ML20058K991
| ML20058K991 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 01/23/1974 |
| From: | Mayer L NORTHERN STATES POWER CO. |
| To: | Oleary J US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML20058K994 | List: |
| References | |
| NUDOCS 9105070343 | |
| Download: ML20058K991 (2) | |
Text
-
w o
Fie Cy.
p,,colator y NSIB NORTHERN STATES P O Vr E R COMPANY usuNzapotes.MemwasotA e s 4 oi I4
.q
'(
Or[17 January 23, 1974
,f g
f(b
{ l/,s
'k
- N &i h
/p.
9 Ops kuus s
Mr. J F O' Leary pur:
Q: JAN 30 7374 '
% < <e 1 /
Directors';e of Licensing Office of Regulation R
.~.
2
% paw 7
'~
U S Atomic Energy Comission I.
Em:n Washington, DC 20545
[u t$ N E S g N
\\
\\
M/
~
- 9
Dear Mr. O' Leary:
MONTICELLO NUCLEAR GENERATING PIRiT Docket No. 50-263 License No. DPR-22 Permanent Plant Changes to Accommodate Equilibrium Core Scram Reactivity Characteristics he attached t sport uitled "Pemanent Plant Changes to Accommodate Ec.uilibrium Core Scram Reac-ity Chr.racteristics, January 1974" provides bases for adoption and implementation of the following proposed changes and modifi-k cations during the Sprag 1974 refueling outage.
1.
Installation of a Prompt Relief Trip System 2.
Replacement of spring safety valves with combination safety relief valves.
3.
Adoption of morc realistic control rod scram times in the Techrical Specifications.
This submittal is supplementa.y to the "Second Reload Submittal" dated Nove=ber 19, 1973 in that it 1,rovides reanalysis of all pertinent transients for a mir.ed core of 7 x 7 and 8 x 8 fuel and the proposed modifications.
C Also included in Appendix B of this submittal is a detailed discussion on the concept of Design and Operational Consenatism Factors (DCF/OCF).
l l
The required Technical Specification changes will be formally submitted in the near future.
We have concluded that the proposed modifications do not involve an unreviewed safety question, he Montic allo Operations Comittee and Safety Audit Committee have revi - eed the submittal
_. 818' 9105070343 740123 CF ADOCK 0500026' CF g.
N O R*.
ERN STATES POWER CO.
'ANY Mr. J F O' Leary January 23, 1974 Page 2 Our outage has been rescheduled to cormence on March 15, 1974 and is expected to conclude within two months of that date. Ik shall appreciate establishment of a review schedule which will permit resumption of plant operation as planned.
Yours very truly, d o.
L 0 Mayer, PE
. Director of Nuclear Support Services LOM/DWJ/kn ec: J G Keppler G diarnoff Minnesota Pollution Control Agency
..tta.
E A Pryzina l'
i
. -. _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _