

16 LSGB SIM GEN B NARROW RANGE AVG LEVEL 53.0 GOOD I

7 PSG4 STM GEN A AVERAGE PRESSURE 701.

GOOD PSIG 1

IB PSGB STM GEN B AVERAGE PRESSURE 772.

GOOD PSIG 19 GENBKR1 GENERATOR ON LINE BREMER 1G1372 t01 TRIP GOOD i

29 GEN 9"R2 GENERATOR ON LINE BREAKER 911372 NOT TRIP GOOD I

21 BU5hA PUS !! A SUPPLY BEAXER t0T TRIP GOOD 22 BUS 11B BUS 11B SUPPLY BREAKER TOT TRIP GOOD 23 BUS 12A BUS 12A SUPPLY BREAKER PCT TRIP GOOD 24 BUS!2B BUS 12B SUPPLY BEAKER N0T TRIP GOOD 25 BilA12A Pts 11A 7012A TIE BREAKER TRIPPED GOOD 26 B115128 BUS 11B T0128 TIE BREAKER TRIFFED GOOD 27 PCV CONTAlttiEN1 AVER 43E PRESSURE

. I'6 GOOD PEIG 28 LSUMPA CONIAltt1ENT Si!1P A AVERAGE LEVEL 1.8 GOOD FEET 29 L9942E SUMP B LEVEL B IMS (TRAIN Al LOWER GOOD 39 Le943E SUMP B LEVEL B I M S (TRAIN Bl LOWER GOOD 31 Le942D SUMP B LEVIL 7B IMS (TRAIM Al LOWER GOOD 32 L9943D SUMP B LEVEL 78 IMS (TRAIN B1 LOWER GOOD 33 1952C SUMP B LEVEL 113 INCES(TRAIN Al LOWER GOOD i

34 Le943C Str1P B LEVEL 113 IMS(TRAIN 3)

LOWER GOOD 35 Lf942B SUMP B LEVEL IDS INCES(TRAIN Al LOWER GOOD 36 LB943B SUMP B LEVEL 100 I M S(TRAIN B)

LOWER GOOD 37 LP942A S'JMP B II4L 214 IMS(TRAIN Al LOWER GOOD 38 LO943A SUP B LEVEL 214 ItOES(TRAIN BI LOWER GOOD 39 T9499A RCLA HOT LEG TEPPERATURE 621.9 GOOD DEGF 40 Te410A RCLB HOT LEG TEMPEPATURE 599.4 GOOD DEGF

- 41 Tf458 RCLA COLD LEG TEPPERATURE 549.4 GOOD ICGF i

42 Tf451 RCLE COLD LEG TErrERATURE 549.2 GOOD DEGF 43 TAVSAWID RCLA TAVG (THOT/TCOLD WIDE RNGl 575.2 GOOD DEGF

o i

i EPIP 1-5:lE, PPCS EVENT 1 AND EVENT 2 PRINTOUTS

. c FA0@ N@E GROLP DESGIPTION Page 2 of 3 l

EVENT!

PROCEDLIE: EPIP 1-5 PtJAT STATUS PolkT ID DESCRIPTION CLERENT VALE QLALITY CODE ENCA UNITS I

44 TAVGBWID RCLB TAVG (TH0TITCOLD WIDE'P O 573.8 GOOD DEGF 45 LRV REACTOR VESSEL ABAGE LEVEL 188.5 GOOD I

46 TCCORE E!.1 ICORE TC AVERAGE TDP 682.8 600*

DEGF 47 FAUIFWA S/S A TOTAL E'I FEEDWATER R0W 9.

600D GPM 48 FAUIFWB S/6 B TOTAL AUI TEEDWATER ROW 13.

GOOD GPM 49 SkRf81 MTR AUIILIARY FEEDhATER PLff A 0FF GOOD 50 BKRf82 MTR AUI!LIARY FEEDWATER PurP B 0FF GOOD 51 V35f5 AUX FW PUMP STEAM SLPPLY VALVE A CLOSED GOOD 52 V3594 AUI FW Ptte STEAN SLPPLY VAL E B CLOSED GOOD 53 FSIA SAFETY INJECTION 100P A AV5 FLOW 9.

GOOD GPM 54 FSIB SAFETY INJECTION LOOP B AVG FLOW 96.

600D GPM 55 P2166 SERVIE WATER PLFPS A & B EADER 75.

GOOD PSIS 56 P2161 SERVIE WATER PtfPS C & D EADER 79.

GOOD PS16 57 BrRf41 SERVIE MTER PLff A 0FF GCCD 58 BKRf42 SERVICE MTER PLFP B ON GOOD 59 f*R543 SERVICE WATIR Ptff C ON GOOD 68 BXPJ44 SERVICE WATER PlfP D ON 600D E-0-3

s.

y

-l.l EPIP ' 1-5: 17 '

PROEAM NME :LRGTSI.E c

'l

~

R.E. 61 2 4 Nut 2IAR POWER PLANT' PPCS EVENT 1 AND EVENT 2. PRINTOUTS Page 3 of 3

)

)

TREND GRXP ASS!GMNT SUTHRY i

i

.d GROLP NAE GROLP DESCRIPTION EuENT2 PR02DLRE: EPIP 1-5 PLANT STATUS POINT ID DESCRIPTION CURRENT VALLE GtMLITY CODE ENGR LNITS 1

Ff619 C0f0ENT COOLING LOOP TOTAL FLW 1235.

LALM GPM

.1 2

LRWST REFLELING WATER STORE TAE LVL 91.5 600D 1

3 WSf33 33 FOOT LEVEL WIND SPEED 5.9 GOOD tFH 4

0 833 33 FOOT LEVEL WIND DIRECTION 222.

GOOD DEE.

5 WTf33 33 FOOT LEVEL TDPERAftflE 61.2 6000 EF 6

WT259 250 FOOT LEVEL TDPERATLRE 69.2 GOOD EGF 7

OT2 250 TO 33 FOOT LEVEL DELTA TDP

-1.8 GOOD DEF j

8 Rf1 AREA 1-CONTROL lt00M B.7711642-GOOD m/H 9

RS2 AREA 2-CONTAI E NT 7.69332+99 GOOD m/H e

If Rf5 AREA 5-SPENT FLEL PIT 3.29217-81 6000 m/H 11 R89 AREA 9-tETDOWN LIE MONITOR 5.3122f+ft GOOD m/H j

12 R34 AREA 34 - AUI BLIE CV SPRAY PlfP 9.69978-#2 6000 m/H 13 R35 AREA 35-PASS SArFLE PAEL 1.16946-82 GOOD m/H 4

14 R!#A CONTA!WENT 10 DIE MONITOR R194 2.99497 4 3 600D CPM,

i 15 R11 CONTAll#Oli AIR PARTICl1 ATE 2.73723+f3 GOOD CPM.

16 R12 CONTA!!fENT GAS 10NITOR 4.6326E+03-6000 CPM

)

17 R1PB PLANT VENT 10 DIE MONITOR R!fB S.68627+88 600D CPM 19 R13' AUX BLD6 EIHAUST AIR PARTI (ILATE 5.99155+0!

GOOD CPM l

19 R14 AUI BLD6 E!HAUST GAS MONITOR 2.9932B+61 600D CPM 4

28 R19 LIQLIID WASTE DISPOSAL MONITOR 4.41234 53 6000 CPM 21 R19 STEAM IEERATOR ILONDOW DRAIN 1.63695 4 3 600D CPM

'l 22 R29 AREA 29-CONTAINENT HIlfi RANGE 1.98605+88 6000 R/m i

23 R39

' AREA Jf-CONTAll#ENT HIBI RApdE 9.99495-#1 60C0 R/m 24 R15 CONDENSER AIR EET0R E!HALET 3.96788+f2 6000 CPM l

25 R12A5 CV VENT CHAN 5-LOW RANE GAS 2.69253-98 600D UCI/CC l

26 R12A6 CV VENT CHAN 6-AEA 8Affl4 3.8738442 GOOD M/S l

27 R12A7 Cf VENT CHAN 7-MID RANEE GAS 3.59382 4 7 GOOD LE!/CC 28 R12A9 CV VENT CHAN 9-HIiDI RADEE GAS 7.1837943 GOOD LCI/CC I

29 R14A5 PLANT VENT CHAN 5-LOW RAME GAS 3.57461 4 7 6000 UCI/IE 30 R14A7 PLANT VENT DWI 74110 RSEE 6AS'

-1.4328-f5 GOOD (CI/CE i

31 R14A9 PLANT VENT DelN 9-HI91 RMEE 6AS 8.f3471-93 GOOD UCI/CC

=;

32 R15A5 AIR EE70R CHAN 5-LOW RANE GAS 4.67476-06 6000 UCI/CC i

33 R15A7 AIR EETDR DMN 7-MID RNEE GAS 7.f6185-f5 6000 UC1/CE 34 R1549 AIR EETOR CHAN 9-HI R4EE GAS 1.15729-53 000D UC1/IE 35 R31 AREA 31 STEAM LIE A (SPINE) 1.59986-84 6000 m/m 36-R32 AREA 32 STEAM LIE B (!PIDED 3.79955 4 3 6000 m/E 37 CWI CV FfDRDIEN CONCENTRATION of GOOD 1.

38 TCvf3 -

CV BASDENT LEVEL 6FT TDP 93 94.4 GOOD DEF '

=j 39 TCVf7 CV INTEREDIATE LYL 6FT TDP 87 198.3 GOOD DEF

.j

' 40 TCVfB CV INTDIEDIATE LVL 6FT TDP 98 196.6 GOOD DEGF Jl 41 TCve9 CV INTDIPEDIATE LYL 6FT TDP 99 185.0 6000 KF 42 TCV10 CV INTDIEDIATE LVL FT TDP 818 99.6 GOOD DEF 43 TCV17 CV QPOIATING LEVL FT TDP 917 198.8 GOOD KF i

i

.~

't v!

.o EPIP 1-5:181

,. d Page 1-of 1.

l OBTATwING EVENT 1 and EVENT 2 PRI==ivEf5 FROM THE COMPUTER fPPCS)

To review EVENT 1

[

' Type CD return Computer response - ENTER NAME OF GROUP.

Type EVENT 1 return 4

Computer response - SELECT FUNC. KEY

-[

t To print EVENT 1 Type GASR return Computer response - ENTER GROUP NAME i

Type EVENT 1 return I

Computer response - SELECT PRINTER LOCATION l

Press F1 - For Control Room, F2 - EOF, F3 - TSC To review EVENT 2 l

i Type GD return Computer response - ENTER NAME OF GROUP

.i Type EVENT 2 return

^

Computer response - SELECT FUNC. KEY To print EVENT 2 Type GASR return l

Computer response

- ENTER GROUP NAME Type EVENT 2 return 1

Computer response - SELECT PRINTER LOCATION Press F1 - For Control Room, F2 - EOF, F3 - TSC l

I You now have copies of EVENT 1 AND EVENT 2 Using Attachment 3e, complete Event 1 Supplemental Information.

i EPIP 1-5219

. e i

Page 1 of 1 EVENT 1 SUPPWMENTAL INFORMATION 1

61 AUX FEEDWATER SYS INSERV/

STNDBY/

OOS 62 SAFETY INJECT SYS INSERV/

STNDBY/

OOS 63 DIESEL GENERATORS INSERV/

STNDBY/

OOS 64 CV FAN COOLER SYS INSERV/

STNDBY/

OOS 65 SERVICE WATER SYS

_INSERV/

STNDBY/

OOS 66 POST-ACC CHAR FILT DAMPRS OPEN/

CLOSED 67 CV SPRAY PUMPS INSERV/

STNDBY/

OOS 68 COMPONT COOL SYS INSERV/

STNDBY/

OOS 69 DC SYSTEM A

v B

v 70 NAOH TNK LEVEL 71 BOR ACID TNK LEVEL b

TIME COMPLETED BY TIME TELEFAXED 1

-l ELANT STATUS REf' ORT EPPCS NOT AVAILABLE) l REACTOR l l

lAUNILIARY l INSERVICE l

l RADIAfl04 MONITOR READINGS I

D MUTDOVW l YES / NO TIME l lFEEDWATER l STANDBY l

1R-1 CONTROL ROOM Mree/hrt lR.C.S.

l l

ISYSTEM i

005 l

1R-2 CONTAINMENT Mres/hrl l PRES $URE I PSIG l l SAFETY l

INSERVICE l

lR-9 LETDOWN l

lPRZR l

l l INJECTION l STAND 8Y l

l MONITOR Mrea/hrl lLEVEL l

II l SYSTEM I

003' l

lR10"A" CONTAINMENT l

l CORE l

l l DIESEL l

INSERVICE l

1100lNE CPMI ICIRC.

I FORCED / NATURAL i l GENERATORS l STAND 8Y l

lR-11 CONTAINMENT l

l l

l I

l 005 l

l PARTICULATE CPMI ISUBCOOLEDI

  • F l

l$ERVICE l

INSERVICE l

lR-12 CONTAINMENT l

l"A"S/G l l

l WATER l

STANDBY l

IGAS CPMI I LEVEL l

%I ISYSTEM l

005 l

lR-10#38 PLANT VENT l

l=s= $/G l l

lC.V. FAN l lNSERVICE l

110 DINE CPMl l LEVEL l

%l l COOLERS l

STANDBY l

lR-13PLANTVENT l

l=A=S/G l l

l SYSTEM i

OOS I

IPARTIEULATE CPMl

} PRES $URE I PSIG l l POST ACC. l DAMPER DAMPER l

lR-14PLANTVENT l

l=sa S/G l l

lCNARCOAL l OPEN

/

CLOSED l

lCAS CPMl IPRESSURE I PSIG l IFILTER l

l lR-29"A" CONTAINMENT l

l0NSITE l

l lC.V.

l INSERVICE l

lMIGN RANGE R/hrl IPOWER l

EDG / TURBINE l

l SPRAY l

STANDsY l

lR-30"B" CONTAINMENT l

l0FFSITE l l

l PUMPS I

005 I

lMIGH RANGE R/hrl IPOWER lAVAILABLE/UNAVAILABLEl l COMPONENT l INSERVICE l

lR-15 AIR EJECTOR CPMl lC.V.

l l

l COOLING l

STANDeY l

l*R-12ASPING l

l PRES $URE I PSIG I ISYSTEM I

003 I

l CONTAINMENT GAS ue/cel l SUMP"A"l l

lD.C.

l l

l*R-14A SPING l

ItEVEL I

FT I ISYSTEM i

VotTSI IPLANT YENT GAS uc/ccl l SUMP'B'l l

lNe0NTANKl l

l*R154SPING l

ILEVEL I

IN l ILEVEL l

II LAIR EJECTOR GAS uc/ccl IRCS TEMP i "F l lRWST l

l lR-31 STEAM LINE 'A' Mrea/hrl IRYLIS l

Xl l LEVEL I

%l lR-32 STEAM LINE "B" Mrea/hri lCET I

'F l

l5.A. TANK l l

hEVEL I

Il DATE l WIND SPEED MPN l l WIND DIRECTION (FROM)

DEGREES I TIME COMPLETED R/hr = 50ENTGEN/NOUR MEMPERATURE33FT

  • F l uCf/cc = MICR0 CURIES /CURIC CENTIMETER ITEMPERATURE 250 FT
  • F l COMPLETED BY Mres/hr a MILLIREM /NOUR CPM = COUNTS / MINUTE
  • SPING UNIT READINGS MAY BE DELETED IF RADIATION MONITORS R-12 & R-14 ON SCALE

l l

EPIP 1-5821

.~

a Page 1 of 7 1

TECHNICAL SUPPORT CENTER CALL LIST i

USE OF ATTACHMENT 43 1.

