Docket No. 50-285/90-41
License ho. DPR-40
i
i
Omaha Public Power District
ATTN:
W. G. Gates, Division Manager
Nuclear Operations
444 South 15th Street Mall
Mail Stop 8E/EP4
3
Omaha, Nebraska 68102-2247
Gentlemen:
This refers to the inspection conducted by Dr. J. B. Nicholas of this office .
y
and Dr. J. C. Jang of the NRC Region I of fice during the_ period.0ctober 15-19,
l
1990, of the activities authorized by NRC Operating License DPR-40 for the Fort
Calhoun Station, and to the discussion of our findings with Dr. ,J. K. Gasper
and other members of your staff at the' conclusion of the-inspection on
October 19, 1990.
Areas examined during the inspection included portions of the liquid and
gaseous radioactive waste management programs and confirmatory dose
calculations of the offsite doses from radioactive waste effluents released to
the environment. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with
personnel, and observations by the inspectors.
The inspection findings are
documented in the enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
l
identified. However, we identified some confirmatory calculation l disagreements
,
between your calculated offsite dose results and those calculated using our
~
PC-DOSE computer code. The problem appears to be in the computer codes used to
calculate your dose values.
The dose result disagreements'are discussed in
paragraph 7 (0 pen Item 285/9041-04) of the enclosed inspection report.
.
'
Accordingly, you are requested to respond in writing to1this: office, within
>
30 days of the date of this letter, concerning the steps you plan ~ to take- to
'
-
address the confirmatory dose calculation disagreements.
During the exit meeting you made specific commitments regarding. followup.
actions for Open Items (285/9041-01; 285/9041-02; and 285/9041-03) as discussed-
in the enclosed inspection report.
Please advise us if your understanding of-
these commitments is different than' documented in the report.
We have also examined actions you have taken with regard to previously
- c
identified inspection findings
The status of these items is identified in
paragraph 2 of the enclosed report.
/
- RIV:RPEPS
- RI:ERPS
C:RPEPS
D:DRSS
f
- M-
JBNicholas:Im
JCJang
BMurray
ABBeac t'/ }
SJ00
s
f
\\ %/90
/ /90
/ /90
p./i/90
0 /90-
i
- Previously Concurred
,
unen % '
G
MbhN
m
v'
6
i..
i
Omaha Public Power District
-2-
Should you h' ave any questions concerning this. inspection, we will be pleased to
discuss them with you..
l
-Sincerely,
!
Orisi. *I gign*4 If
D
Samuel J. Collins, Director
Division of Reactor Projects
Enclosure:
Appendix - NRC Inspection Report
50-285/90-41
cc w/ enclosure:
LeBoeuf, Lamb, Leiby & MacRae
ATTN:
Harry H. Voigt, Esq.
1333 New Hampshire Avenue, NW
Washington, D.C.
20036
Washington County Board
of Supervisors
-
ATTN: Jack Jensen, Chairman
Blair, Nebrasta 68008
Combustion Engineering, Inc.
ATTN: Charles B. Brinkman, Manager
Washington Nuclear Operations
12300 Twinbrook Parkway, Suite.330
Rockville, Maryland 20852
j
Nebraska Department of Health
-
ATTN: Harold Borchert,' Director
Division of Radiological Health
,
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509
Fort Calhoun Station
ATTH:
T. L. Patterson, Manager
.
P.O. Box 399
Fort Calhoun, Nebraska 68023
bec:
(see next page)
,
.
.
.
. .
. .
.
..
.
.
.
.
.
'. s
Omaha Public Power District
-3-
bec to DMB (IE06)
i
bec distrib. by RIV:
- R. D. Martin
- J'. B. Nicholas
'
'
- DRSS-FRPS
- Section Chief. (DRP/C) '
- MIS System
- RIV File-
- DRP
- *RSTS Operator
- Project Engineer (DRP/C)
Lisa Shea, RM/ALF-
- DRS
.
. J. C. Jang, RI
- A. Bournia, NRR Project Manager (MS:: 13-D-18)
- A. B. Beach
- B. Murray-
- Resident Inspector
- RWise
- w/766
l
,
N
t
'
!
.I
- :
!
s