ML20058K472
| ML20058K472 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/10/1993 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20058K477 | List: |
| References | |
| NUDOCS 9312150246 | |
| Download: ML20058K472 (5) | |
See also: IR 05000382/1993099
Text
~
i
in
si stTG
_ UNIT E D ST ATES
I
,g
NUCLEAR REGULATORY COMMISSION
n
.
,
Of
REGION IV
8
611 RY AN PLATA DRIVE, SulTE 400
.
o
%
AR LINC10N. T E X AS 7601100G4
+
.....
DEC I O 1993
+
Docket:
50-382
r
License: NPF-38
,
Entergy Operations, Inc.
t
'
ATTN:
Ross P. Barkhurst, Vice President
Operations, Waterford
P.O. Box B
>
Killona, Louisiana 70066
Dear Hr. Barkhurst:
.
Enclosed is the Systematic Asse sment of Licensee Performance (SALP) Report
for the Waterford Steam Electric Station, Unit 3, covering the period
August 2, 1992, threugh October 30, 1993. We have scheduled a meeting to
.
'
discuss this repn
with you and your staff at the Waterford 3 facility
training center on December 21, 1993, at 3 p.m. (CST).
During this meeting
,
you are encouraged to candidly discuss any comments you may have regarding our
1
report. While ints meeting is considered a presentation and discussion forum
between Entargy Operations, Inc., and the NRC, the meeting will be open to any
other interested parties as observers.
Overall you continued to operate the plant safely and, it is my view, that
your conduct of activities in connection with the Waterford 3 facility was
generally strong. The basis for this performance includes your experienced,
.
stable, and well-trained staff; excellent plant material' condition; and strong
corporate support for program improvements, including peer-group evaluations.
These attributes are tempered by instances of inattention to detail, a lack of
self-checking, and corrective action system weaknesses. We noted a decline in-
management presence and visibility in the plant spaces.
These issues, as well
!
as an increase in operating events, resulted in a decline in performance in
!
the plant operations area. We noted superior performance in the areas of
maintenance and plant support. Your staff is commended for their aggressive
approach to plant aging issues, radiological control practices, and security
program implementation.
Items noted late in the SALP period involving
emergency preparedness exercise weaknesses and isolated problems with
procedural adequacy and procedure' implementation in the radiological controls
area warrant attention to ensure that superior performance is maintained in
the plant support area.
In the engineering area performance was mixed. Continued initiatives to
improve the organization by consolidation in a new, onsite facility and
streamlining the management structure were noted. These and other strengths,
such is systems training for senior managers, and a strong technical response
to identified issues' were considered superior. Engineering effectiveness at
Waterford 3 continues to mature, and a period of sustained performance
,
F
9312150246 931210
ADDCK 05000382
i
>
G
a
.
I
.
__
_
_
_
. - _ _ . _ _ . _ . _ _
, _ _ . _ _ _
.
DEC i 01993
Entergy Operations, Inc.
-2-
!
i
demonstrating the proactive identification of issues, including challenging
operational safety decisions, is needed to support an overall superior
performance rating.
8
Your attention is directed towards these challenges in the operations and
,'
engineering areas as well as providing for an appropriate level of management
presence and oversight in the plant. These considerations are appropriate to
support the continuing identification and resolution of. issues and direct
i
confirmation of the effectiveness of your improvement initiatives.
~
Any comments you have concerning our evaluation of the performance of your
Waterford 3 facility should be discussed at the public meeting and submittad
i
in writing to this office within 30 days after the meeting.
I
.
t
.
ames L. Milhoan
Regional Administrator
Enclosure:
SALP Report 50-382/93-99
cc w/ enclosure:
Entergy Operations, Inc.
'
ATTN: Harry W. Keiser, Executive
Vice President & Chief Operating Officer
'
P.O. Box 31995
-
Jackson, Mississippi
39286-1995
!
1
Entergy Operations, Inc.