When requested by the Control Room, the Gas Dispatcher shall initiate the Site Contingency Call List Attachment 4a for TSC engineering support.

l 2.

The following question must be asked of each person called.

"We

}

need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are i

requesting that you standby so you can be notified for the next e

call-in shift.

There is an emergency situation at Ginna, please report."

3.

If the individual is not at home, leave a message to have the individual contacted and to call you at your number.

1 NOTE:

Attempt to call the personnel designated as the primary responder for each position.

If the primary responders are unavailable, call other personnel qualified for the position.

1 4.

The call list contains six functions which must be filled first:

5 a.

TSC Director

~

I b.

Technical Assessment c.

Operations Assessment d.

Plant Maintenance Assessment e.

TSC Communicator f.

Survey Center Manager 5.

Call down the list and mark an X in the function box for indi-viduals answering call.

6.

If you cannot reach anyone at home to fill a function, call the l

pager.

This is done by calling their pager number and after hearing 3 beeps, enter the call back number.

An example of a pager message would be:

Call the pager and wait for 3 beeps.

Enter "7248523" or the appropriate Gas Dispatcher call back i

number.

Then press the # key to send the message.

7.

If the six functions on the call list are not filled when you complete the list, repeat calls to missing functions.

^

8.

When you have filled the first 6 functions, notify the Ginna Control Room, ext.235, that you have done so and the list of individuals contacted.

9.

Fill the 5 remaining positions.

\\

l i

1 I

i

~

EPIP 1-5:22 a Page 2 of 7 TECHNICAL SUPPORT CENTER CALL LIST NOTE:

The following question must be asked of each person called "I need to remind you of the fitness for duty requirements. Are you available for duty at this time?"

"If not, I am requesting that you standby so you can be notified for the next call-in shift" i

THERE IS AN EMERGENCY SITUATION AT GINNA, PLEASE REPORT" TSC Dractor Technscal Ow4ons Mair% --

Survey Cerver TSC 85C Electreal Mecherucal/

Computw Admanistration secuty Assessment Assessment Assessment Mensger Communicator Assessmert Hydrahc Analyst Commun Manager Manager Manager Manager Assessment Manager

>cg Primary

, gi;g }nemsmaMajg(l;gg jgq ggjggpqpg39 " ggg;g igp igg gem {ggggggdagw{]l aas h

was

~74 agss El

@M! ${$$$$$M$$$$MM$!f@hT@)

P,,

, M~g fy9p n 4m nnnn i n n%gg&n.vgb,g&yhy n

r*>m.quesn,emme ggahpg c

gg,a a a

u gggyQ regw 71m -72e j

g pygg g

7 Tom Mariew 6,m,.

j$g;ge:q-gl.g?5$

rW F g" a

c]

.Pri [:wAy;^~s-j;*h Qh

_am Hcrne 1

S'-

a@3e e

o 7

- -*.g e.. -

w.u. a gg, M;r r mwr rv

~

.=

m m.

s g

x n

I*3*'

sI k-wn my alm' f

_m Tom H es gjggj;. pfjmgry

[Mgg,

{ggggg!

\\op[hkyhkdko[:p$w$-

g g;j Q -;{ g {

r*- seemene c $ e$ 5M c

~

%p$g#ny%%

w

- w P'9" 71 N 1-7831 Pih 1 M;

dQ M f h

( k

_k__

IkMIIk k

'er h' ~ ~

N' N N -'

Paon

+

a

EPIP 1-5:23

. a Page 3 of 7 TECHNICAL SUPPORT CENTER CALL LIST NOTE:

The following question must be asked of each person called "I need to remind you of the fitness for duty requirements. Are you available for duty at this time?"

"If not, I am requesting that you standby so you can be notified for the next call-in shift" THERE IS AN EMERGENCY SITUATION AT GINNA PLEASE REPORT" TSC Otreetor Techrecal Cyo,.u =

Maintenance Surwy Ce Wer TSC 8&C Electrical M.,C

-M Computer ' dmenestratkwi Securty Assessmert Assessmert Assessment Manager Communicator Assessment Hydratic Ansept Commurt Manager Manager Ms.hger Manager Assessment Ma y Primary

.y 3RQggg gl Adelmm se,g efEis jp f

4 ssdesgS] h idkIQItd

~ 7i -

Spq jg Primary ggggsfj

& g n y g, d g g gyK@gAbg ggg@g/;gy) : "

g4*

fgntu; ngy%pg (4 jgiyQ p

byg ngd wiise2c7mr Rg y gn gx T

=-

-MW ~ W

> erimary

]

~

% %., T 2;f i -. ~.&-4, ^ ' - -1

  • II Jl ' a, L f..

Paul Garted p

pfggggy Home M 1~^

'A

?

~

nig' m: $ $

Pager 71&2361381 l

' *dV o

kw

a.,,,M. --....

- ~. -

.s w-4

-z e

u s.

s m

72 2~

L

- gw g de g

Mhj f

_ 7[

.m.n Prime,y m= : w. my:;r -r#

m e!,

e Pager 716-0217486

~

g$ 4:ypf,p(([v n..

. ~ -.

d

([

.. idyid - l-d

> ;. ~-

e 9

9 h

9

+

EPIP 1-5:24

' a Page 4 of 7 TECHNICAL SUPPORT CENTER CALL LIST NOTE:

The following question must be asked of each person called "I need to remind you of the fitness for duty requirements. Are you available for duty at this time?"

"If not, I am requesting that you standby so you can be notified for the next call-in shift" l

THERE 13 AN EMERGENCY SITUATION AT GINNA, PLEASE REPORT" TSC Director Techrucal Operatons Maintenance Survey Cents lCommunicetor TSC l&C Electrical Mechanical /

Computer Adminstration Securty

[

Assessment Asseostnert A=c.cr r4 Manager Assessment Hydrahc Arwelyst Commun Manager l

Manager Managar Manager Assessment Manager Y

b' j

W k"%

' "h) l H

Ah,g

. f'hNi g g g?N'.seg g,qq.. t g Si I'"k' bh 3 W< i'N' b' b?

g Yf=

a%

khk$'seg;h' NNh

- *, b' k" )

Y* Qh f

yy%g yggpge jh p f

9 9. a r w 7io.233.iee3 gg.qmggaegg g j 77 ww w % e#

m r

m}g%hfy ow erimary mem

.<y{feay#

h uitaa&ew w m es a

gy.,. z F*mesillINEar sGw{gj[n pe%

t I et

]y1 e pgg hfg a ca q rW=* 3

- L N

j gygf m

gg{

g{ gjfQgjkg Pagw /18-921.M g QQ h

,,J y

Mary Eden Denpier _

Jgrigpqt yygggyp.,"afgh gg

~ ' m }p3 primary [-

b$MMa@ [Q " #@ $m ~ YIN $NIS i

4!

h y

p wa s; n.

sq yls:.

a n4 g

m,a sy$$Vq,, yg pm;,yg

?eMd @g ypq'M68 IEjDMAI $!

- I WMQF5INEN v r

(Agf P gw7asm e

n gam m mm m e@nga

~m.

'h92I-SSN Wh M h

h WWM hf hh $hb

<[

P ww.enes WgnE 20 $ ~ (p*

i 79 Primary p@WS 1

Y W % %%$ $~ h Q-. M rfGA m

y4w xv ;

r e,7i 2,.ui y

l

[

l l

t i

v

+

EPIP 1-5:25 '.

. a Page 5 of 7 TECHNICAL SUPPORT CENTER CALL LIST NOTE:

The following question must be asked of each person called "I need to remind you of the fitness for duty requirements. Are you available for duty at this time?"

"If not,I am requesting that you standby so you can be notified for the next call-in shift" THERE IS AN EMERGENCY SITUATION AT GINNA, PLEASE REPORT" TSC Drector Techness operations Mersonance Surwy Center TSC l&C Electncal Mechenscent Computer Securty Asocosment A-

.-; Aoeosomert Manager Commurdeator Aseeeement Hydra 5c AneyW Commun ManeGer s

Manager Monme=r M= nae =r As===*m**

Monasar IlrWan s %"..

>v au

....._,..s..

..,..,.m..

_x..

E M BE ERW Mt M ER4E X ?1; s

gggggggqqragermg 7 I

11 gggtjg yn_gg

~

i n.

'c

.e,

~n.

-,, y w.

p[$ f... ?

.h

?-

,f. M

$$i.... s :h' h$ <

3;-

l

, gm.,...

~

9

...).

? :*.

N.

^

i l

z.

i l

1 l

h

.m.

m m

.___________,m

,m

.-..-. --- _..-. - < ~.... - - -,

g;,m w..#gghikalli x

1,

. O s

e 4

4 9

q y@ %

ll..

O N

C

}

v 3-,

a en f 4

h.,

fu w ww. -g,. $e.;q,w. k w'. 9 w a

y..

2

>:w

%+.

o f4 4.

3 en "C qM3e,, y, s,"

4 7

p.

ys< e.09

.y%g%u,

n vg :p4*g, q%:pge

1 o

w= D to I

r&

3 p: w awpy

&,%.y y&f moL W u rue b

L

- Jg Q,, a h

&w.y m. e :,, M.Ug %w;~

y. l

_5 h:.: n

.GJ %.

. %9 yy M

5SM ! M:h8inD 7 $w yXdd<

e Adhh QQ W

W@1

~,. n.

P'y y

h

'}5- } m.._@k @.,yM M@S

.t w/4;r i

Q D

D f-b.m.

m

-2;

.s I

e
vQ'; V,)

m

+

m

%_. g C

C p.qw-gly s.-

Q g

m m:.r :ar n

jh.,.S y

, MyM,6, 4b b

b m -

c.

D h[-8

.n M

.., 3m r.,..w.n

n. :.;g..

o-

't

.. +

o c

m m

d.

~

m.M,, Vb.

ff.6%

h h )pv4;MM qw<%

w.

L y\\

NI

=

r c

r o

w:s ;<js y 2

b b

b

+ '.g ?

+u

d. 6 %w asi g

ww Mr < >

"t w

g3 M

% s ;gM My ; Mix gSK g

. js@g t?!:yT/$ gfddy w ;t o.. w m% mz$. &m(%%

E:

a-y T :& p j@.

W C

3 me 3*

O 2

i @m.w:qq n v4 9

a g a:x Kv: w. %g@;c QW g

.AA Wg yc ct I3 ca ww u h.

gg M g2 W

ow 4

Y ' h%v(. hM[ Nh hh. j', -9:h O-e g-

  • u;;

cry w

},

d %mSMh g%

1 4

u;_w.gy @M I.

_M o

a

,Q @

wo u.

g

,, A

'Q3

4 m x

$.:hm RQy%

f J

=C w@A e.W; 3*5&p Q My.;/TN

.:p m-h r

w m@p%g%.~y; -

y 4

a a e h

w% w mg: $g% e o.

2 r

W

$s s<

.i 5 gm

<{

y 3u w

W apc y:

9y4 et mm e y,a s p. mmem.,a.

y y%

e4 o

z

~, a g

Ow y

m;fw;Q:

W D

p y

p.

pg::

9s

~

N hh

.fhhhk hhsh.

y 82 O

Oa z y 4 L:

b N x /k&. b @p

%ydg 3

M[%g 9,

i w

r w (g&& ){.Q LU Q,lc @

-d k.%[@

j W'Q y o

b k

C g

oE P

I k.h $$b 8 @:bNY.f k $$h$

e

, M) b g.

O t8o A

0 Wr;p 'q y e at

. W Me

0. EL 5u 3

%/n@9g g@,&-

b

,Q

,gr%gg "$ r* f:N; 4

m s ::

Mfp

't MM Wr:"%@?

a3 L

z sg 33 3 pg-3 o y >a m

hap

%g ga gym g%

y.

. 5* %@gs try ybo o

Mnf

$p% v p@..

3 m y

yq9 z

+l7 wQQ ig g:

t,

.J,a v>

w Ne g

M qi m

.o #

(

ag:A m

V o%,Q g

m yw "W

wI A.Nd4 3*W y Qy@s, I $ ~"Jl gg

yecca n@$R y

4%y$hA g#

'e

  • u u FC.

C E

pap

%%e 3 5g3 d

?

t E#%

C 5 M [*sg h "Qlf @Nd N h" W

Y ""

W$h.y 2<

2 Y

m-ECy M&

\\l$@f} f fQ-$tydf w

c >a mww apl.ffyQ:

m,&R"N w

$h*

my fga ng gpx 24, m

- g e

jQ.. ), W% f h$ kTU:f QW " f.eqf-E2 s

m m

p s cO.

m j

g agg & m ql% w a

g

.J wd

- w p.#e M MLg e

O hh V $'l"*%"**

v D

n

&&g w( ffyQ QQ Q9}&

m

'} 1 f

e>e y

3 y le p

w,.

., a m

mz,,g. mag l3 J

. ^ + +e&

b:sg y;e, a

O' _C n=

,}

g.., ym g

M.

p q p%j AW,:%

nQss ;e p oE2 y :; ;;4 M&:g;>y e-e, ky4.w.,; g:r e..p~

e r

~

li g&

m z:

C

%%;%" W >n.n 5kg: ; jdM%

g.,

Me>

v+

> w O =o a

_' W 2

.3 m

s y; p%am So

.Q [fj$n h

$ nit: 3 33.y Av t y% eMt

%.a,

g y

O, g

. i.

%s. o4,d,Y @Mfpp b NId o

f3

.p' q>:

M. $

w -- @.w W. d g;

w M

  • Q k,f.a N'? W hf. f.f $b' c

o fh, Hg s '*

w s.&.

a

?-

.,) ~.

me s 4.3,'s.%

YY :'s n m,,.

n W.. Myyy - 0y'

. p{fw &al4),W, e>

g~ - +-

,g.%9'; % :

-,y 4

r:;:,,

g-3p

,,m m

p Ei e

e F

o A

{

19 15 Z

't t

\\

a t-. t

't

. J.

A I.

_,E.

5 5

m _

1

x I

iI e

' i 9

7a ty y

-gt 24 i y r

r a

5t u

n c r e

S 'k.

im e

1 r

Pm I h P

Pc I'.

Ea

'vmbrmsAh $

t

e

u..

t n

A M.

y i Mh

?

