t JUN 2 91990 Mr. Neil P. Smith, Chairman Seismic Qualification Utility Group i
c/o EPRI 10:9 19th Street, N.W.
l i
Washington, D. C.
20036 i
Dear Mr. Smith:
SUBJECT:
SUPPLEMENTAL SAFETY EVALUATION REPORT NO. 1 ON SQUG GENERIC IMPLEMENTATION PROCEDURE, REVISION 1-.
Since the issuance of the staff Generic Safety Evaluation Report (GSER) dated July 29, 1988, for USI A-46', there has been considerable progress in the development of technical criteria and procedures, as well as some' revisions-to the licensing issues.
The Seismic Qualification Utility Group (SQUG) has~
incorporated parts of the progress and the changes into the Generic Imple-I mentationProcedure(GIP), Revision 1,datedDecember1988.
The NRC staff has completed the review of the GIP, Revision 1.
Our Supplemental Safety. Evaluation Report (SSER) No. 1 is enclosed. Due to the significant progress made after the GIP, Revision 1, was submitted, some of the information
. provided in-Part II of the GIP,. Revison 1, became obsolete.
Because a complete evaluation of Part II would not be fruitful,~ the enclosed SSER No. I addresses only the staff's evaluation and positions on the issues of a more generic nature that are contained in Part I of the GIP, Revision 1.
This evaluation is provided in Enclosure 1.
The staff requests that the SQUG incorporate the staff positions described in
! and incorporate any additional resolutions of the remaining open issues into the forthcoming GIP, Revision 2.
4 Sincerely,IS/
James E. Richardson, Director Division of Engineering Technology Office of Nuclear Reactor Regulation
Enclosures:
t As: stated
.cc:: R. Schaffstall, EPRI Distribution:
TEMurley ACRS
-BDLlaw RJones JStewart PTKuo DCrucni;c!d JHSniezek SVarga AThadani SNewberry LPhillips PYCHEN JERichardson FMiraglia GBagchi DJeng FRinaldi LBMarsh EMEB RF Chen CHRON CRGR GHolahan EBrach FRosa DET RF JHConran PDR Centrali: Files 3
- See previous concurrence DET:EMEB*
DET:EMEB* DET:EMEB* NRR/RVIB*
NRR/ DST
- DET:D*
h i[f :
PYChen:sm PTKuo TMarsh EBrach AThadani JERichardson 3/6/90 3/19/90 3/22/90 3/22/90 4/3/90 4/5/90 I
(
?
.. w ~~ - e w 9007060106 900629 s-encw NRC RLE CENTER COPY v
\\*
' E,,,
JUN _2 91990 Mr. Neil P. Smith, Chairman-Seismic Qualification Utility Group c/o EPRI 1019 19th Street, N.W.
Washington, D. C.
'20036
Dear.Mr. Smith:
SUBJECT:
~ SUPPLEMENTAL. SAFETY EVALUATION REPORT NO.1 ON SQUG GENERIC l
IMPLEMENTATION PROCEDURE, REVISION 1 l
i Since the issuance of the staff Generic Safety Evaluation Report (GSER) dated July 29, 1988, for USI A-46, there has been considerable progress in the development of technical criteria and procedures, as well as some revisions to the licensing issues. The Seismic Qualification Utility Group (SQUG) has l
incorporated parts of the progress and the changes into the Generic Imple-mentation Procedure (GIP), Revision 1, dated December 1988, i
u l-l The NRC staff _has-completed the review of the GIP, Revision 1.
Our Supplemental Safety Evaluation Report (SSER) No. 1 is enclosed.
Due to the significant i
progress made after the GIP, Revision 1, was submitted, some of.the information provided in Part II of the GIP. Revison 1, became obsolete.
Because a complete evaluation of Part II would not be fruitful, the enclosed SSER No.1 addresses only the staff's evaluation and positions on the issues of a more generic nature that are contained in Part I of the GIP, Revision 1.
This evaluation is provided in Enclosure 1.
The staff requests that the SQUG incorporate the staff positions described in and incorporate any additional resolutions of the remaining open issues into the forthcoming GIP, Revision 2.
Sincerely, James E. Ri ha dson, Director Division of Engineering Technology Office of Nuclear Reactor Regulation L
Enclosures:
As stated, cc:
R. Schaffstall, EPRI Distribution:
TEMurley ACRS BDLiaw RJones JStewart PTKuo DCruchfield JHSniezek.
SVarga AThadani-SNewberry LPhillips PYCHEN JERichardson FMiraglia GBagchi DJeng FRinaldi LBMarsh EMEB RF Chen CHRON CRGR GHolahan EBrach FRosa DET RF JHConran PDR
' Central filesa
- See previous concurrence DET:EMEB*
DET:EMEB* DET:EMEB* NRR/RVIB*
NRR/ DST
- DET:D*
PYChen:sm PTKuo TMarsh EBrach AThadani JERichardson 3/6/90 3/19/90 3/22/90 3/22/90 4/3/90 4/5/90