.y N(N 2 61990

-Docket Nos. 50-313/90-08

- 368/90-08 License Nos. DPR-51 NPF-6 Entergy Operations, Inc.

ATTN:

Neil S. Carns, Vice President Operations, Arkansas Nuclear One Rou'te 3, Box 137G Russellville, Arkansas' 72801

. Gentlemen:

Thank you for your letter of October 6,1990, in which you provided the

. schedule of the control room simulator-emergency response drills for operations personnel during 1990 and the first 6 months of 1991.

This information will be useful to us in our future planning.

Sincerely, Drfginal Signed BT Samuel J. Collins,-Director Division of Reactor Projects

.CC:'

iEntergy(0perations, Inc.

ATTN::. Donald-C. Hintz, Executive Vice President & Chief Operating Officer y

1-l P.'0..- Box 31995.

Jackson, Mississippi 39286

Entergy Operations, Inc.

-ATTN:. Gerald W. Muench, Vice President 1

ll

.'P.O.' Box 31995 il Operations Support L.

jJachson, Mississippi 39286 W. ise, Carter, Child &. Caraway g

DATTN: -Robert B.,McGehee, Esq.

t 2P.0f: Box 651 lL

- Jackson,' Mississippi 39205

. I_.

' j i

>* RIV:RPEPS.

  • C:RPEPS-D:DRSS NMTerc/ch BMurray ABBeac SXollins j'i/90

/.c/90

/ /90 ti /A/9 n

i f

' *Previously. Concurred M

9012060075 901106 l

PDR ADOCK 05000313 j

'qa.O PNU g

2-Entergy Operations, Inc.

Arkansas Nuclear One-ATTN:

Early Ewing, General Manager Technical Support and Assessment Route 3, Box 137G

=

Russellville, Arkansas 72801 Arkansas Nuclear One

-ATTN: Jerry Yelverton, Director l

Nuclear Operations Route 3, Box 137G Russellville, Arkansas 72801 Arkansas Nuclear One ATTN:

Mr.- Tom W. Nickels Route 3, Box-137G

.Russellville, Arkansas 72801

~ Combustion Engineering, Inc.

- ATTN:: Charles-B. Brinkman, Manager Washington Nuclear Operations 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland.20852 Honorable Joe W. Phillips

-County Judge of Pope County Pope County Courthouse

Russellville, Arkansas' 72801

-Wir.ston & Strawn ATTN: ' Nicholas S. Reynolds,'Esq.

1400 L1 Street,-N.W.

! Washington,'D.C.

20005a3502 Arkansas Department of Health ATTN:~ Ms; Greta Dicus,' Director Division of Environmental Health Protection'

4815 West'MarkamLStreet1
Little Rock,- Arkansas' _72201

. Babcock & Wilcox

..0'

' Nuclear-Power Generation Division

' ATTN: Mr. Robert B. Borsum 1700 Rockville Pike; Suite;525 Rockville, Maryland: 20852

_-_._____________m____

_-______._____-______._______________.____________._._._._.___._._._______m_

1 1.'

j i

Entergy Operations, Inc.

  • I
Admiral Kinnaird R. McKee, USN (Ret)

P.O. Box 41

-Oxford, Maryland 21654 Chief, Technological Hazards Branch FEMA Region 6 Federal Center 800 North Loop 288 Denton, Texas 76201-3698 bec to DMB (IE-35) bec with licensee's let1er:

Resident Inspector.

RPEPS File 1 Section Chief, DRP/A Lisa Shea, RM/ALF RIV. File DRP' DRS i

' MIS System du RSTS Operator Inspector

-Section Chief, SEPS i

%eg,

-B.

Beach.

E ".

LProject Engineer, DRP/A L

ET. Alexion, NRR Project Manager C. Posiusny,'NRR Project Manager

~;R.~Erickson, NRR s

.f

-h_

f l

E

[.'

[-

4

.;-g

. Entergy payvearguauac-t Operations e

OCT I O October 6, 1990 DCAN109003 Mr. Robert Martin U. S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011

SUBJECT:

Arkansas Nuclear One - Units 1 and 2 Docket Nos. 50-313/50-368 License Nos. OPR-51 and NPF-6 Inspection Report 50-313/90-08; 50-368/90-08

Dear Mr. Martin:

During the AN0/NRC Management Meeting on Emergency Preparedness ~, it was requested that we provide you a schedule of the control room simulator emergency preparedness dril_ls.for operations personnel during 1990.

The Unit i drills have been' suspended pending completion of the current refueling outage which began on October 1,.1990.

The next cycle of Unit 2 drills will be conducted weekly during the period from Oci.uber 22 -

November 30,,1990.

1 The; drills sd edules for 1990 and the preliminary schedule for the first six months of 1991 are attached.- If you have any questions please contact me-at (501) 964-8601.

Very truly yours, ma-James. Fisicaro Manager, Licensing JJF/DWB/sgw Attachment' e

i yc40-19'l i

  • f J

Mr. Robert Martin

- October 6, 1990 Page 2 cc:

U. S. Nuclear Regulatory Commission Document Control Desk Mail Station P1-137 Washington, D. C.

20555 Tomas W. Alexion NRR Project Manager, Region IV/ANO-1 U. S. Nuclear Regulatory Commission NRR Mail Stop 11-B-19 One White Flint North 11555 Rockville Pike Rockville,-Maryland 20852 NRC Senior Resident Inspector Arkansas Nuclear One - ANO-1 & 2 Number 1, Nuclear Plant Road Russellville, AR 72801 Mr. Chester.Poslusny NRR Project. Manager, Region IV/ANO-2 U. S. Nuclear Regulatory Commiss-lon NRR Mail' Stop 11-B-19 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 i

,-(

m iII II

Attachment OCAN199003

/

EMERGENCY PLANNING EVALUATED SIMULATOR DRILLS Unit One i

1990 Drill #1 Drill #2 Drill #3 Drill #4 February _22 March 22 June 25 Cancelled March 1

March 29 July 3 due to 1R9 March

'8 April 4

July 10 refueling April 10 July 17 outage April 11 July 24 L

April 17 July 31 April 18 h

'1991 1st Quarter 2nd Ouarter January 10 April 10 January =17 April.18 January 24' Apail 25 January 31 Mar 2

February 7 Ma3.

9 February 14 Ma) 16 Unit Two 1

1990 Drill #1 Drill #2 Drill-#3-

- i

= January 7 April 24 October 22 January 10 April 25 October 29 E!

,. "y January 18-May 2

~ November 5 l

January 24 May 9

November 12 January 31 May 16 November 19 May 30 1991 1st Quarter 2nd Quarter

-None Scheduled

' April 15 i[o-

-due to 2R8 April 22 E:'!

outage.

April 29 A

May:

6-May 13 May 20 f

!(

e