A gm

%pMi $

r s

e B

{

t

.C".

g

$l$

?"

te Y y,

+P m

m4 yag r

MM 4

%if R '

e u

7 M

p i

M[f

^

oA f

n R

t mn C

s i

yn i

h tk t "t ua

  • e,a?n% @@h $

n v

a, r

gI T"

t a

f ai cc a

nb yh R

m o. a mm s2 q$

. h t s u

O t

f n-c t dn P

o K #h $ $qh rM E

M A T

ol R

a y

$l,

&W Mk W s.y%

f S

c E

Wt

,n

+

W e

n 4h I

t S

e l

L b x Ms m

a e A

s n

E L

L Ee IyA @!n l

i s

L a e s

3 A

vh P

Cs

,. -u c%

kd W gNi C

ur A

l&A at t

s o

N o

r y

N t

wn

.n%

R of f

@h &

+

f a

E d

I c

Yw7 2

e e G

Cin T

ri

,M

wM Su nS dAi N

5+;

T T

o

~

f N :e o

A w

t

w F E

l s

w $k T

- n_,

at n N

C C cn A

e e O

r T

(n,

wn Hh e

nomb T

t j

I I-n R

N gu

.ag se n A

C w

e Sk

^

O r r a

$g$

ic U

y e

v h-j u

xw P

p T

e M

qu t

I P

heo S

u r

eg$

y' s*L k

r S

U c

y Y

si S

ayo C

et nu w% &h $

et l

us N

ner c r f

L fody E

amge A

rb n sa n @l $

y C dod G

e a4 sn t

ef R

nea E

,u Mh $

n s

a sM I

k N s sa E

MA st M

H a e s C enu

,t gm 8hM Mh %

fgl1Ij n

bt o N

er E

fi y A

vmg e

+M t

T set ass na hM

&@h uh a S

- sn t

I ea k

mf h ee E

OsM e,m gd Vh ps M

n t

n o A

i eE g R s

oun E

h it oi H

i 4 g%

2 $a.+w N@ \\

t sys e

T

. wr

$h[! $

Mn e

ude n

g sn u

a

on.

qniq 4

f

.a iw gmre T SM

%h $

ne A

La w

m i r 5

?

a 3.a Ak W oa g d ot w

u1 I

y ry$

w l

a l d

$nb o

t u

f e o e

bc% wo @@h N~

6k

?

e C

$mf e n n 5

C h

f h

b I

S T

"I "

T sF t

u a.

E.

i" t

T 7

e O

~

e-C+

N 7

re

~

uP poR

EPIP 1-5:28

,. b Page 1 of 4 HEALTH PHYSICS SECTION CALL LIST USE OF ATTACHMENT 4b 1.

Telephone Service Operator shall initiate the Site contingency Call List for Health Physics Section when requested by the Ginna Control Room personnel. They will request begin the Ginna Site Contingency call List.

2.

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift.

There is an emergency situation at Ginna, please report."

3.

If the Individual is not at home leave a message to have the individual contacted and to call you at your number.

HQII:

Attempt to call the personnel designated as the primary responder for each position.

If the primary responders are unavailable, call other personnel qualified for the position.

4.

The call list contains four functions which must be filled first:

a.

Oose Assessment b.

Health Physics / Chemistry c.

HP Tech 1 d.

HP Tech 2 5.

_ Call down the list and make an X in the function box for indi-viduals answering call.

6.

If you cannot reach anyone at home to fill a function, call the pager number.

This is done by calling their pager number and after hearing 3 beeps, enter the call back number.

An example of a pager message would be:

Call the pager and wait for the 3 beeps.

Entering "2321658" or the appropriate Telephone Service call back number.

Then press the / key to send the message.

7.

If the four functions on the call list are not filled when your complete the list, repeat calls to missing functions.

8.

Call down SURVEY TEAM LIST Attachment 6 until at least 12 individ-uals have been contacted and will report.

9.

When you have filled the functions and completed the list notify the Ginna Control Room, ext. 235, that you have done so and the list of individuals contacted.

EPIP 1.$:2g The follom fYSICS SECTION CALL Ligy Pa0 2 of 4 q

i need to remind you of the fit Mrson caded for duty at this timey

'dUfY requirements. Are you available to hat You standby so You can be notified for the next call-in shift..

"THERE IS AN EMERGENCY SITUATION AT Dm Assessmww Managw

"*** Phnce &

u --

Y M'r#5"'

Heam PW Fred Mis ICW n Hmw gggggggg ppjmgpy Pw 7sens.7so, m+ pee 5.Ih? '

~9 P

%g%*";&Ml%g% @@tew~

Dx nm A5 N??

Hwntt@n:y Primary U

_ Pacer 71Sg2s 7803 r*(f.#*N' g:@'

.s+

k$@Mh ;:

% j$

4

= *dW %jg -

Vm

?'

u:

Hm w. m

__Pw Primary gap n

as cmarr.,

.;qp Nl??nW9 &?%{if Primary b]

' ~ '

EEW: $$.hd A5h KESM Primary l

Horre D 71692 -

hiN V*hf@Fs'hyy$gp;p pef 3 tog <

dp?g@h ~%g) eh %t

%edW;g aQi

"~t. ownnic:q nswa,,an e n,.

g u

w r,a n,.,,,,

-e n.,

uare 9,%

Qg5igyfg9wp2

- y

ydh 3.a ;g l

D

$rggaisgbg&p%,RR 8%

n&R ?a e, 4 as a, _n 12F%it' }ltf%~W

" *n* +i* a a g;j.f4y.w-j.gej.

n pg i

I I

l l

i l

u.

?

EPIP 1-5:32 Page 1 of 6 SPECIALIZED NOTIFICATION LIST Medical 1.

Dr. Norman R. Loomis 9 5.24-2_881 2.

Dr. Daniel Koretz

.._ 9.-524-20.60 Homa 3.

Dr. Neal Smith 9-524-2881 Hone 7~~ ~~ N 4.

Dr. Ralph Brown 9-52.4-2881 Home

/.

5.

Ontario Volunteer Emergency Squad 9-524-3000 6.

Wayne County Emergency Dispatcher 9-946-5304 7.

Rochaster General Hospital, E=ergency Department Triage Nurse 9-716-338-2300 8.

Rochester General Hospital Main Switchboard 9-716 338-4000 9.

RG&E Medical Services Office Alternato Office Ansvering Services 71-8713 (716) 342-0140 (716) 266-3800 9.1 Dr. Robert W. George 9.2 Dr. T. K. Oates 9.3 Dr. Alexander Kurchin 10.

Newark-Wayne conmunity Hospital 9-1-332-2266 Police 1.

New York State Police Warning Point 9-518-4 57-2200 or 9-518-457-6811 2.

Canandaigua State Police 9-716-398-3200 3.

Williamson State Police 9-800-962-0810 4.

Wayne County Sheriff 9-315-946-9711 5.

Honroe County Sheriff 9-716-428-5511 l

i I

.. a

- e v

EPIP 1-5:33 Page 2 of 6 SPECIALIZED NOTIFICATION LIET (cont'd)

Fire Ontario Volunteer Fire Department 9-524-2592 i

i Westinchouse Emercency Resoonse Orcanization Notify one Westinghouse contact using list in order shown.

Provida-available facts to individual and provide updates.

1.

Nick Liparulo 9 7 -5 69 Director ESBU Emergency Home

Response

Hotline 9-412-863-3340 i

2.

Tom Clark 9-412-374-3340 ESBU Service Response Manager Home 6

l Car 9-412-551-5725 l

3.

Rose Cotton 9-412-374-6805 ESBU Emergency News Communications Home ENC Manager Hotline 9-412-327-5598 4.

Mike Young 9-4 2-7 -5081 f

ESBU Emergency Response Home Technical Support Manager L

5.

Rich Miller 9-412-374-4606 l

ESBU Emergency Response Home 6

l Logistic Manager Hotline 9-412-672-2180 j

Other 1.

Ontario Town Supervisor, R. Mogray Office Ontario Water Department J. Haywood Days 9-524-2941 9-524-8263 (Nights, Sundays

.& Holidays)

+

2.

Plant Protection Department l

Kodak Park 9-716-722-2122 t

3.

Wayne County Emergency Operations Center 9-946-5663

-a a

n EPIP 1-5:34 l

Page 3 of 6 l

SPECIALIZED NOTIFICATION LIST (CONT 8D) l i

4.

Director Wayne County Office Disaster Preparedness -

Thelma Wideman Home 6

5.

Honroe County office of Emergency 9-716-473-0710 Preparedness (NIGHTS, WEEKENDS & HOLIDAYS) 9-716-428-7200 6.

Administrator, Honroe County Home af5 M M Office of Emergency Preparedness Pager 9-716-428-5141 Mary Louise Meisenzahl 7.

University of Rochester Advance RAP Team -

i David Maillie 9-716-275-3788 Mg Home 8.

National Weather Service (Rochester) 9-716-328-7633 9-716-263-6808 (Buffalo) 9-716-632-2223 9.

Radiation Management Consultants Office 9-215-824-1300 Emergency 9-215-243-2990 Fax 9-215-824-1371 10.

Helgeson Nuclear Services, Inc.

9-415-846-3453 11.

Jim Zak (NSARB) 9-414-221-2853 12.

Dr. James O. Cermak (NSARB) 9-301-963-9457 Home sCgM 13.

Institute of Nuclear Power Operations 9-404-953-0904 9-404-953-0922 14.

American Nuclear Insurers 9-203-677-7305 15.

Head, Plans & Operations Office 416-965-6708 Emergency Planning Ontario Home

$ 2fif$ g @

Canada F.

B. Ali Off hours alternate:

Ontario Canada Provincial Police 416-965-5751

C EPIP 1-5:35 Page 4 of 6 SPECIALIZED NOTIFICATION LIST (Cont'd1 Conoany Personnel 1.

Allen, Jim Home 1

1: " F Photographer 2.

Anderson, Charles 711-8 QA Hanager Home a

3.

Beldue, Richard 711-0199 Corp. Nuclear Emergency Planner Home MM Pager 921-5511 4.

Burton, Robert 711-8397 Dept. Manager, Research & Science Home e6 5.

Filkins, Duane 711-8181 Hanager, Chemistry Services Home t%$ R 9 M Pager 921-8360 6.

Harhay, Andrew Ginna ext. 219 Hanager, Health Physics &

Home Chemistry Pager 238-1589 7.

Hutton, James C.

716-724-8082 Director, Prod. Engr.

Home 6

Strategic Planning 8.

Kober, Roger 711 8 tM-President Home Chief Executive Officer Summer 716-394-2587 9.

Lappan, George 711-8812 Manager of Public Affairs Home Og g 10.

McCoy, Will 711-8122 Dept. Manager, Quality Performance Home gh 11.

Mecredy, Robert 711-8069 Vice President Home

%$iffg@

Ginna Nuclear Production Pager 921-5514

/

, ~ n. n

.: ~

n.

n_ -

e e'

O EPIP 1-5:36 Page 5 of 6 SPECIALTZED NOTIFICATION LTST (Cont'd) 12.

Quinn, Bernard 711-8146 Corporate Health Physicist Home

-h Pager 921-7873 13.

Rebholz, David 711-8175 Photographer Home 6-e 14.

Smith, Robert 711-8074 Sr. Vice President Home N

Production and Engineering Pager 921-8317 15.

Snow, Bruce 711-8058 Division Manager Home 16.

Watts, Richard 711-8706 Director, Corp. Radiation Prot.

Home 6

Pager 716-921-5513 17.

Wilkens, Paul 711-8076 Nuclear Engineering Services Home e

Department Manager Pager 921-7933 Nuclear Recrulatory Commission 1.

Nuclear Regulatory Commission Region I King of Prussia, Pa.

9-215-337-5000 2.

Radiation Assistance Program Dept. of Energy Brookhaven National Lab 9-516-282-2200 3.

Commercirl Telephone Systems to NRC Operations Center (Via Bethesda Central Office.)

9-301-951-0550 4.

Commercial Telephone System to NRC Communications Center (via Silver Spring Central Office) 9-301-427-4056 5.

Commercial Telephone System to NRC Operator (via Bether Central Office) 301-492-8893

.=

~_

r y

EPIP 1-5 37

.j Page 6 of 6 i

SPECIALIZED NOTIFICATION LIST (Cont'd) i New York State r

1.

James Baranski, State Emergency Management Office (SEMO) 9-518-457-8909

_[

2.

Lake District, SEMO 9-315-331-4880 i

e 3.

Rochester Office

-l State Health Department 9-716-262-2010 l

4.

State EOC, Albany 9-518-454-3337 I

5.

State EOC, Dose Assessment 9-518-454-3321 (Engineers) 9-518-454-2176 l

(Main'Line) i federal Emercency Manacement Administration f

Emergency Information Coordination Center 9-202-634-7800 9-202-646-2400-i l

t a

s 5

?

k e

.,t

\\

j -i _,

.au i a

, +-ac 3 y u

\\

"y -^cl%M > Q -

\\

EPIP 1-5:38 Page 1 of 2 SURVEY TEAM MEMBER CAT.T LIST NOTE:

The following question must be_ asked'of each person

]

called.

"I need to remind you of the fitness for i

duty requirements.

Are you available to report for duty at this time?

If not, I am requesting that you standby so you can be notified for the next call-in shift."

"THERE IS AN EMERGENCY AT CINNA, PLEASE REPORT."

NAME PHONE NUMBER Beluke, Stu Bishoping, Gerald Bussard, Willard Carter, Steve Cologgi, Peter i

Combs, Gary i

Cook, Charles

~

Cordaro, Frank Edler, Jerry j

Ganskop, Dean f

i Garafoli, Dave Grzybek, John i

Hayes, Kirk i

t Joachir.:zyk, Tom i

Ti l

Klingenberger, Herman j

f Lauria, Anthony l

Leach, Michael Liese, John l

Magnuson, Kim I

Mastrella, Rich i

1 I

W. -.,.

- Q; ;<f*

..v.

EPIP 1-5839 Page 2 of 2 ggBVEY TEAM MEMBER CALL LTST (con't)

RgIg:

The following question must be asked of each person called.

"I need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, I am requesting that you standby so you can be notified for the next 1

call-in shift."

"THERE IS AN ENERGENCY AT CINNA, PLEASE REPORT."

Mazzeo, Jim l

Nichols, William Patrzalek, Andy Phelan, Pat Poulton, Sam Rothfuss, Chuck Stinson, Steven Teague, Terrell Zapetis, James (EOF) Burgess, Mary (EOF) Edwards, Nancy (EOF) Eldridge, Tammy (EOF) Soper, Tim

]

(ECF) Haverly, Gail I

Tj I

e i

i

.r p

e ROCHESTER GAS AND ELECTRIC CORPORATION GINHA STATION CONTROLLED COPY NUMBER PROCEDURE NO.

EPIP 3-6 REV. NO.

14 CORPORATE NOTIZICATIONS TECHNICAL REVIEW PORC REVIEW DATE il-ID ~ D

&YdW PLANT SUPERIN'fENDENT

\\ \\- \\ \\ '1 %

EFFECTIVE DATE l

CATEGORY 1.0 4

l REVIEWED BY:

THIS PROCEDGRE CONTAINS 70 PAGES l

j i

i I

m.

-, -m A

C EPIP 3-631 EPIP 3-6 CORPORATE NOTIFICATIONS 1.0 PURPOSE To specify the usans by which notifications are to be made to Rochester Gas and Electric Corporation Offsite Support Personnel, in response to an incident at the R.E. Ginna Nuc1 car Power Plant.

See Attachment l

1, Emergency Operation Facility Notifications.

2.O E]MTQHSJEILITI 2.1 The EOF / Recovery Manager is responsible for notifying personnel at a Site Area Emergency Level or higher or at his discretion using Attachment 2 during normal work hours and Attachments 2 and 3 during off normal hours.

2.2 The EOF / Recovery Manager is responsible for notifying personnel on Attachment 4.

2.3 The Nuclear Operations Manager is responsible for notifying personnel on Attachment 5.

2.4 The Corporate Spokesperson is responsible for notifying personnel on Attachment 6.

2.5 The Corporate Nuclear Emergency Planner is responsible for notifying personnel on Attachment 7.

2.6 The EOF Dose Assessment Support is responsible for ensuring the notification of personnel on Attachment 8 as needed.

2.7

.The Offsite Agency Liaison is responsible for notifying personnel on Attachment 9.

2.8 The Advisory Support Manager is responsible for ensuring the notification of personnel on Attachment 10.

2.9 The Engineering Support Manager is responsible for ensuring the notification, as appropriate, of personnel on Attachment 11.

