Forwards Insp Repts 50-317/93-30 & 50-318/93-30 on 931010- 1113.Violations Noted But Not Cited Re Failure to Perform Required Monthly Surveillance Test on Electric Fire Pump
ML20058L482
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/09/1993
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Denton R
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20058L486 List:
References
NUDOCS 9312170006
Download: ML20058L482 (3)


See also: IR 05000317/1993030

Text

.-

-~

.

..

-.-

-

.

C

.'

DEC

9 1993

.

.!

'

.

j

Docket Nos. 50-317

License Nos. DPR-53

l

50-318

DPR-69

i

Mr. Robert E. Denton

Vice President - Nuclear Energy

)

Baltimore Gas and Electric Company .

Calvert Cliffs Nuclear Power Plant -

j

1650 Calvert Cliffs Parkway

Lusby, Maryland 2 % 57 - 4702

j

!

Dear Mr. Denton:

-i

..

.

Subject:

NRC Region I Resident Inspection Report Nos. 50-317/93-30 and 50-318/93-30 :

'

(October 10,1993 - November 13,-1993)

,

_'t

This report transmits the findings of the safety inspection enadwR by the ' esident inigswis -

r

4

at the Calvert Cliffs Nuclear Power Plant. At the conclusion of the inspection, these findings

were discussed with Mr. Cruse of your staff.

Areas examined during this inspection are described in the NRC Region I Inspection Report that

'

is enclosed with this letter and were selected in order to ensure that your facility is operated with-

1

due regard for the public health and safety. Within these areas, the inspection consisted of L

selective examinations of procedures and representative records, interviews with personnel, and

t

observations by the inspectors. Overall, the NRC has concluded that your facility was operated

in a safe manner.

I

Inspectors reviewed the circumstances surrounding a missed surveillance test Due to inattention

to detail, BG&E failed to perform the required monthly surveillance test on the electric fire

~

pump. Although the failure to perform the test within the required periodicity was a violation

j

of NRC requirements, the violation was not cited because the criteria fordiscretion specified m

)

Section Vll.B of the NRC Enforcement Policy was satisfied.

_

l

,

,

I

160033

i

1

l

.

OFFICIAL RECORD COPY,

gf

gg211B88[$$o$o

7

'

tI(

.

.

._

.

-

,

,-

._ _

_ _.

._

.

._

_

_

_

_

_ _ _

7. _ _

]

1

/

DEC

9 1993

+

-

.

i

!

.-

r

,

.

Mr. Robert E. Denton

-2

j

.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter will1

i

be placed in the NRC Public Document Room .Your cooperation is appmciated..

e

Sincerely,

i

4

.

t

.

Curtis J. Cowgill, Chief"

..

Reactor Projects Branch No.1 -

l

- Division' of Reactor Projects

i

Enclosure:

NRC Region I Resident Inspection Report Nos. 50-317/93-30 and .50-318/93-30

)

cc w/ encl:

.

!

G. Detter, Director, Nuclear Regulatory Matters (CCNPP)

'

i

R. McLean, Administrator, Nuclear Evaluations

. . .

j

J. Walter, Engineering Division, Public Service Commission of Maryland-

.;

K. Burger, Esquim, Maryland People's Counsel

ll

R. Ochs, Maryland Safe Energy Coalition

l

K. Abraham, PAO (23) SALP Reports and (2) All Inspection Reports -

Public Document Room (PDR) -

.

Iocal Public Document Room (LPDR)'_

Nuclear Safety Information Center (NSIC)

';

NRC Resident Inspector

'

State of Maryland (2)

.l

OFFICIAL RECORD ~ COPY

-

,

.

_

_

.

.

a

.-

DEC

9 1993

,

,

.

Mr. Robert E. Denton

3

bec w/ encl:

Region I Docket Room (with concurrences)

C. Cowgill, DRP

'

L. Nicholson, DRP

R. Fuhrmeister, DRP

P. Wilson - Calvert Cliffs

.

W. Dean, OEDO

R. Capra, NRR

D. Mcdonald, NRR

!

'

.

2

,

i

.i

l

-)

.

RI:DRPg

RI:DRP

RI:DRfjfk

.

MBo

CCowfill

j

d, PWilson

11#;/93

lt/F93

12g/93 -

h

,

l

OFFICIAL RECORD COPY.

a:IR9330

j

i