Confirms 931201 Telcon Arrangements for Requalification Program Insp to Be Conducted During Wk of 940214.Listed Matl Requested by 940131
ML20058L505
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 12/09/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 9312170024
Download: ML20058L505 (3)


Text

.

i

?

Docket No. 50-271

' i DEC 9.1993 Mr. Donald A. Reid j

Vice President, Operations Verraont Yankee Nuclear Power Corporation RD 5, Box 169 l

Ferry Road Brattleboro, Vermont 05301 i

Dear Mr. Reid:

l

-j

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VERMONT. YANKEE l

i In a telephone conversation on December 1,1993, between Mr.- A. Burritt of this office and l

Mr. E. Harms of your training department, arrangements were made to evaluate the l

requalification program at the Vermont Yankee facility. The NRC will perform this j

l evaluation based on inspection activities in accordance with NRC Inspection Manual, j

Temporary Instruction TI-2515/117, rather than an NRC-administered requalification.

)

examination. The inspection will be performed. based on facility-administered examinations j

i that are scheduled to start the week of February'14,1994; In order to prepare for the inspection activities, you will need to furnish the following materials.

Training Department Instructions / Procedure dealing with the Licensed Operator Requalification Program.

Sample Plan / Test Outime Copies of exam materials to be administered during the inspection.-

l Mr. Harms has agreed to provide all materials by January 31,1994. Your staff should -

assure appropriate measures are taken to preclude examination compromise when submitting '

i these materials.

160040 OFFICIAL RECORD COPY G:VYRQ.ALB -

bR bK b.)

71 Q

PDR g

Y It bl l

r

,.e-

.w ~

r e,

-1 F

p

i n

i j

r Mr. Donald A. Reid 2

DEC 9 B33 Thank you for your cooperation in this matter. Should you have any questions, please.

contact Mr. R. Conte, Chief, BWR Section, at 215-337-5210.

Sincerely, Original signed By:

Glenn W. Meyer Ixe H. Bettenhausen, Chief -

Operations Branch.

-i Division of Reactor Safety -

]

i cc:

M. Mervine, Training Manager R. Wanczyk, Plant Manager-.

J. Thayer, Vice President, Yankee Atomic Electric Company j

L. Tremblay, Senior Licensing Engineer, Yankee Atomic Electric Company.

J. Gilroy, Director, Vermont Public Interest Research Group, Inc.

j D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire i

Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts j

R. Gad, Esquire G. Bisbee, Esquire R. Sedano, Vermont Department of Public Service T. Rapone, Massachusetts Executive Office of Public Safety -

Public Document Room (PDR) l Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, (2) l NRC Resident Inspector l

State of New Hampshire, SLO Designee l

State of Vermont, SLO Designee q

Commonwealth of Massachusetts, SLO Designee I

t r

j L

OFFICIAL RECORD COPY G:VYRQ.ALB

=

O o

o Mr. Donald A. Reid 3

DEC 91993 i

bec:

Region I Docket Room (with concurrences)

E. Kelly, DRP J. Shediosky, DRP M. Oprendek, DRP A. Burritt, DRS d

R. Conte, DRS OL Facility File DRS File

.i bec (VIA E-MAIL):

W. Dean, OEDO i

D. Dorman, NRR I

W. Butler, NRR t

t i

.r i

e r

i I

i i

RI:DRS RI:DRS RI:DRS B

tt/dmg C

Bettenhausen 12/06/93 12/'c193 12//0/93 l

OFFICIAL RECORD COPY'- G:VYRQ.ALB -