2.10 The Manager of Response Engineering is responsible for ensuring the notification of personnel on Attachment 12 and 19 as needed.

.a

c, EPIP 3-6:2 2.11 The Staff Administrator is responsible for ensuring the notification of personnel on Attachments 13, 14 and 15 as needed.

2.12 The Manager of Construction Services is responsible for ensuring the notification of personnel on Attachments 16 and 17 as needed.

2.13 The Manager of Nuclear Licensing and Assessment is responsible for ensuring the notification of personnel on Attachment 18 as needed.

2.14 The Facilities and Personnel Manager is responsible for notification of personnel on Attachment 20.

2.15 THE EOF Personnel Coordinator is responsible for ensuring the notification of personnel on Attachment i

21.

2.16 The Facilities Coordinator is responsible for ensuring the notification of personnel on Attachments 22, 23, 24, and 26.

2.17 The Offsite Food Service Coordinator is responsible for ensuring the notification of personnel on Attachment 25.

2.18 The Purchasing Agent is responsible for ensuring the notification of personnel on Attachments 27 through 30.

3.O REFERENCES 3.1 EPIP 1-0, Ginna Station ~ Event Evaluation and Classi-fication 3.2 Nuclear Emergency Response Plan 3.3 10 CFR 26 4.O PRECAUTIONS Implementation of this procedure requires the specific approval of the EOF / Recovery Manager.

1.

v

c. w -

w

,s m w

y l

O EPIP 3-6:3 5.O PREREOUISI'rES 5.1 An emergency has been declared in accordance with EPIP 1-0, Ginna Station Event Evaluation and Clas-sification.

5.2 EPIP 1-5, Notifications, has been implemented.

6.0 ACTIONS 6.1 EOF /Rocovery Manager 6.1.1 Upon notification of an Alert Condition, the EOF /-

Recovery Manager should evaluate plant conditions, consider, at his option, beginning the EOF call in procedure by notifying personnel on Attachment 2.

6.1.2 Upon notification of a Site Area Emergency by the Ginna Station Control Room, begin the EOF call in procedure by notifying personnel on Attachment 2.

6.1.3 Upon completion of Emergency Response Organization call list other corporate personnel listed on Attachment 4 shall be notified as appropriate.

6.1.4.

Ensure call outs are continued to ensure all positions on Attachment 1 are filled.

6.1.5 Keep a log showing time, date and person (s) notified (Attachment 31).

6.1.6 The Ginna Plant Nuclear Safety Audit and Review Board shall be called into session as a result of the emergency.

6.2 Huclear Oparations Manager. Notifications t

6.2.1 Upon notification by the EOF / Recovery Manager that an Emergency has been declared at the Ginna Nuclear Power Plant, commence notification of pc,rsonnel on Attachment 5.

6.2.2 Continue call outs to ensure each position is filled.

j 6.2.3 Keep a log showing time, date and person (s) notified (Attachment 31).

i I

l i

f,

-EPIP 3-6:4 6.3 Corporate Spokesperson Notifications 6.3.1 Upon notification by the EOF / Recovery Manager of an emergency at the Ginna Nuclear Power Plant, notify personnel in accordance with Attaclument 6.

i 6.3.2 Keep a log showing time, date and person (s) notified (Attachment 31).

6.4 Corporate Euclear Emergency Plannar. Notifications 6.4.1 Upon notification by the Nuclear Operations Manager that an Emergency has been declared at the Ginna Nuclear Station, notify personnel in accordance with.

6.4.2 Keep a log showing time, date and percon(s) notified (Attachment 31).

l 6.5 EOF Doco Assessment Support Notifications 6.5.1 Upon notification by the Corporate Nuclear Emergency l

Planner that an Emergency has been declared at the Ginna Nuclear Power

Plant, notify personnel in j

i accordance with Attachment 8.

6.5.2 Keep a log showing time, date and person (s) notified (Attachment 31) 6.6 Offaite Agency Liaison Notifications 6.6.1 Upon notification by the Corporate Nuclear Emergency Planner that an Emergency has been declared at the Ginna Nuclear Power Plant, notify personnel in accord-ance with Attachment 9.

6.6.2 Keep a log showing time, date and person (s) notified (Attachment 31).

6.7 Advisory Support Manager Notifications 6.7.1 Upon notification by the Corporate Nuclear Emergency Planner that an Emergency has been declared at the Ginna Nuclear Power Plant, ensure that all personnel on Attachment 10 are notified and informed to report to their emergency work location.

6.7.2 Keep a log showing time, date and person (s) notified (Attachment 31).

m

m. # m_

g.mo y

.. m W

EPIP 3-6 5 6.8 Engincaring Support Manager Notifications 6.8.1 Upon notification by the EOF / Recovery Manager that an Emergency has been declared at the Ginna Nuclear Power Plant, notify all appropriate personnel on Attachment 11.

6.8.2 Advise personnel to proceed to the Engineering Support Center or other designated area as required.

6.8.3 Keep a log showing time, date and person (s) notified (Attachment 31).

6.9 Hanager of Responso Engineering Notifications 6.9.1 Upon notification by the Engineering Support Manager that a Emergency has been declared at the Ginna Nuclear Power Plant, notify appropriate personnel on 2.

6.9.2 Check off personnel contacted and provide direction on where they should report.

6.9.3 Depending on the circumstances, notify selected personnel on Attachment 19 at this time.

6.9.4 Keep a log showing time, date and person (s) notified (Attachment 31).

6.10 Staff Administrator Notifications 6.10.1 Upon notification by the Engineering Support Manager notify appropriate parsonnel.on Attachment 13.

6.10.2 Advise personnel to procec,d to their emergency work station or other designated area as required.

6.10.3 Those personnel desiynated on Attachment 13 shall notify their respective clerical and document control personnel on Attachments 14 and 15, respectively, advising them to proceed to their emergency work location or other designated area as required.

6.10.4 Koep a log showing time, date and person (s) notified (Attachment 31).

g,,. mw-w-wmm

-.~.n~

~

)

EPIP 3-6:6 6.11 Manager of Construction Services Notification 6.11.1 Upon notification by the Engineering Support Manager that an Emergency has bean declared at the Ginna Nuclear Power Plant, notify personnel on Attachment 16 as needed.

6.11.2 Advise personnel to report to their emergency work location or other designated area as required.

6.11.3 Upon arriving at the Engineering Support Center prepara to activate any or all personnel on Attachment 17, as required for planning, procurement, fabrication and construction.

6.11.4 Keep a log showing time, date and person (s) notified 1

(Attachment 31).

6.12 Manager of Nuclear Licensing and Assessment Notifica-tions 6.12.1 Upon notification by the Engineering Support Manager that an Emergency has been declared at the Ginna Nuclear. Power Plant, notify all appropriate personnel on Attachment 18 as needed.

6.12.2 Advise personnel to proceed to their emergency work station or other designated area as required.

6.12.3 Keep a log showing time, data and person (s) notified (Attachment 31).

6.13 Facilities and Personnel Manager 6.13.1 Upon notification by the Corporate Nuclear Emergency Planner that an emergency has been declared at the Ginna Nuclear Power. - Plant, notify the personnel o n'

- 0.

6.13.2 Request that these personnel report to their offices to avait further instructions.

6.13.3 Keep a log showing time, date and person (s) notified (Attachment 31).

6.14 EOF Personnel Coordinator Call List 6.14.1 Upon notification, the EOF Personnel Coordinator or his alternate will notify the people on Attachment 21.

F

-. - - +

.. ~,

EPIP 3-687 6.14.2 Advise these people to proceed to their emergency work station or other designated area as required.

6.15 Facilities Coordinator 6.15.1 Upon notification by the EOF Personnel Coordinator that an emergency has been declared at the Ginna Nuclear Power Plant, notify the personnel on Attachment 22 as necessary.

6.15.2 If outside company resources are required for logisti-cal support of emergency operations, direct that the organizations on Attachment 23 be activated as required.

6.15.3 Direct the Voice Communication Systems personnel listed on Attachment 22 to contact the telephone companies listed on Attachment 24 to coordinate the i

prompt establishment of needed communications connec-tions.

6.15.4 Use Attachment 26 to satisfy any general manpower requests as a result of the emergency.

6.15.5 Keep a log showing time; date and person (s) activated (Attachment 31).

6.16 Offsite Food Service Coordinator 6.16.1 Upon notification by the EOF Personnel Coordinator that an emergency has been declared at the Ginna Nuclear Power Plant, use Attachment 25 to satisfy the food services requirements of the emergency organization.

6.16.3 Keep a log showing time, date and person (s) activated (Attachment 31).

6.17 Purchasing Agent 6.17.1 Upon notification by the EOF Personnel Coordinator.

that.an emergency has been - declared at the Ginna Nuclear Power Plant, notify the personnel on Attachment 27.

6.17.2 Coordinate the delivery of diesel fuel to the Ginna Station using Attachment 28.

6.17.3 Coordinate the provision of vehicles for offsite I

organizations using Attachment 29.

c-n

,.e.,

w, __

e EPIP 3-6 8 6.17.4 If necessary, secure lodging using Attachmant 30.

6.17.5 Keep a log showing time, date and person (s) activated (Attachment 31).

7.0 ATTACHMFRIS l

1 Emergency Operations Facility Notifications 2

EOF / Recovery Manager Call List 3

EOF / Recovery Manager Pager Instructions 4

EOF / Recovery Manager Supplemental Call List 5

Nuclear Operations Manager Call List 6

Corporate Spokesperson Call List 7

Corporate Nuclear Emergency Planner Call List 8

EOF Dose Assessment Support Call List 9

Offsite Agency Liaison Call List 10 Advisory Support Personnel Call List 11 Engineering Support Manager Call List 12 Hanager of Response Engineering Call List 13 Staff Administrator Call List 14 Clerical Personnel Call List 15 Document Control Personnel. call List 16 Manager of Construction Services Call List 17 Construction Services Supplementary Notifications Call List 18 Manager of Nuclear Licensing and Assessment Call List 19 Engineering Support Consultants Call List 20 Facilities and Personnel Manager Call List 21 EOF Personnel Coordinator Call List

x, EPIP 3-639 22 Facilities Coordinator Call List 23 Outside Company Resources Call List 24 Telephone Companies Call List 25 Food Service Requirements call List 26 General Manpower Requests Call List 27 Purchasing Agent call List 28 Arranging Diesel Fuel Deliveries Call List 29 Arranging Vehicles for Offsite Organizations Call List 30 Arranging Lodging Call List 31 Personnel Activation Log 1

I e

e e

4 p

i

EMERGENCY OPERATIONS FACILITY NOTIFICATIONS EMERGENCY EPIP 1-5 Coma OPERATIONS ATTACHMENT 3E 4--

ROOM FACILITY FAXED TO:

1.

NOTIFICATIONS EM 1,2 AND TECHNICAL EPIP 1-5 SUPPLEMENTAL i

ATTACHMENT 3A SUPPORT REMTS CENTER FAXED TO:

@ECS O

4F NOT C^T "

WAYNE COUNTY WAYNE COUNTY WAYNE COUNTY NR 1

i 4

E S LINE MONROE COUNTY MONROE COUNTY MONROE COUNTY

-w NEW YORK STATE NEW YORK STATE NEW YORK STATE VIA ERDS LINK 4

5 TECHNICAL SUPPORT h

CENTER k

Y i

.9 i

E 4

a

w,,

v x x.

_ ~..

a t

c EPIP 3-6:11 Page 1 of 3 EOP/REtMY MANM CAYL LTST EMERGENCY RESPONSE ORGANIZATION liQTE:

For a site Area Emergency or General Emergency, all positions must report to the EOF.

For an Alert, the EOF / Recovery Manager may consider having only the Emergency

Response

Organization and other selected positions report.

ligIE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

P.gpition Nane Phone Numbers Nuclear

1. Dan Klemz Office:

(315) 524-4446 Operations ext. 664 Manager Home:

N J3 D E 5 Hipp l

Pager:

(716) 921-8384

2. Bob Carroll Office:

(716) 546-2700 ext. 6628 Home:

(@TMP49 Pager:

(716) 921-7301

3. Joe Larizza Office:

(315) 524-4446 ext. 561 k?Cf, iAsf2EMD T

Home:

Pager:

(716) 921-0281

4. Gary D. Meier office:

(716) 546-2700 ext. 6622

@ 57 M,WW

. %(716) 238-1325 Home:

Pager:

5. Richard Beldue Office:

(716) 724-8199 i

Home:

f'llNUSM Pager:

.(716) 921-5511

6. Bob Mecredy Offices (716 724-8069 i

Home n':

9. *r. 4 Pager:

(716) 921-5514

7. Wesley H. Backus Office:

(315) 524-4446 ext. 302 Home:

difp3$hi&Wagtph Pager:

(716) 921-5512

c' r

EPIP 3-6312 Page 2 of 3 EOF / RECOVERY MANAGER cATL LIST NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Corporate

1. John C. Noon Office:

(716) 724-8031 Spokesperson Home:

, GEM 6dJE Pager:

(716) 921-5522

2. Michael A. Power Office:

(716) 724-8828 Home:

b3liiSW6 i

Pager:

(716) 527-5952 f

Car Phone:

(716) 729-3449 3.

Stan Spector Office: (716) 771-2126 Home: 4 fd $$ $',$lR*. @

4. Mike Kennedy Office: (716) 724-8417 i

Home: (fg M CJ3

5. Richard C. Peck Office: (716 724-8813 Home:

n-Pager:

(716) 546-2700 ext. 770208 Car Phone:

(716) 729-5175 Engineering 1.

Paul C. Wilkens Office: (716) 724-8076 i

Support Home:

[MMMM Pager:

(716) 921-7933

2. Will.iam L. McCoy -

Office: (716),724-8122.

p(716gg,M Home:

J 396-1053

.l or:

Pager:

(716) 783-7285

3. Charles R. Anderson Office: (716 724-8119 Home:

?.

M W Pager:

( 16) 783-7281

4. Leonard Sucheski Office:

6(716) 724-8112MM Home:

5. Gary Goetz Office: 6(716) 724-8073 Home:

Other:

(*(16) 659-2630

6. Charles Forkell Office: (716) 724-8098 Home:

gg

7. Gene Voci Office: (716) 724-8080 Home:

M

7 g.

.. n -.

vnn.

,n,

...g.

~

~~,y

/

t EPIP 3-6313 Page 3 of 3 EOP/ RECOVERY MANAGER

.C2&Ia_LI.iET NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

OTHER IMPORTANT NUMBERSJ, 1.

Ginna Control Room (716) 546-7848 (716) 546-7842 2.

Bob Smith Home:

N Pager:

(716) 921-8317 Office:

(716) 724-8074 3.

Tom Swartz Office:

(716) 724-8867 Home:

M^h Pager:

(716).921-5523 4.

Richard Baldue Office:

(716) 724-8199 Home:

$ 1d W E 9I M I6 8 E %

Pager:

(716) 921-5511 5.

Bernie Quinn Office:

(716 724-8146 Home:

4 Pager:

(716) 921-7873

.)

EPIP 3-6 14 Page 1 of 1 E9f/RECvvrMY MANAGER PAGER INSTRUCTIONS INSTRUCTIONS If pager calls are necessary:

Call the pager and wait for 3 beeps.

Enter the call back phone number you wish to be called back at.

Then press the # key to send the message.

P 0

k 2

b P

9 1

7- -

-c sm.

J t.

