ML20058K504

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Praire Island Nuclear Generating Plant, Core Operating Limits Rept,Unit 2 - Cycle 16, Incorporating Listed Changes
ML20058K504
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 12/08/1993
From: Richard Anderson
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20058K507 List:
References
NUDOCS 9312150265
Download: ML20058K504 (2)


Text

.

Northem States Power Company 414 Nicollet Mall Minneapolis, Minnesota 55401-1927-Telephone (612) 330-5500 December 8, 1993 Tech. Spec. 6.7.A.6 r

U S Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555 r

PRAlRIE ISLAND NUCLEAR CENERATING PiANT Docket Nos. 50-282 License Nos. DPR-42 50-306 DPR-60 Core Operating Limits Report for Prairie Island Unit 2 Cycle 16 i

The attached revision to the Core Operating Limits Report for Prairie Island Unit 2 Cycle 16 is being provided in accordance with the requirements of

[

Technical Specification Section 6.7.A.6.

The limits specified in the attached i

Core Operating Limits Report have been established using NRC approved methodology.

The Unit 2 Core Operating Limits Report has been revised to incorporate the following changes f.or Cycle 16:

1. The Heat Flux Hot Channel Factor and Nuclear Enthalpy Rise Hot Channel i

Factor Limits have been revised.

2. The peak linear heat generation rates used in the ECCS analyses have been revised.

l I

3. Figure 1 has been revised to incorporate a K(z) value of 1 for the full

./

core height.

4. The multiple V(z) curves have been replaced with a single figure containing bounding V(z) curves for four ranges of exposures.
5. Additional information related to the bases for the K(z) and V(z) penalties has been incorporated.

440039

'00

~

~

?$A*ISS'cESSo$$S6h

\\\\

e r

4 USNRC.

NORTHERN STATES POWER COMPANY

' December 8, 1993 Page 2 Please contact Gene Eckholt (612-388-1121, Ext, 4663) if you have any questions related to these reports.

r

{

Ro.er O Anderson Director Licensing and Management Issues c: Regional Administrator - Region III, NRC NRR Project Manager, NRC Senior Resident Inspector, NRC State of Minnesota Attn: Kris Sanda i

J E Silberg

Attachment:

Core Operating Limits Report Unit 2 Cycle 16, Revision 0 i

t L

I e

P S

i

.