ML20058J848
| ML20058J848 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 12/07/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 9312140264 | |
| Download: ML20058J848 (3) | |
Text
p R M Grq UfdlTE D STAT ES ff g
NUCLEAR REGULATORY COMMISSION PI S
REGION IV 2.;
cs8 611 RYAN PLAZA DRIVE, SUITE 400 o.
Y,
[
ARLINGTON, TEXAS 76011-8064 DEC - T 1993 l
NOTICE OF SIGNIFICANT LICENSEE MEETING i
fiame of Licensee:
Entergy Operations, Inc.
)
Name of Facility:
Waterford 3 Steam Electric Station Docket No.:
50-382 Date and Time December 21, 1993 of Meeting:
3 p.m.
Location of Meeting: Waterford 3 site. Taft, Louisiana t
Energy Education Center Purpose of Meeting:
Presentation of Systematic Assessment of Licensee i
Performance (SALP) results for the period ending October 30, 1993 i
NRC Attendees:
W. Beckner, Project Directorate IV-1, Office of Nuclear Reactor Regulation J. Dixon-Herrity, Resident Inspector, Waterford 3 E. Ford, Senior Resident Inspector, Waterford 3 J. Gilliland, Public Affairs Officer T. Gwynn, Deputy Director, Division of Reactor Projects'(DRP)
C. Hackney, State liaison Officer i
J. Milhoan, Regional Administrator T. Stetka, Chief, Project Section D, DRP j
I Licensee Attendees:
R. Azzarello, Director, Design Engineering R. Barkhurst, Vice President, Operations R. Burski, Director, Nuclear Safety G. Dewease, Vice President, Operations Support D. Hintz, President and Chief Executive Officer i
H. Keiser, Chief Operating Officer L. Laughlin, Licensing Manager D. Pack.er, General Manager, Plant Operations F. Titus, Vice President, Engineering D. Vinci, Operations Superintendent NOTE:
(1) Attendance by other NRC personnel at this meeting should be made known by COB on December 20 via telephone call to Tom Stetka (817/860-8247).
l 9312140264 931207 PDR ADOCK 05000382 G
r Entergy Operations, Inc. t (2) This meeting is open to attendance by members of the general public.
mat)
Approved By:
/
ua i
A. bill Beach, Director Division of Reactor Projects i
I l
i
)
l
o
(
DEC -T 1993 Entergy Operations, Inc.
-3
^
r Distribution:
DMB (IE 45)
\\%
l J. H. Sniezek, D OR (MS 17G21)
H. L. Thompson, DEDS (MS 17G21) i T. E. Murley, D/NRR (MS 12D1)
W. T. Russell, ADT/NRR (MS 12G18) i J. G. Partlow, ADP/NRR (MS 12D9)
J. Lieberman, D/0E (MS 7H5)
L. J. Chandler, 0GC (MS 15B18)
OED0 RIV Coordinator (MS 17G21)
J. M. Montgomery, DRA G. F. Sanborn, E0 NRC Attendees RA Secretary l
Carol Gordon Division Secretary (DRP)
L. S. Ousley RIV File i
l 1301'1 l
RIV:C:DRP/0.
PA0 ' h/
RSLO D:$
TFStetka;df JTGi'Iriland CAHackney ABE ch 12/ 7 /93 12/~7 /93 12/" /93 12/]/93 l
l 1
-