ATTN: Jerrold G. Dewcase, Vice President
<
Operations Support
l
P.O. Box 31995
Jackson, Mississippi
39286
i
Wise, Carter, Child & Caraway
-
<
ATTN:
Robert B. McGehee, Esq.
'
P.O. Box 651
i
Jackson, Mississippi
39205
.
Entergy Operations, Inc.
,
ATTN:
D. F. Packer, General
Manager Plant Operations
P.O. Box B
Killona, Louisiana 70066
!
!
I
,
w
-.
.w.
- _ = . ~ .
-
.
- -
.
,
l
Entergy Operations, Inc.
-3-
DEC 101933
,
l
Entergy Operations, Inc.
l
ATTN:
L. W. Laughlin
Licensing Manager
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
i
Baton Rouge, Louisiana 70825-1697
l
Entergy Operations, Inc.
ATTN:
R. F. Burski, Director
Nuclear Safety
i
'
P.O. Box B
Killona, Louisiana 70066
Hall Bohlinger, Administrator
Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
,
Parish President
St. Charles Parish
P.O. Box 302
Hahnville, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
.
Winston & Strawn
'
ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
-
,
i
!
_
-
.-
-
-
.
- . - .
.
.
.
Entergy Operations, Inc.
-4-
'
bec to DMB (IE40)
!
bcc distrib. by RIV:
'
J. L. Milhoan
Section Chief (DRP/D)
Lisa Shea, RH/ALF, MS: HNBB 4503
MIS System
DRSS-FIPS
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
DRP (2)
The Chairman (HS:
16-G-15)
Records Center, INP0
Commissioner Rogers (MS:
16-G-15)
G. F. Sanborn, E0
Commissioner Remick (MS:
16-G-15)
RRIs at all sites
Commissioner de Planque (MS:
16-G-15)
L. J. Callan, D:DRSS
J. M. Taylor, EDO (MS:
17-G-21)
D. D. Chamberlain, DRSS
,
J. M. Montgomery
B. Murray, DRSS
'
J. T. Gilliland, PA0
C. A. Hackney
C. J. Gordon (6 copies)
5. J. Collins Reading File
W. D. Beckner, NRR (MS:
10-E-4)
.
i
,
.hd
/
._RIV & JRS [ DD:DRP 4M DD:DRSSNO
NRR k [
REC 0tQiR [
[JChNinsds
TPGwynn Y0
DDChamberlain
WBeckner
ShohliM
f/[_]
jn/q f 93
(1 / I/93
O/A/93
\\
93
DR
k
.
JMMdntgomery
JLMilhoan
IL/9/93
til[)93
~
-
.~
.
i
. - .
,
.
'
)
t
I
Enter 9y Operations, Inc.
-4-
>
,
t
!-
bcc to DMB (IE40)
\\
{
bec distrib. by RIV:
J. L. Milhoan
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: HNBB 4503
!
MIS System
DRSS-FIPS
<
,
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
DRP (2)
The Chairman (MS:
16-G-15)
Records Center, INPO
Comissioner Rogers (MS:
16-G-15)
G. F. Sanborn, E0
Commissioner Remick (MS:
16-G-15)
RRIs at all sites
Comissioner de Planque (MS:
16-G-15)
L. J. Callan, D:DRSS
J. M. Taylor, ED0 (MS:
17-G-21)
D. D. Chamberlain, DRSS
3'
J. M. Montgomery
B. Murray, DRSS
J. T. Gilliland, PA0
C. A. Hackney
C. J. Gordon (6 copies)
S. J. Collins Reading i11e
,
W. D. Beckner, NRR (HS:
10-E-4)
i
!
i
.\\
r
RIydhSRS [ DD:DRP 4M/ DD:DRSSMO
NRRk [
REC 9ti(Mt/
0
DDChamberlain
WBeckner
Sho(kiM
hCNins[s
TPGwynn
I/3/9
f L /r4 /93
(1/I/93
O/A/93
\\
93
DRA /k
RA h
JMMntgomery
JLMikhoan
i
lL/3/93
y!J lh93
.
i
140074
e
e