Advises of Plan to Do 100% Reinsp of All 4-inch Bypass Loop Welds During Current Refueling Outage,In Response to Bulletin 74-10A
ML20058K638
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/09/1975
From: Wachter L
NORTHERN STATES POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
IEB-74-10, NUDOCS 9102130399
Download: ML20058K638 (1)


Text

i i

NORTHERN STATES POWER COMPANY M IN N E A PO LIS. MIN N E SOTA 55401 January 9,1975

..7.

c ",,

/

1 A

I i.

@$ f/ s

. /

A

/

M o ~,

m Iir J G Keppler, Regional Director

_~

Directorate cf Regulatory Operationc Region III United States Atomic Energy Cot =ission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Dear Mr Keppler:

f IIONTICELLO NUCLEAR GENERATING PIJJ;T DOCKET 50-263 LIC :SE DPR-22 0

Our Deceniber 23, 1974 response to "no Dulletin 74-10A stated that ue planned to reinspect the four ucids af four inch line to bypass loop weldolets, and that ne would censider reinspection of additional bypass line welds.

fiter learning cf the recent findings on additional reinspections ue neu plan a 100;; reinspectica of all f cur inch bypass icop uelds during the current ref uelin; cuta;;e, Yours very truly, 9*

s _.

'U L J Wachter, Vice President Pc7er Production - System Operation L,: 'ma cc: ::r E G Case lir G Charnoff Iir E A Pr'jnina Assistant Director for Construction and 0 erations - AEC 7