EPIP 3-6815 Page 1 of 1 EOP/REcuvrmY MANAGER SUPPLDENTAL car.r LIST l

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for i

duty at this time?

If not, we are requesting that you standby so you can be notified. for the next call-in shift."

.i INSTRUCTIONS:

Call sequence and phone numbers:

l 1.

Chairman of the Board Office:

6(716) 724-8714 Home:

2.

Vice President, Employee Relations Office:

h(716) 724-8751 and Public Affairs Home:

3.

Plant Protection Department -

Office:

(716) 722-2121 i

Kodak Park 4.

Institute of Nuclear Power Office:

(404) 953-0904 l

Operation (INPO) Emergency or Call Number for " Alert and Above" (404) 953-0922 action levels 5.

During regular working hours N/A N/A notify 49 East employees l

Proceed to lobby security desk and use Emergency Com-f munication and Evacuation System (ECES) l 6.

89 East Ave. Employees Offic':

(716) 724'-8751' e

Request Employee Relations

~

or Security to make' announcement using ECES Office:

(716) 724-8717

~

1 i

1 m-

- m

+

c_

f EPIP 3-6:16 Page 1 of 2 NUCLEAR OPERATIONS MANAGER CALL LIST HGTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you'available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shif t.

Position Name Phone Numbers Corporate Nuclear 1. Richard J. Beldue Office: (716) 724-8199 Emergency Planner Pager:

(716) 921-5511 Home:

4Mt&NM 2.

Peter S.

Polfleit Office: (315) 524-4446 ext. 108 Pager:

(716 238-1324 Home:

3. Richard Watts Office: (716) 724-8706 Pager:

(716 921-5513 Home:

4. Richard W. Morrill Office: (315) 524-4446 ext. 655 Home:

jegf$$UM 5.

Frank Orienter Office: (716) 771-2265 Pager: (716) 821-3915 Home: 6

6. Wes Backus Office: (315) 524-4446 ext. 302 a

2 Technical

1. Herb VanHoute Office: (315) 524-4446 i

Assistant to ext. 833 I

, Nuclear Operations Home:

7%% A Q 1 Manager

2. Ken Masker Office: (716) 771-6671 i

Home:

igL6 i

3. Neil Brehse Office: (315) 524-4446 ext. 189 l

Home:

5 i

4. Dan Klemz Office: (315) 524-4446 art. 664 Home:

65

5. John T,raynor Office: (315) 524-4446 ext. 6633 Home:

6 W4

4 y.

'r EPIP 3-6317

- E i

Page 2 of 2 NUCLEAR OPERATIONS MANAGER CATL LIST (con't) l i

6. Bob-Carroll Office: (315) 524-4446 ext. 6628 Home:

66 Duty Public Call the RG&E operator who has the Duty PIO Information Call List to determine who is on call.

Officer (PIO) t i

1 i

+

i i

i t

J 4

i i

--r y

+m y

-eg e

,,, y, g_,.

-v. %

. _ _.y y...__,,.-

,T EPIP 3-6:18 Page 1 of 2 CORPORATE SPOKESPERSON CALL LIST NOTE:

The following question must be asked of each person called.

"We need-to remind you of the fitness for duty requirements.

Are you available to report for.

i duty at this time?

If not, we'are requesting that you standby so you can be notified for the next call-in shift."

INSTRUCTIONS Upon notification by the EOF / Recovery Mant. gar of an amergency at Ginna Station, notify the following personnel to standby, report to the EOF, or provide other instructions.

News Center Manacer Frank Orienter Office:

771-2265 Home:

M Pager:

921-3915 David J. Whitlock Office:

724-Home:

John W.

Edmunds Office:

724-8864 Home:

M Summer:

437-5421 Lee M. Loomis Office:

724-8169 Home:

N Summer:

237-3796

~

News Center Managers Pager:

(716) 921-5521 Other Neubers W. J. Schrouder, Jr.

Office:

724-8751 i

Home:

N j

l Jack Noon Office:, 724-8031 Home:

6 Pager:

921-5522 Michael A. Power Office: 724-8828 Home: 48QF;6M Pager:

527-5952

'1 i

Mike Kennedy Office: 724-8417 Home:

gg Stan Spector Office: 77 -2126 Home:

i

1 r'

i EPIP 3-6:19

' ~

Page 2 of 2.

CORPORATE SPOKESPERSON CALL LIST Il2TE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for l

duty at this time?

If not, we are requesting that l

you standby so you can be notified for the next

-call-in shift."

5 i

Assistant to Corporate Sookesoerson Patricia A. Maier Office:

724-8827 l

Home:

6 Betty Weis Office:

771-2163 Home:

M Laurie Picardo Office:

724-8063 Home:

M i

Lori Lootens Office:

724-4963 Home:

6 Technical Assistant to Coroorate Sookesoerson r

Frank Maciuska Office:

(716) 546-2700 l

ext. 6651 Home:

Robert McMahon Office:

524-4446, ext. 338 Home:

M Pager:

783-7279 t'

Richard Morrill Office:

524-4446, ext. 655 Home: '

(fMM Was Backus Office:

'524-4446 302 6, ext.

j Home:

Pager:

921-5512 l

t Richard Beldue Office:

724-8199 Home:

N Pager:

921-5511 i

Terry Fulkerson Office:

771-6636 l

Home:

M

{

4 i

4 i

k

~

x ~~

r

~

~

Y EPIP 3-6:20 Page 1 of 4 CORPORATE NUCLEAR EMERGENCY PIANNER CALL LIST NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

INSTRUCTIONS FOR AN UNUSUAL EVENT Upon notification by the Ginna Control Room of an unusual event at Ginna Station, notify the following personnel:

Duty Public Information Officer Corporate Spokesperson and consider updating:

Wayne County Monroe County New York State INSTRUCTIONS FOR AN ALERT AND ABOVE Upon notification by the Nuclear Operations Manager.of an Emergency at Ginna Station, notify the following personnel to standby or report to the EOF.

Position Name Phone Numberg Offsite Agency

1. Tom Svartz

' Office: (716 724-8867 Liaison Home:

.Pager:. ( 16) _921-5573

2. Bobby Ellis-

' Office: (716) 724-8705 Home:

l

3. Clyde Forbes Office: (716) 724-8110 Home:

EM 4.

Elmer E. Adkins Office: (7.16) 724-8810 Home:

-n

..r.

..yn.c

,., m,

I t

EPIP 3-6821 Page 2 of 4 CORPORATE NUCLEAR EMERGENCY PIJLfMER CATL LIST NOTE:

The following question must_be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Facilities and

1. David J.

Irish Office:

716 724-8302 Personnel Manager Home:

g.

Pager:

16) 42 9
2. Jeffrey W.

Peters Office: (716) 724-8750

3. David S. Webster Office: (716) 724-8838 Home:

6 EOF Dose

1. Robert Burton Office: ( 16) 724-8397 Assessment Home:

~~

Support

2. Karen Sahler Office: (716 724-8684 Home:
3. Jeff Williams Office: (716) 724-8129 Home:

Qg Advisory

1. Jim Deni Office: $(716),7 4-5 Support Home:

Pager:

(716) 783-7510

2. Thomas Frantz Office: (71 L7_36 Home:

M8

3. Clifton B. Olson Office: (716 724-8954 Home: Af Pager:

(716) 921-79 9

4. Pault Ruganis Office: (716) 724-8019 Home:

gg@

5. Patrick callahn Office:

716.)

57 Home:

.1-

_. ~.

t EPIP 3-6 22 Page 3 of 4 CORPORATE NUCTEAR 2MERGENCY PLANNER 271 TJST FgtE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to rcoort for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Communicators

1. Donald R. Travis Office: (315) 524-4446 (2 Required) ext. 289 Homc:
2. Robert Dodge Office: (315) 524-4446 M

Home:

3. Diana Brunson Office:

(716) 546-2700 ext 006 Home:

listed) 4.

Sue Sales Office: (716) 546-2700 ext. 4892 Home:

M

5. Al Jones Office: (315) 524-4446 ext. 111 Home:

M 6.

Phil Brown Office: (716) 724-8144 Home:

@M Status Board

1. David Stone Office: (716) 724-8047 f

Keepers Home:

e (2 Required) l

2. Bernie Rivera Office:

(7.1 771-4020 Home:

M 3.

Dave Dennany Office: (716) 546-2700 ext. 4057 Home:

(

NOTE:

Communicators and Status Board Keepers receive similar training and can be used in either position.

-n-m,%

e p

m s

6 f

EPIP 3-6 23 E

Page 4 of 4 CORPORATE HUCLEAR EMERGENCY PLANNER CALL LIST NOTE:

The following question must be asked of each person l

called.

"We need to remind you of the fitness for

~

duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so.. you can be notified for the next.

call-in shift."

Position Name Phone Nnnhers Plant Computer

1. Deborah K. Zakrzewski Office: (716) 724-8238 Operator Home:

62 2.

Ed Hartin Office: (716) 771-2102 l

Home:

WM l

3. Tammy Woodruff Office: (716) 724-4489 Home:

ph?g

4. Peter Wierzba Office: (716) 724-4490 l

Home:

5. Diane Dunn Office: (315) 524-4446 ext. 619 Home:

i 4

e e

6

?

I i

?

s, EPIP 3-6:24 Page 1 of 2 EOF DOSE ASSPAN SUPPORT CATL LIST NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this tina?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Dose Assessment Manaaer Nelson Kiedrovski Offica: (716) 771-6661 Home:

N.MDa Pager:

(716) 921-5525 Bernard Quinn Office: (716 724-8146 4 /$r s Home:

+

Pager:

(716) 921-7873 Duane Filkins Office: (716) 771-2703 Rick Watts Offica: (716) 724-8706 a

3 Peter Polfleit Office: (315) 524-4446 ext. 108 Home:

Jh Pager:

L716) 238-1324 Marlin Clifton Office: (716) 771-2188 Home:

gaylii(@

Dose Assessment sucoort Karen Sahler Office: (716 724-8684 Home:

g:,**

.L Robert Burton Office: (716 24-8397 Home:

Jeff Williams Offica: (716) 724-8129 Home:

MMih Christine D' Ambrosia ice:

4-8 Kevin Hylton Offica: (71

'.~p 4 -8 4 2 8 Home:

38 %

_ _ _i_ _

.u_.l, _.. _..

y~_._..

l EPIP 3-6225

\\

Page 2 of 2 i

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Dose Assessment Suncort (Cont'd)

David Dakin Office: (716) 771-2707 Home:

6 Bill Prytherch Office: 6(716) 724-8133 Home:

Wendel Knoll-Office: (716) 724-8131 Home:

MfW John Prill Office: (716 771-2711 Home:

Mary Burgess Office: (716 771-2700 Home:

Nancy Edwards Office: (716) 546-2700 ext. 4176 Home:

Gail Haverly Office: (716 771-6606 Home:

Tammy Eldridge Office: (716) 546-2700 ext. f.992 Home:

Timothy Soper Office: (716) 771-2700 Home 6

Barb Butler Office: (7.16 -771-6637 Home:

M t

Yvonne Selbig Office:.(716) 546-2700 t

ext. 2145 Home:

't.n

' E.

f Janet Keller Office: (716) 7 2733 Home:

L n

b b

v vm

_t s

v.

.c EPIP 3-6:27 t

Page 2 of 2 OFFSI'm AGENCY LIAISON CATL LIST j

Offsite l

Technical j

Representative (continued)

Jana Neis Office: (716) 771-6646 Home:

I John Traynor Office: (71 771-6633 (Monroe Alt.)

Home' Mark Coleman Office: (716) 771-6581 Home:

Wil1*rd Ashmora Office: (716) 771-6582 Home:

Larry Briggs

' Office: (716) 771-6642 (Albany Alt.)

Home.

?

5 t

I L

h i

g EPIP 3-6828

, 0 Page 1 of 2 ADVISORY SUPPORT PERSONNEL CAYL LIST (Listed in Order to be Called) i NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for l

the next call-in shift."

S_uo_ervisor. Power Operations A. Fred Woodard Manacer. Technical Services t

Mike Whiteraft Alternates:

Gerald Glenn Home:

Office:

(716) 724-8854 i

EMS Senior Analyst Dana Grove Home:

Office:

(716) 223-9502 Alternates:

James Tyo Home:

Office:

(716) 771-2274 Duane Piede Home:

Office:

(716) 724-8950 7

6*

e ii k

i L

p-

~

EPIP 3-6:31 F 1 Page 2 of 5 Engineerino Sunoort Mannaer Call List IlQIE:

The follovi.ng question must be asked of ea h Are you available to report for duty at this ti"We c

person called.

quirements.

we are requesting that you standby so you can be n tifi me?

If not, the next call-in shift."

o ed for Mannaer of Nucl ar Safety and Licensing 3

George Wrobel

-Home R @ g; N 1

-Office AlternAtag (716) 724-8070 Robert Eliasz

-nomo Y

-Office (716) 724-8075 John Jorgensen

-Home 1

-Office (716) 724-8078 Glenn Hermes t

-Mome Q

-Office Tom Daniels (7.6) 724-8013

-Home

  • =:. ' u - ;

-Office Mark Plaherty (716) 724-8429 ce 6

Dave Wilson

-Home i.

-Office (315) 524-4446 l.

ext. 158 l

1 1

I i

l I

i

)

i 1

,/

w EPIP 3-6:35

. 2 i

Page 1 of 6 c

Manauer of Response Encineerina call List

}[QIE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next crR1-in shift.'

The following is a listing of telephone numbers for corporate engineering discipline managers and their alternates.

Mechanigal Enoineer

-Home Eugene K. Voci

-Office (716) 724-8082 Alternates Bernard J.

Carrick

-Home

?

-Office (716) 724-80 James Dunne

-Home

-Office 4-8 9

Thomas ?.. Newberry

-Home MM

-Office (716) 724-8091 Electrical Enuineeg charles Forkell

-Home M

-Office (716) 724-8098 i

Alternates Richard A. Baker

-Home

-Office (716) 724-8093 Ted Miller

-Home

(-

t

-Office (716) 724-8011 Brian E. Hunn

-Home 6

-Office (716) 724-8102 I

Nicholas Love

-Home MM

-Office (716) 724-8113 Structural Encineer Leonard A. Sucheski

-Home

-Office (716) 724-81 Alternates Mark B. Fitzsimmons

-Home Mg

-Office (716) 724-8111 i

y; 4

EPIP 3-6:36

, 2 Page 2 of 6 Manar7er of ResDonse Engineerina

_ Call List (cont'd)

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requArements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Daniel Zebroski

-Home

(-

~24- 0

-Office

(

Frederic R. Lupi

-Home

@]$fj&S f

-Office (716) 724-8109

)

e e

u, ~ x

= = - e n, sm EPIP 3-6:37

' 2 i

Page 3 of 6 Mananer of Response Enoineeriner Call _ List (cont'd) i EgIE:

The following question must be asked of each person called.

"We need to remind you of its fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Electrical Enaineerina Charles Forkell

-Home

-Office 716) 724-8098 Altgrnates Ron Appleton

-Home A(C '... ' ' ' ' ' ^

-Office (716) 546-2700 ext. 4004 Karen Cona

-Home

(

-Office (716) 546-2700 ext. 6079 Dick Baker

-Home

' (@M

-Office (716) 724-8093 Mt%

Ray Bozarth

-Home

-Office (716) 724-8437 Dick Campbell

-Home MM

-Office (716) 724-8067 Eleanor Davis

-Home M'MI

-Office (716) 546-2700 ext. 4021 Brian Hunn

-Home

($h'Q*,

- Office (716) 724-6102 tiy[ g') [ 2 E _

Nick Love

-Home

-Office (716 724-811 M.g Doug Martin

-Home

-Office (716) 546-2700 ext. 4497 Ted Miller

-Home

-Office (7

724-Nick Oliva

-Home M.. i ""-

-Office (716) 724-1

1l 9

EPIP 3-6838

. 2 Page 4 of 6 Manaaer of Response Enoineerina call List (cont'd)

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty.requiraments.

