ML20058K408

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-285/90-41 on 901015-19.No Violations Noted
ML20058K408
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 12/12/1990
From: Collins S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gates W
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20058K411 List:
References
NUDOCS 9012170220
Download: ML20058K408 (3)


See also: IR 05000285/1990041

Text

-.

-

-

.

--

.

.

. . . . -

-

DEcL2 %

'

Docket No. 50-285/90-41

License ho. DPR-40

i

i

Omaha Public Power District

ATTN:

W. G. Gates, Division Manager

Nuclear Operations

444 South 15th Street Mall

Mail Stop 8E/EP4

3

Omaha, Nebraska 68102-2247

Gentlemen:

This refers to the inspection conducted by Dr. J. B. Nicholas of this office .

y

and Dr. J. C. Jang of the NRC Region I of fice during the_ period.0ctober 15-19,

l

1990, of the activities authorized by NRC Operating License DPR-40 for the Fort

Calhoun Station, and to the discussion of our findings with Dr. ,J. K. Gasper

and other members of your staff at the' conclusion of the-inspection on

October 19, 1990.

Areas examined during the inspection included portions of the liquid and

gaseous radioactive waste management programs and confirmatory dose

calculations of the offsite doses from radioactive waste effluents released to

the environment. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the inspectors.

The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

l

identified. However, we identified some confirmatory calculation l disagreements

,

between your calculated offsite dose results and those calculated using our

~

PC-DOSE computer code. The problem appears to be in the computer codes used to

calculate your dose values.

The dose result disagreements'are discussed in

paragraph 7 (0 pen Item 285/9041-04) of the enclosed inspection report.

.

'

Accordingly, you are requested to respond in writing to1this: office, within

>

30 days of the date of this letter, concerning the steps you plan ~ to take- to

'

-

address the confirmatory dose calculation disagreements.

During the exit meeting you made specific commitments regarding. followup.

actions for Open Items (285/9041-01; 285/9041-02; and 285/9041-03) as discussed-

in the enclosed inspection report.

Please advise us if your understanding of-

these commitments is different than' documented in the report.

We have also examined actions you have taken with regard to previously

c

identified inspection findings

The status of these items is identified in

paragraph 2 of the enclosed report.

/

  • RIV:RPEPS
  • RI:ERPS

C:RPEPS

D:DRSS

f

M-

JBNicholas:Im

JCJang

BMurray

ABBeac t'/ }

SJ00

s

f

\\ %/90

/ /90

/ /90

p./i/90

0 /90-

i

  • Previously Concurred

,

unen % '

G

MbhN

m

v'

6

i..

i

Omaha Public Power District

-2-

Should you h' ave any questions concerning this. inspection, we will be pleased to

discuss them with you..

l

-Sincerely,

!

Orisi. *I gign*4 If

D

Samuel J. Collins, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-285/90-41

cc w/ enclosure:

LeBoeuf, Lamb, Leiby & MacRae

ATTN:

Harry H. Voigt, Esq.

1333 New Hampshire Avenue, NW

Washington, D.C.

20036

Washington County Board

of Supervisors

-

ATTN: Jack Jensen, Chairman

Blair, Nebrasta 68008

Combustion Engineering, Inc.

ATTN: Charles B. Brinkman, Manager

Washington Nuclear Operations

12300 Twinbrook Parkway, Suite.330

Rockville, Maryland 20852

j

Nebraska Department of Health

-

ATTN: Harold Borchert,' Director

Division of Radiological Health

,

301 Centennial Mall, South

P.O. Box 95007

Lincoln, Nebraska 68509

Fort Calhoun Station

ATTH:

T. L. Patterson, Manager

.

P.O. Box 399

Fort Calhoun, Nebraska 68023

bec:

(see next page)

,

.

.

.

. .

. .

.

..

.

.

.

.

.

'. s

Omaha Public Power District

-3-

bec to DMB (IE06)

i

bec distrib. by RIV:

  • R. D. Martin
  • J'. B. Nicholas

'

'

  • DRSS-FRPS
  • Section Chief. (DRP/C) '
  • MIS System
  • RIV File-
  • DRP

- *RSTS Operator

  • Project Engineer (DRP/C)

Lisa Shea, RM/ALF-

  • DRS

.

. J. C. Jang, RI

  • A. Bournia, NRR Project Manager (MS:: 13-D-18)
  • A. B. Beach
  • B. Murray-
  • Resident Inspector
  • RWise
  • w/766

l

,

N

t

'

!

.I

- :

!

s