ML20058K914

From kanterella
Jump to navigation Jump to search
Discusses Malfunction of RCIC High Steam Flow Isolation Switch
ML20058K914
Person / Time
Site: Monticello 
Issue date: 03/15/1972
From: Mayer L
NORTHERN STATES POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML20058K918 List:
References
NUDOCS 9104260276
Download: ML20058K914 (1)


Text

-

,..g d

h N*

NORTHERN STATES POWER COMPANY fh nneapolis, f/innesota 55401 March 15, 1972 p.

ei #f b /[D z

k

' HSE 2 3 737 N

~

Dr. Peter A. florris Division of Reactor Licensing "g, a 3

United States Atomic Energy Commission y

Washington, D C 20545 8a 8*.au y

7

Dear Dr. ido r r i s:

f.OffilCELLO fl) CLEAR GENERAT l!S PLAT (I Docket No. 50-263 License No. DPR-22 Malfunction of RCIC High Steam flew Isolation Saitch A cc,ndition has occurred recently at the f/onticello Nuclear Generating Plant which we interpret to be reportable in accordar.ce wi th Section 6.6.C.1 of ihe Techni cal Speci fi cat ions.

T be Region II! Compli ance of fi ce has been noti fied of this event.

Sunmarv of Occu rrence On Varch 1,1972, while performinE a regularly scheduled surrillance test, the trip setting of one of the two RCIC Hich Steam Flow Isolaticn switches was found to be ~48,600 #/Hr, 3,600 #/Hr 'above the requi red t rip setting of 45,00') #/Hr.

The instrument was visually inspected and the cause of the failure was fr und to be excessive f ree covecent ( v 1/16") of a link connection tha! allowed interference in the refer movecent enen above 95% of scale.

The corrective action taken on the date of the occurrence consisted of reducing the f ree novecent of the link assembly to an acceptable value, and recoving excess retal f rom the novement connection. T he inst rucent was recalibrated and functionally tested.

All similar safety system instru-cents which have potential for such a malfunction will be inspected for excessive f r ee mo vecent o f the l i nkage.

A Significant Operating Event report has been written for this occurrence and will be made available to the Pegion 111 Compliance I nspector fo r review during his next visit.

Yours very truly,

, /.

'\\

it yxymy g

j truc f

L. O. Mayer 7

g~ gy )g7g y I. i Director of Nuclear Support Services

\\;9 m

itemon

$/Eg if LO!//AAS/ki k

\\/

7 9104260276 72O315" w\\~y. by CF ADDCK 05000263

~

CF,