ML20058K038
| ML20058K038 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 11/28/1990 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Carns N ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20058K042 | List: |
| References | |
| NUDOCS 9012070027 | |
| Download: ML20058K038 (3) | |
See also: IR 05000313/1990036
Text
_
s-
.,
,
.
.
NOV 2 81990
J
' Docket Nos. 50-313/90-36
50-368/90-36-
3
"_
License Itos. DPR-51
flPF-.6
Entergy Operations, Inc.
.
~ ATTN:
Neil S..Carns, Vice President
Operations, Arkansas Nuclear One
Route 3, Box 137G
Russellville, Arkansas 72801'
Gentlemen:
This refers to thelr.spection conducted by Mr. R. B. Vickrey of this office
.during the period October 22-26, 1990, of activities authorized by 11RC
Operating' Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, Units 1 and 2,
'
and to the discussion of the inspection findings with Mr. J. W. Yelverton and
other members of youristaff at the conclusion of the inspection.
,
The' area examined during this inspection was the evaluation of licensee
- self-assessment capabilities.. Within this area, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel,.and observations by the inspector. The inspection findings ere
. documented in the enclosed inspection report.
1
,This report does.not include specific inspection followup for any Diagnostic.
= Evaluation-Team findings:(reference Diagnostic Evaluation Team Report issued
' December l21,'1989).
Within the scope'of:the' inspection, no violations or deviations were
'
t
11dentified.
f
'Should you have.any questions concerning this inspection, we will be pleased to
x
- discuss them with you.
I
Sincerely,
'
,
,.
OrbtnalGionod By:
l.
,
h
Thomas P.Gwynn
.
Samuel J. Collins, Director
'
E
' Division of Reactor Projects
Enclosure:
(seenextpage)
q
'
- RIV:RI:0PS
- C:0PS
- D:DRS
D:DRP
l
BVickrey/cjg-
JGegliardo
LJCallan
c W ollins
,
/ /90
/ /90
/ /90
/T1/90
'
!*
- Previously concurred
9012070027 901128
L
DR
ADOCK 050
3
,
,.
.s
=
k
20l
L
-
q
(,
,
.
-
d
Entergy Or rations, Inc.
-2-
}
Enclosure:
_
. Appendix - NRC Inspection Report
--
50-313/90-36
50-368/90-36
cc w/ enclosure:
Entergy Operations, Inc.
'
ATTN: Donald C. Hintz, Executive Vice
,,
,
President & Chief Operating Officer
-
P.O. Box 31995
-
Jackson, Mississippi 39286
Entergy Operations, Inc.
ATTH: Gerald W. Muench, Vice President
.
.
Operations Support
"
P.O. Box 31995
-
. Jackson, Mississippi 39286
Wise, Carter, Child & Caraway
' ATTil: Robert B. McGehee, Esq.
.P.O. Box 651
Jackson, Mississippi 39205
_
-
Arkansas. Nuclear One
ATTN.: Early Ewing, General llanager
'
Technical Support and Assessment.
Route 3, Box 1370
-
Russellville, Arkansas 72801
-
Artansas Nuclear One
ATTN: : Jerry Yelverton, Director
Nuclear Operations-
-
Route 3 Box 137G
-
Russellville, Arkansas 72801
_
.rkansas Nuclear One "
ATTN: Mr. Tom W. Nickels '
'
Route 3, Box 137G
=
Russellville, Arkansas 72801
-Combustion Engineering, Inc.-
-
ATTH: Charles B. Brinkman, Manager
-
'
Washington Nuclear Operations
E
12300 Twinbrook Parkway, Suite 330
.Rockville, Maryland 20852
-
-
Honorable Joe W. Phillips
County Judge of Pope County
-
Pope County Courthouse
Russellville, Arkansas 72801
-
-
_
.
,L'i. -
.-
'
a;
7(
.
.
Entergy Operations,~1nc.
-3-
P
Winston & Strawn
'
ATTN:
Nicholas S. Reynolds, Esq..
1400 L Street, N.W.
' Washington, D.C.
20005-3502
ATTH: Ms. Greta Dicus, Director
Division of Environmental Health
Protection
.
,.
4815 West Markam Street
.
>Little Rock, Arkansas 7?201
Babcock'& Wilcox
Nuclear Power Generation Division
ATTN: .Mr. Robert B. Borsum
1700 Rockville Pike, Suite 525
q
.Rockville, Maryland 20852
,
Admiral Kinnaird R. McKee, USN (Ret)
P.O. Box 41
0xford, Maryland 21654
'
bectoDliB(IE01)-
bec distrib, by RIV:
"
- R. D. Martin
- Resident Inspector
-
'
"
- DRSS-FRPS
'*SectionChief(DRP/A)
- Lisa Shea, RM/ALF'
- RIV File.
- DRP
- MIS System
,
- RSTS Operator-.
- Project Engineer (DRP/A)
'
"
- DRS
f*T.= Alexion,NRRProjectManager(MS: 13-E-21))
1
' *C ' Poslu'sny, llRR Project Manager (MS: 13-D-18
.
- B. Vickrey
- J. Gagliardo
'
- W/766
,' ac
,
,* '
-
t
50
if
.e
c
_
.
.
. .
.
,
,