Are you available to report for duty at this time?

If not, va are requesting that you standby so you can be notified for the next call-in shift."

Joe Pacher

-Home

  • N8

-Office (716) 724-8426 John H. Smith

-Home M, i1 T -

-Office (716) 724-809T Dave Stone

-Home

(%WJEM

-Office (716) 546-2700 ext. 4059

y EPIP 3-6839

, 2 Page 5 of 6 Malingpr_ of Response Encineerina Call _ List (cont'd) gggg:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Structural Engineering Gary Goetz 8073 Mark Fitzsimmons Bill Fred Lupi 8109 Gene Po#P 811 4070 1

Len Sucheski 8112 Dan Zebroski 8000 8010 Ray Brown Chuck Holden 4070

e

-Ci N

EPIP 3-6841 I

i

- 3 Page 1 of 2

.i Staff Administrator Call List c

Ji tg:

The following question must be asked of each person called.

S "We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Beverly L. Hicks

-Home

-Office (716) 771-2247 Alternate # 1 Kathy McGinnis

-Home h

-Office (716) 546-2700, ext. 4951 AltaInnis # 2 Julie A. Mancuso

-Home I

-Office (716) 546-2700, ext. 4034 Alternate # 3 i

Tracy DiPonzio

-Home

-Office (716) 546-2700 t

ext. 4397 i

Jea'l Hatson

-Home

-Office (716) 724-8433 Alternate # 1 Angela Todaro

-Home 6

i

-Office (716) 546-2700, ext. 4007 Alternate # 2 relicia Volkman

-Home

-Office (716) 546-2700, ext. 4600 t

Alternate # 3 Bryan Bradford

-Home SM[

-Office (716) 546-27 ext. 4955 i

Sharon Paprocki

-Home 6

-Office (716) 724-8125 Alternate Diana Brunson

-Home

-Office (716) 546-2700, ext. 4006 l

e i

W

'EPIP 3-6342

, 3 Page 2 of 2 Staff Administrator spil List NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

h Jan McGlynn

-Home 6

-Office (716) 546-2700, ext. 4037 Alternate Donna Sellers

-Home MM

-Office (716) 546-2700, ext. 4982-i b

e 2

B I

M,

~ _ -

2 sj

~

EPIP 3-6 43

. 4 Page 1 of 1 Clerical Personnel l

Call List NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

l Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

ESC Messaae Center Coordinator Beverly L. Hicks

-Home glerical and Word Erocessina:

Janice McGlynn

-Home Kathy McGinnis

-Home Julie Mancuso

-Home Roberta Holahan

-Home Anna Gerega

-Home Leslie Cedrone

-Home Tracey DiPonzio

-Home Jennifer Perry

-Home XEROX COPIER SERVICE For 5065 and 1065 800-242-8930

~i Telecopier - 4th Floor

- 724-8405 41

.w i I

l

~ i 1

I

.tf, ^}

EPIP 3-6:44

, 5 Page 1 of 1 Document control PersonD d call List NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Document / Drawing Control

-Office (716) 546-2700, (4004)

Angela Todaro

-Home

[

ik ~ A-7 g ;, ! g g.:I

~

t 5

Bryan Bradford

-Home Felicia Volkmar

-Home 5 +n..m p g.

7 IBM COPIER SERVICE Series III, Model 40

-(800) 437-0005*

20

  • In off hours, calls to Service Board are routed to an Answering Service, who then contacts the service personnel.

x Technical Information Personnel 4

Call List h].y.{. y a..7.,a.3.,.

Sharon Paprocki

-Home C.O.".j

].?

,1,,.

l ' y f8/ [L.7$f?--

i14

,.. ; C; Diana Brunson

-Home cybe,jjMp,1 g

=4~,

-- ; i M

l 6

u.y rP m

EPIP 3-6:45

- 6 l

Page 1 of 1 Manaaer of Construction Services gall List i

NOTE:

The following question must be asked of each person called.

~ ^

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Gary Goetz

-Home

-Summer (716) 659-2630-

.n,

-Office (716) 724-8073 Alternate 1 A'

John IIotchkiss

-Office (716) 986-3984

-Office

.(716) 524-4446,

-'~~

ext. 349' 7'

Jim Gashlin

-Ilone (MIAM

-Office (315) 524-4446,- e ext. 273 A!

~~

~

Glenn Wert

-Ilome

-Office (315) 524-444 ext. 464 t

4 e

M t

5-w v.

l M

I

?

G..-

T-;

EPIP 3-6 46 j

> 7 Page.1 of 1

~

i

-t CONSTRUCTION SERVICES SUPPT.WIENTARY NOTIFICATIONS j

Call List l

't I

Leo Nadaan 2195 Bear Creek Road Ontario, New' York 14519 1

_[

(315) 524-3757

'I L

i Herb Brinkert 2369 Lake Road Ontario, New York 14519 l

-(315) 524-2601

{

t i

Boyd Shearer 7 Middleton Lane Penfield, New York 14526 i

=(716) 671-9347 s

'i

.I i

i I

i l

i i

'f I

i t

[

.I

-l L

i 4

I

va

~/

EPIP 3-6847

. 8 Page 1 of 2 MANAGER OF NUCLEAR LI.CFNSING AND ASSESSMENT CALL LIST NCrrE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to. report for duty at this time?

If not, i

ve are requesting that you standby so you can be notified for

~

the next call-in shift."

This Attachment lists telephone numbers for the corporate licensing and safety analysis staff.

.n.

Robert Eliasz

-Home

.~

.. $ Y g; g.[ ' '

-Summer 4

f ~"

f

~.

John Jorgensen

-Home George Wrobel

-Home 3

g 4

Glenn Hermes

-Home

, v J.,

.4 s

,=$-i ku Tom Daniels

-Home Y

Hark Flaherty

-Home g

Mike Kennedy

-Home h

j_'

y; Dave Wilson

-Home

.. (

f*

fi Ronald Jaquin

-Home

. " ~

r Brian Flynn

-Home

2 w.

N C,,

e.

3 M

M

--m.

EPIP 3-6848

, 8 t

Page 2 of 2 MANAGER OF NUCLEAR LICENSING AND ASSESSMENT CATT. LIST NUCLEAR ENGINEERING SUPPORT PHONE LIST AQyNICED NUCLEAR FUEL (EXXON)

John Floyd (206) 453-4441 Gene Jensen (509) 375-8477 WESTINGHOUSE - CNFD Telephone Name__

Title Nit =her-Michael F. Muenks Fuel Project Engineer (412) 374-2188 James R. Dwight (Jim)

Project Sales Manager (412) 374-2004 Lek Srinilta Core Design Engineer (412) 374-2169 Fred J.

Frank Core Design Engineer

-(412) 374-2013 Chris Sauase Core Design Manager (412) 374-2290 Carl A. Olson Thermal & Hydraulic Engineer (412) 374-2116 William Slagle Fuel Licensing Engineer (412) 374-2088 i

Earl H. Novendstern Fuel Analysis & Licensing Mgr (412) 374-2219 Robert L. Oelrich Fuel Analysis Engineer (412) 374-2526 Cris Lou Design Spec. & Drafting Engr.

ext. 3651*

Eugene W. Kirby (Gene)

Design Spec. & Drafting Mgr.

ext. 3233*

James Bush Columbia Customer Support Engr.

ext. 3622*

Jerry G. Miller Columbia Customer Support Mgr.

ext. 3295*

  • (803) 776-2610 plus the extension 4

e l

i i

e r

EPIP 3-6349 l

. 9 Page 1 of 2 ENGINr MING SUPPORT CONSULTANTS Call List Westinchouse Phone Numbers Carl Caso - General Manager Nuclear and Advanced Technology Division (412) 374-4775 R. W. Beer Mgr. Plant Elgr.

(412) 374-5115 Duane Alexander Mgr. Marketing and computer Services (412) 374-6104 Rajni Patel Mgr. Piping Design and Qualif.

(412) 374-6450 C.L. Boggess Engineer (412) 374-6273 L.C. Smith Senior Engineer (412) 374-4079 S. Palm Mgr. Struc. Anal.

(412) 374-6452 Mgr. Equip. Qual Te (412) 256-6446 Larry Walker Pump & Valve Engineering (412) 374-6471 Jim Schlunski Systems Consultant (412) 374-4258 i

i l

i

,y

-4 4

2

-.am, W

4A.

,: =

i EPIP 3-6850

+

i

~ 9 Page 2 of 2 ENGINEERING SUPPORT CONSULTANTS Call List l

l Gilbert Associates - Readina. PA j

J f

All Extensions (215) 775-2600 Fayez Boutros V.P. Mgr. of Engineering ext 2079 l

Daniel Cooper V.P.-& Gen'l Mgr.

Power & Indus. Sys Div.

ext 2424 Daniel L.

Curry V.P. Director of Projects ext 2366 i

Carl Rentschler Piping Anal. & Supports

.)

Dept. Head ext 2965 i

Ettore Anselmi Mechanical Dept. Head art 3605 i

Robert J.

Biese Ginna Project Manager ext 7241 t

Kenneth W. Mayers Chief Electrical & Controls Eng.

ext. 2068 M

4 i

F r

i s

i i

-+

EPIP 3-6351

, 0 Page 1 of 2 FACILITIES AND PERSONNEL MANAGER CATL LIST 1

itQ22:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Upon notification, the Facilities and Personnel Manager or his alternate will notify the following:

)

A.

Personnel Coordinator Guy R. Taylor

-Home

(&*3lElElEBECWt

-Office (716) 724-8409 or Mtarnatta:

Barbara Mestler

-Home flFfM!'

-Office (7I6) 724-84 1

\\

Jeffery Peters

-Home F

-Office (716) 724-8750 Michael Arnold

-Home

-Office (716) 724-8875 l

1 1

V EPIP 3-6:52

  • 0 Page 2 of 2 FACILITILS AND PERSONNEL MANAGER CAIL IJjiT (con't)

RQIE:

The following question must be asked of each person called.

"We need to remind you of the fitnese for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

B.

Security Manager William Dillon

-Home MM

-Office (716) 724-8718

-Pager (716) 527-7787 or Alternateg:

Robert Stein

-Home LM T%C N

-Office (716) 724-8719

-Pager (716) 527-5043 1

Ken Beach

-Home Mf4

-Office (716) 724-8661 Thomas Powell

-Home

{

-Office (716) 724-8717

-Pager (716) 527-7786 C.

Voice Communications Henry Nied

-Home

-Office (716) 724-8938 l

-Pager (716) 783-3600 or Alternates:

Beth Paquin

-Home 6

-Office (716) 771-3877

-Cellular (716) 732-6084

-Pager (716) 464-4109 Dianne Guinan

-Home

.gf;cf]hT M D M B

-Office (716) 724-8960 l

-Pager (716) 464-4108 Frank Swiader

-Home MAKP'M

-Office (716) 724-8969

-Pager (716) 464-4107

w 4er #

'i EPIP 3-6 53

, 1 Page 1 of 3 EOF PERSONNEL COORDINATOR CAIL LIST l

NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Upon notification, the EOF Personnel Coordinator or his alternate will notify the following:

i A.

Facilities Coordinator William F. Rothaug

-Home dN i

-Summer (315) 594-2893

-Office (716) 724-8382 or Alternates:

Karl F. Ehrmantraut

-Home (6

l

-Office (716) 724-8393 Dept. Duty Foreman

-Office (716) 724-8361 RG&E Telephone Operator

-Office (716) 546-2700 B.

Clerical Supervisor Charlotte Buckman

-Home Wh

-Office (716) 724-8251 Amy Jo Spurles

-Home (M@:

-Office' (716) 771-1

~

~

JoAnn Gorman

-Home M%

-Office (716) 771-40 8

{

Sue Sales

-Home

-Office (716) 546-2700 ext. 4892 (h

Robin Johnson

-Home

-Office (716) 771-4026 t

I 9

l

.. if 3,,

EPIP 3-6:54

. 1 Page 2 of 3 EOF PERSONNEL _QQQEDlHATOR CAYL LLST I

(con't)

RQII:

The following question must be asked of each person called.'.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, I

we are requesting that you standby so you can be notified for

{

the next call-in shift."

C.

Purchasing Agent l

M'6)724-8 Gregory Fuller

-Home (71

~

i

-Office Timothy Scanlon

-Home k

-Office (716) 724-8048 Tom Crego

-Home 10.

-Office (716) 724-8046 George Crabb

-Home M M

-Office (716) 724-8036 i

Paul Tuttobene

-Home

-Office (716) 724-8034 D.

Offsite Food Service Coordinator t

MM Gary Riess

-Home

-Office (716) 724-8037 l

-Pager (716) 527-2542 i

Thomas Decker

-Home

,s0RR$.

-Office (716) 546-270 ext. 4438

-Pager (716) 527-5181 E.

Spouse Phone Staff Arlene Plummer

-Home MMRS

-Office (716) 724-8600 Cheryl Thompson

-Home

~

-Office ext. 4617 i

Pamela Johnson

-Home

(

-Office (716) 724-827 J.M. Palermo

-Home

(#W, m

-Office (716) 546-2 0 evt. 4616 t

t

,m

.s __.,

..m, g.

EPIP 3-6 55 AttacngSnt 21 i

Page 3 of 3 EOF PFAH)NNEL COORDINATOR CALL LIST (con't)

EQIE:

The following question must be asked of each person called "We need to remind you of the fitness for duty requirements Are you available to report for duty at this time?

i we are requesting that you standby so you can be notified for If not, the next call-in shift."

F.

Administrative Assistant to the Nuclear Operations Manager Amy Jo Spurles

-Home

-Office (716) 771-4136 Richard Morrill

-Home M [M

-Office

.(315) 524-4446 ext. 655 Kathy Congdon

-Home t

-Office

6) 724-8971 Sue Sales

-Home 6(716)

-Office 546-2700 ext. 4892 l

Carolyne Herschell

-Home

-Office (716) 771-4024 I

G.

Secretary to the Recovery Manager l

1 Loretta Marshall Parker 1

-Home

)

-Office (716 724-6 Amy Jo Spurles

-Home

-Office (716) 771-4136 JoAnn Gorman

-Home:

48

-Office:

(716) 771-4078 Kathy Congdon

-Hame MM

-Office (716) 724-8971 Sue Sales

-Home y

-Office 716 546-2700 ext. 4892 Robin Johnson

-Home 6(716)771-40.16

-Office i

e+

EPIP 3-6856

, 2 FACILITIES COORDIlfATOR Page 1 of 2 CATL LIST UCttE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requiraments.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

Line Construction and Material for Line Construction:

Kurt Doern (Materials)

-Home:

M

-Office:

(716) 724-8672 George Sampson

-Home:

-Office:

(716) 724-8674 g(716)"/ @wy, S' Jim Hughes (Construction)

-Home:

l

-Office:

546-2700 ext. 4414 b

e:

Jim Powers

-Home-l

-Office:

(716 J

Voice Communications Systems: Call for equipment only.

