ML20058J879
| ML20058J879 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 11/18/1993 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Hutchinson C Entergy Operations |
| References | |
| NUDOCS 9312140282 | |
| Download: ML20058J879 (3) | |
Text
W s
t NOV I 81993 i/
e L
s
- Docket No.: 50-416 License No.: NPF-29 j
Entergy Operations, Inc.
ATTN:
C. R. Hutchinson, Vice President Operations - Grand Gulf Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150
.l Gentlemen
SUBJECT:
NRC INSPECTION REPORT NO. 50-416/93-14 This will acknowledge receipt of your response of November 8,1993, to our Notice of Violation issued on October 8, 1993, concerning activities conducted
)
at your Grand Gulf facility.
Your response to item No. 3 lacked specific details regarding corrective steps to be taken to preclude further violations.
NRC Inspection Report 50-416/
93-14 specifically requested that particular attention be given in your response to the identification of the root cause of the violation and corrective actions to prevent recurrence since this violation was "similar" to-a previous violation.
During a conversation of November 12, 1993, between Mr. Bernhard of my staff and Mr. Daughtery of your staff, Mr. Daughtery agreed that a revised response to Item No. 3 will be provided to this office by November 22, 1993.
If your understanding is different, please contact us promptly.
The response directed by this letter is not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Your cooperation in this matter is appreciated.
Sincerely, 13(107.1 e~'~
,r w
DAVO M. YZELLt David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects cc:
(See page 2) 9312140282 931118 PDR ADOCK 05000416 O
PDR g9 ZEDf
u i
-Entergy Operations, Inc.
2 NOV l 81993 cc: Mr. H. W. Keiser, Executive Vice l
l' President and Chief Operating Officer l-Entergy Operations, Inc.
i P. O. Box 31995 Jackson, MS 39286-1995 ll l
D. L. Pace i
General Manager i
Grand Gulf Nuclear Station Entergy Operations, Inc.
l P. O. Box 756 Port Gibson, MS 39150 M. J. Meisner, Director Nuclear Safety and Regulatory Affairs Entergy Operations, Inc.
P. O. Box 756 Port Gibson, MS 39150 Mike Morre, Attorney General Frank Spencer, Asst. Attorney General State of Mississippi P. O. Box 22947 Jackson, MS 39225 J. R. McGaha Vice President, Operations Support Entergy Operations, Inc.
P. O. Box 31995 Jackson, MS 39286-1995 R. B. McGehee, Esq.
l l
Wise, Carter, Child, I
and Caraway P. O. Box 651 Jackson, MS 39205 N. S. Reynolds, Esq.
Winston & Strawn 1400 L Street, NW,12th Floor r
Washington, D. C.
20005-3502 F. E. Thompson, Jr., M.D.
State Health Officer State Board of Health P. O. Box 1700 Jackson, MS 39205 (cc cont'd - See page 3) l l
E
~
I Entergy Operations, Inc.
3 IOIE (cc w/ encl cont'd)
The Honorable William J. Guste, Jr.
Attorney General Department of Justice j
State of Louisiana l
P. O. Box 94005
)
Baton Rouge, LA 70804-9005
)
i Office of the Governor
{
State of Mississippi Jackson, MS 39201 i
i I
Sam Mabry, Chief Hazardous Waste Division Mississippi Department of 1
Environmental Quality
)
P. O. Box 10385 i
)
Jackson, MS 39209 President l
Clairborne County Board i
of Supervisors Port Gibson, MS 39150
)
K. G. Hess Vice President Bechtel Power Corporation P. O. Box 2166 i
Houston, TX 77252-2166 j
W. W. Watson Project Manager Bechtel Power Corporation P. O. Box 808 4600 W. Main Russellville, AR 72801 bec w/ enc 1:
P. O'Connor, NRR W. Beckner, NRR 1
F. Cantrell, RII Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission Route 2, Box 399 Port Gibson, MS 39150 Rll:DRP q6 FCantrell:tj 11/()/93 i
l I