Entergy Operations,Inc.
-=~ ENTERGY e c+ s
. > v;2 L A 7006tl To m ; m C774 R. F. Burski
.m w
&%n 3 W3F1-93-0369 A4.05 PR.
December 14, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report Gentlemen:
Attached is the subject monthly report which covers the operating statistics for the month of November,1993. This report is submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications for Facility Operating License No. NPF-38.
Very truly yours,
~
g 13 B
i fDiredor fh Nuclear Safety RFB/TSB/ssf Attachment cc:
J.L. Milhoan, (NRC Region IV), R.B. McGehee, N.S. Reynolds, F. Yost (Utility Data Institute, Inc.),
J.T. Wheelock (INP0 Records Center), NRC Resident 160030 nspectors Office 9312170001 931130 PDR ADDCK 05000382
[3
((M R
PDR y
g,
s NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 NOVEMBER 1993 The unit operated at an average reactor power of 99.9% and experienced no shutdowns or significant.
power reductions during the period.
l 1-
\\
i i
.i' i
+
1 i
PRESSURIZER SAFETY VALVE l
1 FAILURES AND CHALLENGES.
j t
WATERFORD 3 During the month of November 1993, there were no pressurizer safety valve failures or challenges.'
i I
i I
k
~I 2
I I
i l
'l i
j 1
l 4
OPERATING DATA REPORT l
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 i
DATE OF REPORT:_ DECEMBER,1993 COMPLETED BY:
P.M. CENTOLANZI
]
TELEPHONE: 504-739-6683 i
OPERATING STATUS i
1.
Reporting Period: November,1993 Gross Hours in Reporting Period: 720 l
2.
Currently Authorized Power Level (MWt): 3390 l
Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 3.
Power Level to which Restricted (if any) (Net MWe): N/A l
4.
Reasons for Restriction (if any): N/A f
THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor was Critical l
720.0 7,963.0 60,356.0 i
6.
Reactor Reserve Shutdown Hours l 7.
Hours Generator was On-line 720.0 7,948.0 59,544.2 l
8.
Unit Reserve Shutdown Hours l 9.
Gross Thermal Energy Generated (MWH) 2,437,790 26,843.438 196.510.491 l
i
- 10. Gross Electrical Energy Generated (MWH) 792,150 8,739,340 65,600,810 l
- 11. Net Electrical Energy l
Generated (MWH) 758,857 8,353,029 62,524,646 f
- 12. Reactor Service Factor 100.0 99.3 84.1 l
- 13. Reactor Availability Factor 100.0 99.3 84.1 i
t
- 14. Unit Service Factor 100.0 99.2 83.0-
- 15. Unit Availability Factor 100.0 99.2 83.0
- 16. Unit Capacity Factor (using MDC) 98.0 96.9 81.1 l
- 17. Unit Capacity Factor (Using DER) 95.5 94.4 78.9
- 18. Unit Forced Outage Rate 0.8 3.5 t
i 4
1 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: DECEMBER,1993 i
COMPLETED BY:
P.M. CENTOLANZ1 TELEPHONE: 504-739-6683 1
OPERATING DATA REPORT (Con't)
+
- 19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):
Refueling - March 18,1994. Planned duration - 52 days.
- 20. If Shutdown at end of report period, estimated date of startup: N/A
- 21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 720.0 8,016.0 71.761.0 i
- 23. Unit Forced Outage Hours 0.0 68.0 2,178.7 i
- 24. Nameplate Rating (Gross MWe): 1200
- 25. If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A y
9 F
i I
e I
t i
l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: DECEMBER,1993 COMPLETED BY; P.M. CENTOLANZI TELEPHONE: 504-739-6683 MONTH NOVEMBER.1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 1055 17 1055 2
1055 18 1055 3
1056 19 1055 4
1055 20 1054 5
1054 21 1053 6
1056 22 1054 i
7 1054 23 1053 t
8 1054 24 1053 f
i 9
1054 25 1053 f
10 1054 26 1054 11 1055 27 1051 i
12 1055 28 1053 1
13 1054 29 1053
.I i
14 1054 30 1053 15 1053 31 N/A
-l 16 1053 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
I i
I
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: DECEMBER,1993 COMPLETED BY:
P.M. CENTOLANZI TELEPHONE: 504-739-6683 REPORT FOR NOVEMBER.1993 Type Method of Shutting F = Forced Duration Down the Reactor or Cause, Comments and Number Date S = Scheduled (Hours)
Reason (1)
Reducina Power (2)
-Corrective Actions NONE (1) REASON (2) METHOD A=
Equipment Failure (explain) 1=
Manual B=
Maintenance or Test 2=
Manual Scram C=
Refueling 3=
Regulatory Restriction 4=
Continuation from Previous Period E=
Operator Training and 5=
Power Reduction License Examination 6=
Other (explain)
F=
Administrative G=
Operational Error (explain)
H=
Other (explain)
- w-Mr--N'wwem
- wimy5iw
-W iy w we eg-p+iw t w g-no w-6m +-4+y-"9-se=-u,
>",ewar-a+w -r w w -m wr--*-