(di$k@ M %;

Henry Nied

-Home:

-Office:

(716) 724-8938

-Pager:

(716) 783-3600 Frank Sviader

-Home:

^1gNQij$h.6

-Office:

(716) 724-8969

-Pager:

(716) 464-4107 Diane Guinan

-Home:

6M,M

-Office:

(716) 724-3960

-Pager:

(716) 464-4108 Beth Paquin

-Home:

$TJ/4CLM&M

-Office:

(716) 771-3877

-Pager:

(716) 464-4109 Arrange Transportation Department Trucks for Internal Support Only.

Patrick Carroll

-Home:

4? M"

-Office:

(716) 724-8903 f(f, M M '

Leslie Stubbe

-Home:

315) 594-2008' Summer / Weekends:

-Office:

(716) 724-8904 Irv Simmons Home:

Office:

(716)S46-2700 ext. 4512

,0 r

EPIP 3-6:58

~

, 3 r

Page 1 of 1 OITPSIDE COMPANY RESOURCES Call List HylLDING MAINTENANCE 49 East Avenue (EOF)

The Farash Corporation Honday - Friday 0800 - 1700 (716) 263-7644 After hours /Weakends (716) 262-3280 QEFICE TRAILERS:

E. Juiliani (716) 724-8374 V.

Leone (716) 724-8380 The following companies can supply office trailers; E.Z. Trailer Rental (716) 247-7440 (Can supply 4-25' or 35' long)

Rupp Rental Corp.

(716) 254-2125 (Can supply 6-25' or 50'long)

K.B.H. Equipment Co.,Inc.

(716) 865-0100 (Can supply 5-26' or 38'long)

PORTABLE TOILETS:

E. Juiliani V.

Leone H & H Rentals (E.Z. Trailer)

(716) 247-7441 (Can supply 50)

All trailer companies responded that additional trailers could be obtained within a few days of notice.

TENTS:

E. Juiliani V.

Leone J

Geneva Avning & Tents Works, Inc.

(315) 789-3425 (can supply 20 - all sizes)

Country Enterprises (716) 538-4600 (1-60 x 1408, plus 40's & SO's) l EAIER1 E. Juiliani J

V. Leone Great Bear (Kr. Allen Bennett)

(716) 288-2830 Has available at all times 600-1200 bottles of portable water at I

five (5) gallons each.

Approximately ten (10) watar coolers are also available at all times.

l

y' EPIP 3-6859

, 4 Page 1 of 2 TELEPHONE COMPANIES Call List The following is a list of names and telephone numbers outside the company that are of concern to RG&E Telephone Communications:

ROCHESTER TELEPHONE CORPORATION Repair Special Services.

716-777-1811 To escalate:

Dick Avery, Supervisor, Special Services.

716-777-6909 Bill Schafer, Manager, Special Services.

. 716-777-7750 Bob Becker, Foreman, Service Assurance.

716-777-7736 IIEW YORK TFLEPHONE Carol Dury, Special Account Rep.

607-774-9239 Syracuse Central Repair Dispatch.

315-890-7711 To escalate:

Ask for Supervisor at Central Dispatch.

315-890-7711 Bob Henrick, Foreman, Testing / Dispatching Watertown..

315-785-7040 Jim Horton, Manager, Watertown.

315-785-7000 AT&T Debbie Smith, Account Rep.

. 716-987-2042 Network Trouble CSC, Customer Service Center.

800-227-3679 Eauipment___ Trouble CSSO, Customer Service Support Organization.

800-242-2121 l

To escalate further:

Butch kheeler, Office.

716-987-6558 Home.

716-659-2612 Pager.

.716-921-6448 1

J F

EPIP S-6860

, 4 Page 2 of 2 TELEPHONE COMPANIES l

Call List (cont'd)

EQ1{CQ COMMUNICATIOL1 Pat Flaherty, Account Rep, Office.

. 716-272-2421 Home.

6 716-921-7266 Pager....

(Central Dispatch Buffalo)

Mike Batsford, Zone Supervisor, Office.

71 -_

4-460 Home.

Pager.

716-921-6955 (Voice Hail Box and Auto Pager)

Cliff Steinruck, On-site Technician.

716-272-2400, x741 716-921-5294 Pager.

Home.

These telephone companies shall be notified that an emergency exists at the Ginna Nuclear Plant.

The listed contacts will be requested to expedito repairs to any vital circuits and equipment related to Rochester Gas and ELoctric, Ginna Station and Monroe and Wayne County emergency facilities.

The county offices of Emergency Preparedness work in conjunction with Rochester Gas and Electric during emergencies that may occur at Ginna Nuclear Plant.

Voice Communication Systems group of Rochester Gas and Electric will contact Rochester Telephone, New York Telephone, ATinT and Ronco Communi-cations as soon as notification is received from the Facilities Manager of Rochester Gas and Electric.

. gg.

13.

EPIP 3-6361 j

=

. 5 Page 1 of 1 FOOD SERVICE REQUIREMENTS CATL LIST Offsite Food Service Coordinator Gary Reiss

-Home

-Office (716) 724-8037 Alternates i

T. R. Decker

-Home

-Office (716) 546-2700 ext. 4438

~

Hill Top Management (716) 729-2400' 1668 Creek Street L

Rochester, New York 14625 Hel Traub

-Home ss(MvM;Eg DiGravio's Deli (315) 524-2222 4146 Route 104 after 10 p.m.

Ontario, New York 14519 (716) 352-4882 j

  • Owners:

Patrick Ross, Joan Russo i

Sunny Vending (716) 235-0500 l

297 Buell Road Rochester, New York 14624

~

Jeff Bielecki

-Home Dave Cyrmin

-Home Donna Kipp

-Home Norma Robesom

-Home Kathy Bingham

-Home JoAnn Borrell

-Home 89 East Avenue I

Oscars 470 Honroe Avenue i

Rochester, New York 14607 Bill Petsos 1

amp 4

4 j

1 4

't EPIP 3-6362

, 6 Page 1 of 4 GENERAL MANPOWER REOUESTS CALL LIST ENGINEERING Offsite Personnel Coordinator:

Director - Employment G. R. Taylor

-Home:

6

-Office:

(716) 724-8409 4

Alternate, Offsite Personnel Coordinator:

Director - HR Planning EEO B. G. Mestler

-Home:

(MM

-Office:

(716) 724-8411 Lnna Term Beyond 6 Months Alternate Vice President Employee Relations Consolidated Edison Thomas J. Galvin

-Office:

(212) 460-4530 Vice President Employee Relations Niagara Mohawk Power Corporation Perry Woods

-Office:

(315) 474-6312 Vice President Employee Relations Power Authority of State of NY Alan J. Weiser

-Office (212) 397-6250

e EPIP 3-6363

, 6 Page 2 of 4 GENERAL MANPOWER REOUESTS CAT.T. LIST SKILLED CRAFTS (SC) AND GENERAL LABOR (GL) offsite Personnel Coordinator:

Director - Employment G. R. Taylor

-Home:

  1. W 8JB91WESMW

-Office:

(716) 724-8409 Alternate, Offsite Personnel Coordinator:

Director - HR Planning EEO m.m.

B. G. Mestler

-Home:

N_, N

-Office:

(716) 724-8411 Immediate (First 2 Weer. A Superintendent General Maintenance Rochester Gas & Electric Corporation Lawrence Mandel (SC & GL)

-Home:

SidM;M

-Office:

(716) 724-8359 Alternate Manager - Field Satrvice Operations Rochester Gas & Electric Corporation William Rothaug

-Home:

  1. MbM

-Summer:

(315) 594-2893

-Office:

(716) 724-8382 Intermediate & Lona Tern (2 Weeks to Beyond 6 Months)

Contract Administrator Rochester Gas & Electric Corporation Paul Tuttobene

-Home:

I$$$b,I!M

-Office:

(716) 724-8034 Alternate Associate Contract Administrator Rochester Gas & Electric Corporation

%Y/!I[$ M Craig Czerkas

-Home:

-Office:

(716) 724-8499 i

5 e

a EPld 3-6:64

, 6 Page 3 of 4 GENERAL MANPOWER REOUESTS CALL LIST INSTRUMENT & CONTROL (IC) & RADIATION TECHNICIAN (RT)

Offsite Personnel Coordinator:

Director - Employment G. R. Taylor

-Home:

-Office:

(716) 724-84 9 Alternate, Offsite Personnel Coordinator:

Director - HR Planning EEO D. G. Mestler

-Home:

g3NM

-Office:

(716) 724-8411 Immediate (First 2 Weeks)

Superintendent, Power Plant Maint. & Perf.

Rochester Gas & Electric Corporation DM$N Dennis Grandjean

-Home:

-Office:

(716) 724-8062 Hanager - Chem. % Health Physics Rochester Gas & Electric Corporation Andrew Harhay

-Home:

MM%

-Office:

T315) 524-4446 ext. 219 Alternate General Technical Services Jim Orr (RT)

-Office:

(800) 888-4787 or (412) 829-6530 Brooks Associates Ray Brooks (RT)

-Office:

(315) 524-9050 Immediate to Lona Term (First 2 Weeks to Beyond 6 Months)

Alternate V.P. Employee Relations Consolidated Edison Thomas J. Galvin (IC)

-Office:

(212) 460-4530 V. P. Employee Relations Niagara Mohawk Power Corporation Perry Woods (IC)

-Office:

(315) 474-1511 V. P. Employee Relations Power Authority of State of NY Allan J. Weiser (IC)

-Office:

(212) 397-6250

, - ~ -

7 k

.GY

=s EPIP 3-6365 f

Attachment.26 Page 4 of 4 i

GENERAL MANPOWER REOUESTS CALL LIST i

CLERICAL Offsite Personnel Coordinator:

l Director - Employment G. R. Taylor

-Home:

W@

-Office:

(716) 724-8409 Alternate, Offsite Personnel Coordinator:

i Director - HR Planning EEO t

B. G. Mestler

-Home:

6

[

-Office:

(716) 724-8411 Immediate to Lona Term (First 2 Weeks to Beyond 6 Months) t Supervisor - Mailing Rochester Gas & Electric Corporation Charlotte Buckman

-Hom (message)

-Office:

(716) 546-2700 ext. 4708 Rochester Gas & Electric Corporation Gilda Ricci

-Home:

l

-Office:

(716) 546-2700 ext. 4709

~

Alternate Burns Personnel

-Office:

(716) 546-6600 Olsten Temporary

-Office:

(716) 232-4070 Plaza Temporary

-Office:

(716) 232-5710,

Executive Placement

-Office:

(716) 454-2682 Manpower Temporary

-Office:

(716) 232-7255 h

l w

w e

t, EPIP 3-6366

. Attachment 27 Page 1 of 1 PURCHA. SING AGENT

_CATL LIST NOTE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not, we are requesting that you standby so you can be notified for the next call-in shift."

The cadre listed below (in contact order) consists of qualified Materials Management personnel to provide the materials and services needed in case of emergency.

Gregory J. Fuller

-Home:

mJddDM Purchasing Agent

-Office:

(716) 724-8030 Coordinates management function Timothy J. Scanlon

-Home:

Supervisor of Buyers

-Office:

(716) 724-8048 (primary back-up to Purchasing Agent)

Supervises material and equipment purchases; knowledge of capabilities of Purchasing staff.

Paul L. Tuttobene

-Home:

/W Contract Administrator

-Office:

(716) 724-8034 Has immediate knowledge of and access to contractor personnel should

?

they be needed.

Thomas J. Crego, Sr.

-Home' Hanager, Fuels / Traffic

-Office:

( 16) 724-8046 Has immediate knowledge of and contact with vendors supplying (1)

Ginna's fuel requirements, and (2) traffic and transportation services (See Attachment /1).

George R. Crabb

-Home:

Bvyer

-Office:

(7i6) 724-8036 E'.k"nsive background in electrical materials purchasing Joseph A. DiTucci

-Home:

Buyer

-Office:

(1) 524-4446 i

ext. 35s Extensive background in power plant purchasing Bruce Myers

-Home:

Manager Material Control

-Home:

-Office:

(

724 1

.i Able to provide materials, tools, supplies and consumables fron Storehouse at Jefferson Road.

b

]

9.

LQL%

n EPIP 3-6:67

, 8 Page 1 of 1 ARRANGING DIESEL FUEL DELIVEPJES Call List Upon notification of a Ginna Station amargency situation, the Materials Management Department will immediately coordinate delivery of 8,000 gallons of diesel fuel from the Ginna dedicated QA storage tanks located at Boebee Station to Ginna Station.

Following completion of delivery, the Facilities and Personnel Manager shall be advised.

The following procedures and contact names have been developed for use in securing transportation services for fuel oil to generating stations under non-routine circumstances.

~

EQIE:

The following question must be asked of each person called.

"We need to remind you of the fitness for duty requirements.

Are you available to report for duty at this time?

If not,

~

we are requesting that you standby so you can be notified for the next call-in shift."

a.

Within the Fuels and Traffic Section, the following contact order has been established and distributed to Genetating Station and General Maintenance personnel.

Joseph Burch

-Home gfWedl56KWM '

-Office (716) 724-8029 Z

$hbMk Lawrence J. Mandel, Jr.

-Home:

-Office:

(716) 'iA4-8042

~

Mark E. Rayburn

-Home:

1

-Office:

(

-8157 Thomas J.

Crego, Sr.

-Home:

(fMMk

-Office:

724-8046 b.

The following list of fuel oil haulers have been contacted and have agreed to provide assistance under non-routine circumstances:

After Carrier Address QLfice Business Hrs

~ hyap;gge, EF w Crossett 249 Paul Rd, Roch. NY (716) 436-8115 A.R. Gundry 85 Stanton St, Roch. NY (716) 436-7292

[

INd h) u;[g:

RFC (Rogers) 890 Winton Rd, Roch. NY (716) 473-6450 Griffith Oil 760 Brooks Ave, Roch. NY (716) 328-5430 Goetz Oil 1350 Buffalo Rd, Roch. NY (716) 436-0030 t

United Refining P.O. Box 8919, Roch. NY (716) 235-9060 c.

Conf.rn arrangements made for delivery with generating station personnel.

d.

Advise Purchasing Agent of delivery confirmation.

w,

Y..

' P _i

}M-e, ~fW EPIP 3-6:68

, 9 Page 1 of 1 ERANGING VEHICLES FOR OFF-SITE ORGANIZATIONS Call List If it becomes necessary to secure outside transportation services for off-site organizations, the following Materials Management / Traffic personnel should be contacted:

Mark E. Rayburn

-Home:

h

-Office:

(71

-8157 Lawrence J. Mandel, Jr.

-Home:

-Office:

(716 Thomas J. Crego, Sr.

-Home:

4(

-Office:

(716) 724-8046 Vehicles would be rented from the following companies:

National Car Rental (716) 232-2969 Ryder Truck Rental (716) 272-7600 DeCarolis Truck Rental (716) 254-1169.

American International Rental (716) 235-4730 Hertz (716) 328-3700 Avis (716) 328-6600 Budget Rent a car (716) 436-9310 Blue Bird Coach Lines (716) 546-8383 M'

9 6

9 4

w' NI

?_

EPIP 3-6369

, 0 Page 1 of 1 ARRANGING LODGING Call List If it becomes necessary to secure lodging, the following Materials Management / Traffic personnel should be contacted I

Mark E. Rayburn

-Home:

-Office:

7 Lawrence J. Mandel, Jr.

-Home

-Office:

Thomas J. Crego, Sr.

-Home-l

-Office:

(716) 724-8046 i

~~

The following motels and hotels are listed with number of room accommoda-tions, address and distance from the Ginna plant.

