._
-
_
.
', i
m',
,
,
,
N' M' . s
NOV 3 01990
,3
I
kL
i Docket No. 50-382/90-M
~
License No. NPF-38
i
'
'
o
Entergy O'perations, Inc.
ATTN:
R..P. Barkhurst, Vice President
Operations, Waterford
P.O. Box B
,
Killona, Louisiana 70066
Gentlemen:
> SUBJECT:
NOTICEOFVIOLATION(NRCINSPECTIONREPORTNO' 50-382/90-24)
,
This refers to the ins)ection conducted by Messrs. W. F. Smith, S. D. Butler,
and W. M. McNeill of t11s office during the period October 2 through November 13,
1990. The inspection included a review of activities authorized for your -
Waterford Steam Electric Station, Unit 3, facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
-identified in the enc'osed report.
' Areas examined during the inspection are identified in the report.
The areas
'
included onsite followup of events, monthly maintenance observation, monthly
surveillance ~ observation, operational safety verification, followup of
previously, identified items, licensee event report followup, balance of plant
11nspection,' and evaluation of licensee quality assurance program implementation.
.'Within these areas, the inspection consisted of selective examination of
procedures and representative records, interviews with personnel,' and
observation of the activities in progress.
e
t
-Based 'on-the results of this inspection, certain of your activities appeared to
"
be in violation of NRC: requirements, as specified in the enclosed Notice of
,,
Violation-(Notice). We are concerned about the violation because we have noted
M
that the last three monthly resident inspection reports have identified other
failures to follow procedures. Although the consequences have been of minor:
i safety.signif'(cance,1 the failure to follow procedures may be. indicative of
l potential weaknesses in your program for procedure compliance.
Procedure
' compliance had also been 'an issue in the 1988-1989 timeframe. Based on
'
discussions with the resident inspectors, we understand you have recently
s
c3nducted assessments of performance in the maintenance area and have also
'
concluded that the procedure compliance issue should be reassessed. We are
encouraged with the knowledge that you had taken these initiatives.
,
.
r
- You are .regiaired to respond to thJs ' letter and should follow the instruc'tlons-
specified in the enclosed Notice when preparing 30ur response. 'In your
-
' response, you should document the-specific: actions taken and any; additional
.V
actions;you plan to prevent recurrence. After reviewing your response to this
'
1
. e~ . Notice, including your ~ proposed corrective actions and the results of future
4
,SDButler
WMcNeill
'
- RIV: SRI
- C:DRP/A
- RIV:RI
- RIV:RI:MQPS
WFSmith
TFWesterman
1
11/ /90 :11/ /90
11/ /90
11/ /90
11
90
\\\\
,
'
y:
- previously concurred
[@j2cggg
g_
,
c!
poc
a e
m
JL
$
,
ij
'
'
, 9.:
-
..-
,
,
b
Entergy Operations, Inc.
-2-
.; -
t
inspections, the NRC will detennine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
,
- The responses. directed by this. letter and the enclosed Notice is not subject to
~ the clearance procedures of. the Office of Management and Budget as required by
.
'
the Paperwork Reduction Act of 1980. Pub. L.~No. 96.511.
Sincerely,
'
/s
Samuel J, Collins, Director
Division of Reactor Projects
,
,
Enclosures:
3
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC. Inspection Report
,
'
50-382/90-24
3.
Appendix C - Waterford 3 Midcycle
-
QPPR Meeting Outline
cc w/ Enclosures:
Entergy Operations, Inc.
,
ATTN:
Donald C. Hintz, Executive Vice.
.,
President & Chief Operating Officer
.
P.O. Box 31995
Jackson, Mississippi
39286
,
Entergy Operations
Inc.
_
,
ATTN:
Gerald W. Muench, Vice President
. Operations Support-
.
P.O.-Box 31995
Jackson, Mississippi
39286
Wise, Carter, Child & Caraway-
ATTN:
Robert B; McGehee, Esq...
P.O. Box 651
Jackson, Mississippi 39205
^
~Entergy Operations, Inc.
ATTN:
-J. R. McGaha, Jr. . General'
Manager Plant Operations
P.O. Box B
Killona, Louisiana 70066.
-
E
'Entergy.0perations, Inc.
ATTH:
J. G. Dewease, Senior Vice
President, Planning & Assurance
P.O. Box 31995
Jackson, Mississippi 39286-1995
'
.
.
.i -
-.
e-
,
-
.
. . _ _
f4
1.D
' ' '
3
,
Entergy Operations, Inc.
-3-
c/
y
.
'Entergy Operations, Inc.
,
L
ATTN:
L. W. Laughlin, Site
'
Licensing Support Supervisor
,
o
,P.O.-Box B
.
. 'J
Killona, Louisiana 70066
L
Shaw, Pittman, Potts & Trowbridge-
,
- .-- i
- ATTN:-~ Mr. E. Blake
'
n 2300 N Street, NW
Washington, D.C.
20037
,
Chainnan
<
"
'
Louisiana Public Service Connission-
One American Place, Suite 1630
. t
,
-Baton Rouge, Louisiana 70825-1697
-$ntergyOperations,Inc.
-ATTN: . R. F. Burski.. Director
!
<
. Nuclear Safety
?
c317 Baronne Street
New Orleans, Louisiana 70112~
' Department of Environmental Quality
-
ATTN: Glenn Miller, Administrator
Radiation Protection Division
P.O. Box 14690
Baton Rouge, Louisiana 70898
President
arlsh Council
St. Charle
Parlsh
Hahnville, Louisiana 70057.
Mr. William A. Cross
.
.Bethesda Licensing Office
3 Metro Center
Suite.610:
Bethesda, Maryland 20814
.
bectoDMB(IE01).
bec distrib. by:RIV:
p
'
- R. ' D. ; Martin
- Resident In".pector
- Section Chief (DRP/A)..
- DRP
- DRSS-FRPS
- MIS System
- Project Engineer (DRP/A) .
- RSTS Operator
- DRS
- RIV File
.
13-D-18)
Lisa Shea, RM/ALF-
,
- D.Wigginton,NRRProjectManager(MS:
- w/766-
,
>f, ?
'
- s
-f!
.o
,.
_
_