Requests Approval of Revision to General Project Design Criteria,Incorporating Changes Requested in NRC , W/Exception of Section 3.2.7.River Flow Data Will Be Collected from USGS Gaging Stations
ML20058J593
Person / Time
Site: Crane 
Issue date: 08/06/1982
From: Kanga B
GENERAL PUBLIC UTILITIES CORP.
To: Barrett L
Office of Nuclear Reactor Regulation
References
4400-82-L-0131, 4400-82-L-131, NUDOCS 8208110116
Download: ML20058J593 (1)


Text

GPU Nuclear G~

U GM

  • 48 Middletown. Pennsylvanja 17057 717-944-7621 Writer's Direct Dial Number:

August 6, 1982 4400-82-L-0131 M Program Office Attn: Mr. L. H. Barrett, Deputy Program Director US Nuclear Regulatory Conmission c/o Three Mile Island Nuclear Station Middletown, PA 17057

Dear Sir:

Three Mile Island Nuclear Station, Unit 2 ( M -2)

Operating License No. DPR-73 Docket No. 50-320 Revision to the General Project Design Criteria (GPDC)

'Ihis is to inform you that the M-2 General Project Design Criteria (GFDC) are being revised. 'Ihis revision (Revision 2) will incorporate the changes requested in NRC letter NRC/ M 018 (L. H. Barrett to J. J.

Barton) dated April 1, 1982, with the exception of Section 3.2.7.

NRC review and approval of this exception is requested.

The subject NRC letter states that environmental analyses should be based on river flow data as provided in the Off-site Dose Calculation Manual (ODW), instead of the information in the M-2 Final Safety Analysis Report (FSAR). However, as there are no river flow data provided in the OD W, GPU proposes to continue using the current method of telephoning the USGS gaging stations at either Harrisburg or the York Haven Dam for the actual flow rate. In order to calculate postulated off-site doses due to liquid effluent releases for use in engineering designs or accident analyses, GPU proposes to use the mean, maxima, and minima data for river flow rate presented in the FSAR as these data are more appropriate in this case.

Your expeditious review of this proposal is requested. If you Fave any questions please contact Mr. J. E. Larson.

B

,a O

Sincerely, f=

gc-

!/ //

is.5 l

f,/QMyb B. K. Kanga /

3 SU Director, TMI-2 ge y

BKK/JJB/jep y

o CC:

B. J. Snyder, Program Director

'IMI Program Office 8208110116 820806 PLR ADOCK 05000320 P