Twin Rock Motel (315) 524-6411 1785 Ridge Rd., Route 104 Number of units 8 Ontario, NY Distance: 4 miles east Corner Stone Inn (315) 524-5024 6270 Lake Side Road Number of Units: 12 i

Ontario, NY Distance: 5 miles seat s

Ontario Motel (315) 265-1881

~'

~

1044 Route 104 Number of Units: 32 i

Ontario, NY Distance: 6 miles west Airport Harriott Hotel (716) 225-6880 1890 Ridge Rd. W.,

Route 104 Number of Units: 211 Rochester, NY Distance: JA 'iles west Holiday Inn Hotel (716) 546-6400 l

120 East Main St.

Number of Units: 390 l

Rochester, NY Distance: 25 miles west i

Additional room accommodations can be provided as necessary.

l 1

i i

l

\\

r EPIP 3-6:70

. 1 4

Page 1 of 1 PERSONNEL ACTIVATION IDG Person Making Activation:

]

Date:

i i

j Person Activated:

Time:

Instructions:

j Person Activated:

u Time:

Instructions:

Person Activated:

Time:

Instructions:

Person Activated:

Time:

Instructions:

1 Person Activated:

Time:

Instructions:

Person Activated:

Time:

Instructions:

Person Activated:

Time:

Instructions:

Person Activated:

Time:

Instructions:

1 Person Activated:

Time:

Instructions:

t

..? f {* \\ f 11 a L <

ROCHESTER CAS AND ELECTRIC CORPORATION GINNA STATION CONTROLLED COPY NUMBER PROCEDURE NO.

EPIP 5-4 REV. NO.

10 EMERGENCY PLAN IMPLEMENTING PROCEDURE fEPIP) 4 TRAINING PROGRAM TECHNICAL REVIEW PORC REVIEW DATE __ //~/O -

~ PLANT SUPERINTENDENT

//-// - 9G EFFECTIVE DATE CATEGORY 1.0 REVIEWED BY:

THIS PROCEDURE CONTAINS 13 PAGES 1

(

~

EPIP 5-4:1 EPIP 5-4 EMERGENCY PIAN IMPT.PMENTING PROCEDURE (EPIP) TRAINING PROGRAM 1.O PURPOSE:

To establish the training program to develop and maintain the proficiency of Emergency Response / Support -

Organization personnel.

2.O RESPONSIBILITY:

2.1 The Corporate Nuclear Emergency Planner has overall responsibility for maintenance of the Emergency Preparedness Training Program so that it accurately reflects the Emergency Plan and EPIPs.

2.2 The Division Training Manager is responsible for development and implementation of the Emergency Plan Training

program, ensuring that the Emergency Response / Support Organization is staffed with nialified individuals.

3.O

REFERENCES:

3.1 NUREG-0654, FEMA-REP-1, Revision 1,

" Criteria for Preparation and evaluation for Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."

3.2 10 CFR 50 Appendix D Emergency Plans for Production and Utilization Facilities 3.3 EPIP 5-7, Energency Organization 3.4 EPIP 1-5, Notifications 3.5 Nuclear Emergency Response Plan l 3.6 Nuclear Training Manual TR C.22 ' Nuclear Emergency Response Plan Training Program 4.O PRECAFFIONS:

None

's

/

EPIP 5-4:2 5.O PREREQIIISD%1:

Nona 6.O AQTIONS:

6.1 Training Program:

6.1.1 Training shall be conducted in accordance with the Nuclear Training Manual and the Nuclear Emergency Response Plan Program Description.

6.2 Participation

6.2.1 Program participants are designated on Attachment 1, Qualified Individuals List.

6.2.2 Program Participants are required to attend training as outlined in the Nuclear Emergency Response Plan Training Program Description.

6.2.3 A record of attendance at training instruction, mini-

drills, practice drills, table-tops, and evaluated exercises will be maintained.

6.3 Qualified Individuals:

6.3.1 The Qualified Individuals T4 st (Attachment 1) shall be reviewed and updated af-annual training comple-e tion, as a minimum.

6.3.2 Individuals may be added to the lists when they complete the classroom training required for their specified function per TR C.22.

6.3.3 Individuals failing to complete the required training identified in the Nuclear Emergency Response - Plan Training Program Description shall be removed from the Qualified Individuals List (Attachment 1) by letter of notification to the individual and to their supervisor.

6.4 Records

6.4'.1 Training records shall be maintained in accordance with the Nuclear Training Manual 'and the Nuclear Emergency Response Plan Training Program Description.

7.0 ATTACHMENTS

l i

a a

s EPIP 5-4 3 1.

Qualified Individuals List.

Page 1 of 11 OUALIFIED INDIVIDUALS The below individuals have been identified through experience and training as qualified for positions in the R.

E. Ginna Emergency Responsa Organization.

TSC Eneroency Coordinators Control Room Eneroency coordinators T. Schuler R. Ruby

  • R. Marchionda D. Berry l
  • J, St. Martin R. Ruedin
  • J. Widay R. Lingl T. White G. Litzenberger T. Alexander P. Sidelinger T. Marlow D.

Peterson B. Everett G. Mostert B. Sensenbach K. McLaughlin TSC Dose Assessment Mananer TSC Dose Assessment Support

  • D. Filion J. Bement
  • A. Herman M. Harrison N. Kiedrowski K. Gould
  • F. His R. Kenyon B. Quinn F. Puddu P. Polfleit R. Gasper B. Thomson Health Physics / Chemistry Manater D. Filion D. Filkins
  • W. Goodman A. Herman
  • K. Lang
  • J. Benent F. Mis B. Thomson Primary Responders to position i

i

  • ~

Y EPIP 5-4 4 Page 2 of 11 OUALIFIED INDIVIDIJALE Chemistry Coordinator

  • A. Harhay G. Jones
  • W. Schneider L. Houser
  • B. Dahl Plant Operations Assessment Mangggr S. Adams
  • T.

Schuler J. Cook

  • R. Ruedin P. Gorski
  • T. White T. Harding J. Wayland l

M. Ruby Plant Maintenance Assessment Manaaer S. Adams R. Marchionda

  • E. Edgar T. Marlow
  • G.

Eng T.

Schuler J.

Fisher

  • M. Smith
  • P. Gorski J.

St. Martin T. Harding G. Wahl D. Horning J. Widay Primary Responders to position

o;;

c EPIP 5-435 Page 3 of 11 OTJALIFIED.. INDIVIDUALS Plant Technical Assessment Manaaer l

S. Adams J. Wayland J.

Cook C. Rioch G.

Eng T. Schuler R. Forgensi M. Smith P. Gorski J. St. Martin T. Harding T. Alexander J. Walden R. Ploof Nuclear Assessment i

S. Adams I

J. Cook l

T. Harding J. Wayland l

D. Mays I/C Electrical Systen Assessment R. Bryan J. Baker i

E. Edgar M. Smith G.

Eng D. Servantius T. Harding J. Wayland G. Cain T. White B. Popp

  • M. Farnan Primary Responders to position

s;

.f EPIP 5-4:6 Page 4 of 11 OUALIFIED INDIVIDUALS Mechanical / Hydraulic System Assessment P. Bamford T. Harding R. Bryan G. Joss M. Cavanaugh R. Ploof G.

Eng M. Smith R. Forgensi

  • G. Wahl D. Gent J. Walden N. Goodenough J. Wayland P. Gorski T. White Computer Analyst D. Dunn M. Karalius T. Kaza P. Latulipe B. Steffon l

D. Ekeren Primary Responders to position.

k i

>j

,e EPIP 5-/. 2 7 i

Page 5 of 11 OUALIFIED INDIVIDUATR Administrative Communications Manaaer J. Bodine J. Saavedra J. DiTucci

  • R. Podlena i

M. Lilley

  • M. Shaw S. Poulton I

i l

Switchboard Operators j

I. Grassman A.

Saavedra H. Joachinczyk L. VanHoover E. Reiss S. Williams V. Roselli i

TSC Communicators and Status Boardkeeners R.

Bryan D. Doyle G.

Eng R. Podlena

  • R. Forgensi
  • C. Rioch C. Smith M. Smith L. VanHoover
  • J. Walden H. Aurand Security Manaaer
  • R. Benne
  • G. Palmer S.

Eckert T. Porter

  • R. Teed M. Smith Personnel coordinator M. Antezak
  • A. Hassett
  • S. Poulton D. Kuhn H. Klingenberger
  • S. Smith K. Hart Primary Responders to position.

I

"Nrm

')

EPIP 5-4:8 Page 6 of 11 QUAT.TFIED INDIVIDUALS Emertrency Survev Team G.

Bussard K. Magnuson S.

Carter H. Klingenberger P.

Cologgi R. Mastrella G.

Combs J. Mazzeo D. Dohse A.

Patrzalek J.

Edler P. Phelan D. Ganskop W. Poulton J. Grzybek W. Nichola K. Hayes C. Rothfuss T. Joachinczyk S.

Beluke T. Teague S.

Stinson J.

Liese J.

Zapetis A.

Lauria C.

Cook M.

Leach G.

Bishoping D. Garofoli F. Cordaro Survey Center Manacer D.

Bryant

  • M.

E.

Dangler L. Houser

  • G. Jones
  • J. Knorr S. Meister W.

Poulton W.

Schneider Primary Responders to position

30

.]

EPIP 5-4:9 4

Page 7 of 11 OUATJFIED INDivivDALS Control Room Control Room (con't)

STA J. Banke S. Reed D. Berry R. Reissner N. Brehse D.

Bisiallon M. Rousell R. Bryan B. Phillips R. Ruby J. Cook J. Brown R. Ruedin G. Eng G. Burgess B. Scarrott R. Forgensi K. Cori R. Schnall P. Gorski Dan Dean B. Sensenbach D. Klemz Don Dean P. Sidelinger F. Maciuska l

D. Dettman M.

Slaby P. Bamford W.

Everett B.

Snider R. McMahon V.

Fabrizio M.

Sweet T. Plantz R. Fellows D. Thomson R. Ploof T. Fouts M. Smith K. Garnish J.

St. Martin C.

Gagnier B. Stiewe R. Gillow H. VanHoute D.

Gomez J. Wayland E.

Groh B.

Zollner l

J. Hamm J.

Fischer M. Hansen C. Jones HP Shift Techs Other HP Personnel T. Jubert K. Kronenberger T. Bierkortte J. Bement T. Laursen G.

Brown R. Gasper-l R.

Lingl D. Cotroneo W.

Goodman J. List E.

Eaton K. Gould G. Litzenberger G.

Fuller M. Harrison i

S. Mason D. Kotarski R. Kenyon T. Paglia L. Lyons D. McCaslin J. Pagani R. McCoy M. Powell K. McLaughlin J. Raike D. Peterson B. Wood M. Micklow S. James A. Modzelewski D. Jones A. Moore B. Meighan G. Mostert G.

Ball S.

Natarelli M. Wright R. Nye

4v EPIP 5-4:10 Page 8 of 11 ggALTFIED INDIVIDUALS h ations Support Center D. Baker T. Harding R. Batz R. Hayes J. Huff D. Horning G. Cain G. Kennedy C.

Collini D. Leeper l

R. LaPoint M. Leyrer E. Edgar D. Marriott G.

Eng H. Meleca M. Farnan P. Perry J.

Fischer D. Powell T.

Fratangelo C. Rauber D. Gent F. Schm P. Gorski G. Wahl R.

Graham W.

Zornow J. Guider B. Paul J. Knorr T. Plantz M.

Smith B. Popp

V 6

EPIP 5-4:11 Page 9 of 11 QUALIFIED INDIVIDUALS i

Recovery Manaaer

  • Robert Smith
  • Bob Meeredy
  • Gary Meier Bruce Snow Rick Watts Paul Wilkens Nuclear Ooerations Manaaer Bob Mecredy
  • Dan Klenz
  • Wes Backus Gary Meier Dick Belcae
  • Bob Carroll l
  • Joe Larizza Technical Assistar.t to NOM Dan Klenz John Traynor
  • Herb VanHoute Bob Carroll
  • Neil Brehse
  • Ken Masker Administrative Assistant to Nuclear Operations Manaaer Dick Morrill
  • Kathy Congdon l
  • Amy Joe Spurles
  • Sue Sales JoAnn Gorman C.

Herschell Corporate Sookesoerson

  • Jack Noon
  • Mike Power
  • Dick Peck
  • Stan Spector l

Mike Kennedy Technical Assistant to

  • Bob McMahon Dick Beldue Corporate Sookesperson
  • Frank Maciuska Wes Backus
  • Dick Morrill l

Terry Fulkerson News Announcement Write.Ig George Lappan Joyce Curran Rick Meier Ann Duckett Assistant to Coroorata Sookesoerson Pat Maier Betty Weis Laurie Picardo Lori Lootens News Center Manaaer

  • Frank Orienter Dave Whitlodt i
  • John Edmunds
  • Lee Loomis Primary Responders to position.

i l

T'1 c,

EPIP 5-4:12 e

Page 10 of 11 OUALIFIFD INDIVIDUALS Encineerina Suecort Manacer

  • Charlie Anderson Len Sucheski
  • Will McCoy Gary Goetz
  • Paul Wilkens Gene Voci Charles Forkell Cornorate Nuclear Enercency Was Backus
  • Rick Watts Planner Dick Morrill
  • Dick Baldue l
  • Peter Polfleit Frm9t orimtzr Offsite Acency Liaison Elmer Adkins Tom Swartz Bobby Ellis Clyde Forbes Offsite Acency Tech. Rens.

Jim Sweet Lance Hubbard Wes Hunter Bob Harper John Hart Norm Meaker Scott Dixon John Traynor Willard Ashmore Jane Neis Mark Coleman Jim Zulawski Larry Briggs Facilities and Personnel Jeff Peters Dave Irish Dave Webster Advisory Suenort

  • Tom Frantz
  • Cliff Olson Paul Ruganis
  • Jim Deni Patrick Callahan EOF Dose Assessment Manacer
  • Bernie Quinn
  • N. Kiedrowski Marlin Clifton Richard Watts Peter Polfleit
  • Duane Filkins EOF Dose Asse.gsment Support B. Burton J.

L. Williams C. D' Ambrosia W.

L. Knoll K. Hylton E. W.

Prytherch J. Prill K. M. Sahler B. Butler D.

D. Dakin Y.

Selbig l

J. Keller

y

~4 f4 s

a EPIP S-4:13 Page 11 of 11 i

OUALIFIED INDIVDUALS Offsite Dose Assessment Survev Teams M. V. Burgess N. Edwards l

T. H. Eldridge G. Haverly T.

Soper l

Communications Hank Neid Frank Swiader Diane Guinan Communicators Diana Brunson Don Travis RECS /HPN)

Robert Dodge Sue Sales l

Al Jones P. Brown Status Board Keeners Bernie Rivera Robert Dodge David Stone Dave Denneny l EOF /JENC Security Bill Dillon Vince Plumeri Ken Beach Tom Powell l

John Ehrhert Plant Comeuter Operators Debbie Zakrzewski Tammy Woodruff Peter Wierzba Ed M. Martin Diane Dunn Secretary, Recovery Manacqr Amy Jo Spurles Loretta Marshall-Parker JoAnn Gorman Kathy Congdon Sue Sales Robin Johnson l Clerical Supervision Charlotte Buckman Sue Sales l

Jean Metson Joanne Gorman j

Amy Spulles Robin Johnson Telefax, Copiers. Couriers Positions to be filled as needed from Hail Room Personnel through Clerical Supervision b